Mostrar el registro completo del ítem
Yepes-Borrero, JC.; Perea, F.; Ruiz García, R.; Villa Juliá, MF. (2021). Bi-objective parallel machine scheduling with additional resources during setups. European Journal of Operational Research. 292(2):443-455. https://doi.org/10.1016/j.ejor.2020.10.052
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/184689
Título: | Bi-objective parallel machine scheduling with additional resources during setups | |
Autor: | Yepes-Borrero, Juan C. | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] We present a bi-objective parallel machine scheduling problem with machine and job sequence dependent setup times, with the additional consideration of resources needed during setups. The availability of such resources ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | https://doi.org/10.1016/j.ejor.2020.10.052 | |
Código del Proyecto: |
...[+] |
|
Agradecimientos: |
The authors would like to acknowledge the support from "Ministerio de Ciencia, Innovacion y Universidades" under grant "Optimizacion de Operaciones en Terminales Portuarias (OPTEP)" (No. RTI2018-094940-B-100) and grant ...[+]
|
|
Tipo: |
|