Mostrar el registro sencillo del ítem
dc.contributor.advisor | Roldán Porta, Carlos | es_ES |
dc.contributor.advisor | Badenes Badenes, Borja | es_ES |
dc.contributor.author | Sanz Sabugo, Ignacio | es_ES |
dc.coverage.spatial | east=-1.1036884570777783; north=40.34702697862335; name=Calle Portillo, 6, 44003 Teruel, Espanya | es_ES |
dc.date.accessioned | 2021-03-03T08:34:20Z | |
dc.date.available | 2021-03-03T08:34:20Z | |
dc.date.created | 2020-11-24 | |
dc.date.issued | 2021-03-03 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/162886 | |
dc.description.abstract | [ES] El presente documento trata de la realización de un proyecto de instalaciones de un edificio de 14 viviendas, aparcamientos y 4 locales diáfanos. En la planta baja se ubicarán los aparcamientos, un local diáfano y los accesos. La primera planta está formada por 4 viviendas y 3 locales diáfanos. Luego, las plantas 2 y 3 estarán dedicadas exclusivamente a viviendas, con 5 en cada planta. El diseño y cálculo de las instalaciones que se han realizado en este proyecto son las siguientes: Instalación eléctrica: Instalación eléctrica de viviendas y aparcamientos, previendo una posible instalación de recarga de coches eléctricos en todas las plazas y electrificación elevada en las viviendas. Instalación de suministro de agua: Instalación desde la acometida a la centralización de contadores, y luego hasta cada uno de los aparatos del edificio, asegurando una presión suficiente. Instalación de ACS: Instalación de paneles solares para el cumplimiento de la contribución mínima solar, HE4, para ACS con depósito común en planta baja, que reparte a las viviendas. Instalación de saneamiento: Instalación de saneamiento para aguas pluviales a través de canalones y bajantes para recoger el agua de la cubierta y expulsarla a la calle. Instalación de saneamiento de aguas residuales de los cuartos húmedos. Todo ello se desarrolla en el documento, junto con sus cálculos y planos de cada una de las instalaciones. Además también se incluyen los presupuestos de las instalaciones. | es_ES |
dc.description.abstract | [EN] This document consists of the realization of an installation project for a building with 14 dwelling, garage and 4 open-plans premises. On the ground floor will be the garage, an openspace and the accesses. The first floor is made up of 4 dwelling and 3 open-plans. Then, the second and third floor will be dedicated exclusively to dwelling, with 5 on each floor. The design and calculation of the facilities that have been carried out in this project are as follows: Electrical installation: Electrical installation of dwelling and garage, foreseeing a possible installation of recharging electric cars in all squares and high electrification. Installation of water supply: Installation from the connection to the centralization of water meters, and then to each of the sanitary equipment, ensuring sufficient pressure. DHW Installation: Installation of solar panels to comply with minimum solar contribution and with a common deposit on the ground floor, which is distributed to sanitary equipment. Sanitation facility: Sanitation facility for rainwater though gutters and downspouts to collect water from the roof and expel it to the street. Sanitation facility of sewage from wet rooms. Everything is developed in the document, their respective calculations and plans for each of the facilities. In addition, the budgets are also included. | es_ES |
dc.format.extent | 236 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Instalación | es_ES |
dc.subject | Suministro de agua | es_ES |
dc.subject | ACS | es_ES |
dc.subject | Saneamiento | es_ES |
dc.subject | Eléctrica | es_ES |
dc.subject | Instalaciones en la edificación | es_ES |
dc.subject | Fontanería | es_ES |
dc.subject | Agua caliente sanitaria | es_ES |
dc.subject | Instalación eléctrica. | es_ES |
dc.subject | Installation | es_ES |
dc.subject | Water supply | es_ES |
dc.subject | DHW | es_ES |
dc.subject | Sanitation | es_ES |
dc.subject | Electric. | es_ES |
dc.subject.classification | MECANICA DE FLUIDOS | es_ES |
dc.subject.classification | INGENIERIA ELECTRICA | es_ES |
dc.subject.other | Máster Universitario en Ingeniería Industrial (Acceso desde Grado I. Electrónica Industrial y Automática)-Màster Universitari en Enginyeria Industrial (Accés des de Grau I. Electrònica Industrial i Automàtica) | es_ES |
dc.title | Proyecto de instalaciones de suministro de agua, ACS, saneamiento y electricidad de un edificio de 14 viviendas ubicado en Teruel | es_ES |
dc.type | Tesis de máster | es_ES |
dc.rights.accessRights | Cerrado | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería Eléctrica - Departament d'Enginyeria Elèctrica | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials | es_ES |
dc.description.bibliographicCitation | Sanz Sabugo, I. (2020). Proyecto de instalaciones de suministro de agua, ACS, saneamiento y electricidad de un edificio de 14 viviendas ubicado en Teruel. Universitat Politècnica de València. http://hdl.handle.net/10251/162886 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\135854 | es_ES |