- -

An approach to a maintenance plan for a turbine of hydroelectric power plant. Optimisation based in RCM and FMECA analysis

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

An approach to a maintenance plan for a turbine of hydroelectric power plant. Optimisation based in RCM and FMECA analysis

Show full item record

Martinez-Monseco, FJ. (2021). An approach to a maintenance plan for a turbine of hydroelectric power plant. Optimisation based in RCM and FMECA analysis. Journal of Applied Research in Technology & Engineering. 2(1):39-50. https://doi.org/10.4995/jarte.2021.14761

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/161621

Files in this item

Item Metadata

Title: An approach to a maintenance plan for a turbine of hydroelectric power plant. Optimisation based in RCM and FMECA analysis
Author: Martinez-Monseco, Francisco Javier
Issued date:
Abstract:
[EN] The generation of electric energy is a continuous process of great strategic importance in the development of countries. The evolution in the last decades of different environmental control protocols at a global level ...[+]
Subjects: Maintenance , Reliability , Power plants , Industrial processes
Copyrigths: Reconocimiento - No comercial - Compartir igual (by-nc-sa)
Source:
Journal of Applied Research in Technology & Engineering. (eissn: 2695-8821 )
DOI: 10.4995/jarte.2021.14761
Publisher:
Universitat Politècnica de València
Publisher version: https://doi.org/10.4995/jarte.2021.14761
Thanks:
The author is grateful for the transmission of the best practices to the staff of the UPH Ebro Pirineos of the company Enel Green Power Hydro Iberia. Especially to Maria Soledad Ordoñez (Director UPH) and Luis Leon (Head ...[+]
Type: Artículo

This item appears in the following Collection(s)

Show full item record