Mostrar el registro sencillo del ítem
dc.contributor.advisor | Roldán Blay, Carlos | es_ES |
dc.contributor.advisor | Roldán Porta, Carlos | es_ES |
dc.contributor.author | Flores Arpi, Leticia Fernanda | es_ES |
dc.date.accessioned | 2021-10-13T17:34:40Z | |
dc.date.available | 2021-10-13T17:34:40Z | |
dc.date.created | 2021-09-24 | |
dc.date.issued | 2021-10-13 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/174641 | |
dc.description.abstract | [ES] En la presente memoria se elabora el diseño de una planta fotovoltaica ubicada en suelo, con seguimiento solar y la energía producida se evacua a la red de distribución. Como punto de partida se establece la potencia fotovoltaica que se desea producir de unos 2 MWp. Se realiza un estudio de alternativas en cuatro aspectos: emplazamiento, tecnología de módulos, tipología de seguimiento y tecnología del sistema de conversión. En base a la selección final de las alternativas se elabora un dimensionado de los componentes eléctricos necesarios, distribución en las parcelas y cálculos del cableado eléctrico El resultado es una instalación fotovoltaica conectada a una red de 13,2 kV con un total de 2,16 MWp de potencia fotovoltaica, formada por 6000 módulos de 360 Wp de tecnología PERC. La potencia nominal de la instalación es de 1,98 MW proporcionada por seis inversores centrales de 330 kW con tres etapas de potencia independientes cada uno. Los inversores se agrupan en dos estaciones donde se evacua la energía a su respectivo transformador de potencia de 1000 MW. El total de la energía producida se transporta mediante una línea subterránea de 13,2 kV hasta un Centro de Protección y Medida, en el cual se realiza el conexionado con la red. Con el programa PVSYST se calcula la producción energética, en MWh, así como el rendimiento de la instalación estimando las pérdidas de los componentes. Finalmente, con los componentes determinados se elabora un presupuesto de inversión y general, como punto de partida para un análisis de viabilidad económica en caso de llegar a implementarse este proyecto. Con los valores del VAN, PAYBACK y TIR se obtiene un balance altamente positivo y viable, a pesar de la volatilidad del precio de venta de la energía, tras la pandemia Covid-19. Al final del documento se anexa la cédula parcelaria, el informe completo de PVSYST y las hojas de datos de los elementos más relevantes. | es_ES |
dc.description.abstract | [EN] This report is written in order to design a phovoltaic solar plant, locate on the land, with solar tracking and connected to the grid. As starting point, the plant will have about 2 MWp of solar capacity. Among four option alternatives: setting-up location, cell tecnhology, solar tracker system and the power inverter system. This study is needed to design and built the photovoltaic plant. As a result the previous study, the project focuses on description all of devices, the land requirements, wiring and all calculations for electrical circuits. As a result, we have a photovoltaic plant connected to the grid of 13.2 kV with 2.16 MWp solar peak capacity, made up of 6000 modules of 360 Wp of PERC cell technology. The nominal power is 1.98 MW provided by six 330 kW central inverters with three independent power stages each. The inverters are grouped in two stations where energy produced is evacuated to its respective transformer (1000 MW). The total energy produced is transported through a 13.2 kV underground line towards Centro de Protección y Medida, where there is point connected to the grid. Moreover, we hace taken into account the stimated global energy production by plant thanks to a phovoltaic software PVSYST, as well as the performance ratio (PR), considering the losses of components. Finally, comparing three main financial indicators let us carry out a financial study: PayBack time, Net Present Value (NPV) and Internal Rate of Return (IRR). For this analysis it has been taken into account the final cost of the whole installation the investment and general. Results show that the plant needs about nine years to return the initial investment and NPV is positive. This conducts us to think that this photovoltaic solar tracker plant is economical profitable. This conclusion is considered good in spite of the world changed drastically with the COVID-19 pandemic. At the end of the paper, cedula parcelaria, the PVSYST report and datasheets of mains components are included in ANEXOS. | es_ES |
dc.format.extent | 165 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Solar | es_ES |
dc.subject | Fotovoltaica | es_ES |
dc.subject | Energía eléctrica | es_ES |
dc.subject | Alta tensión | es_ES |
dc.subject.classification | INGENIERIA ELECTRICA | es_ES |
dc.subject.other | Máster Universitario en Ingeniería Industrial-Màster Universitari en Enginyeria Industrial | es_ES |
dc.title | Proyecto de instalación solar fotovoltaica de 2 MWp con seguimiento solar en Arguedas (Navarra) con vertido a red | es_ES |
dc.type | Tesis de máster | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería Eléctrica - Departament d'Enginyeria Elèctrica | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials | es_ES |
dc.description.bibliographicCitation | Flores Arpi, LF. (2021). Proyecto de instalación solar fotovoltaica de 2 MWp con seguimiento solar en Arguedas (Navarra) con vertido a red. Universitat Politècnica de València. http://hdl.handle.net/10251/174641 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\146334 | es_ES |