Mostrar el registro sencillo del ítem
dc.contributor.author | Martí Albiñana, José Vicente | es_ES |
dc.contributor.author | Gonzalez Vidosa, Fernando | es_ES |
dc.contributor.author | Yepes, V. | es_ES |
dc.date.accessioned | 2022-01-28T07:13:06Z | |
dc.date.available | 2022-01-28T07:13:06Z | |
dc.date.issued | 2017-07-05 | es_ES |
dc.identifier.isbn | 978-84-947311-0-5 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/180309 | |
dc.description.abstract | [EN] The application of metaheuristic techniques enables optimizing structures for economic aspects, greenhouse effects, energy consumption and other life cycle impacts. Structural designs obtained with the application of the heuristic algorithms vary according to the above mentioned objectives and with the values of the parameters determined by the boundary conditions of structures and materials. The featured paper presents the cost optimization of prestressed concrete (PC) precast road bridges. The beam has a U-shape cross-section. The deck has a span of 35 m and 12 m in width. The Simulated Annealing algorithm (SA) is used for obtaining the cross-section transverse geometric dimensions, the concrete class and the active and passive reinforcement amounts. Our example is defined by 59 discrete design variables. SA algorithm requires the calibration of the initial temperature, the number of variables modified in each iteration, the length of the Markov chains and the cooling coefficient. It all is subject to the Spanish Structural Concrete Code EHE. The overall objective is to determine whether the structural design is influenced by the unit prices. Hence, different economic scenarios are presented where the concrete and steel unit prices vary. The results show that the application of heuristic techniques delivers structural designs that adapt to the variation of unit prices, in order to reduce the overall cost of the resulting structural design. In this study, an increment in the steel price leads to a reduction in the steel amount, increasing the concrete amount, and vice versa. | es_ES |
dc.description.sponsorship | Este estudio ha sido financiado por el Ministerio Español de Economía y Competitividad y fondos FEDER (proyecto de investigación BIA2014-56574-R) | es_ES |
dc.language | Español | es_ES |
dc.publisher | International Center for Numerical Methods in Engineering (CIMNE) | es_ES |
dc.relation.ispartof | Congreso de Métodos Numéricos en Ingeniería (CMN 2017). Actas | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Cost sensitivity analysis | es_ES |
dc.subject | Bridges design | es_ES |
dc.subject | Heuristic optimisation | es_ES |
dc.subject | Metaheuristic techniques | es_ES |
dc.subject | Structures | es_ES |
dc.subject | Prestressed concrete | es_ES |
dc.subject.classification | INGENIERIA DE LA CONSTRUCCION | es_ES |
dc.title | Cost sensitivity analysis in bridges design | es_ES |
dc.type | Comunicación en congreso | es_ES |
dc.type | Capítulo de libro | es_ES |
dc.relation.projectID | info:eu-repo/grantAgreement/MINECO//BIA2014-56574-R/ES/TOMA DE DECISIONES EN LA GESTION DEL CICLO DE VIDA DE PUENTES PRETENSADOS DE ALTA EFICIENCIA SOCIAL Y MEDIOAMBIENTAL BAJO PRESUPUESTOS RESTRICTIVOS/ | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil | es_ES |
dc.description.bibliographicCitation | Martí Albiñana, JV.; Gonzalez Vidosa, F.; Yepes, V. (2017). Cost sensitivity analysis in bridges design. International Center for Numerical Methods in Engineering (CIMNE). 1259-1275. http://hdl.handle.net/10251/180309 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.conferencename | Congreso de Métodos Numéricos en Ingeniería (CMN 2017) | es_ES |
dc.relation.conferencedate | Julio 03-05,2017 | es_ES |
dc.relation.conferenceplace | Valencia, Spain | es_ES |
dc.relation.publisherversion | http://congress.cimne.com/cmn2017/frontal/default.asp | es_ES |
dc.description.upvformatpinicio | 1259 | es_ES |
dc.description.upvformatpfin | 1275 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.relation.pasarela | S\340807 | es_ES |
dc.contributor.funder | MINISTERIO DE ECONOMIA Y EMPRESA | es_ES |