- -

Group Scheduling With Nonperiodical Maintenance and Deteriorating Effects

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Group Scheduling With Nonperiodical Maintenance and Deteriorating Effects

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Xu, Haiyan es_ES
dc.contributor.author Li, Xiaoping es_ES
dc.contributor.author Ruiz García, Rubén es_ES
dc.contributor.author Zhu, Haihong es_ES
dc.date.accessioned 2022-07-22T18:06:17Z
dc.date.available 2022-07-22T18:06:17Z
dc.date.issued 2021-05 es_ES
dc.identifier.issn 2168-2216 es_ES
dc.identifier.uri http://hdl.handle.net/10251/184693
dc.description.abstract [EN] In this paper, we consider single-machine group scheduling with nonperiodical maintenance and deteriorating effects. Nonperiodical maintenance, which has unfixed maintaining interval or the number of jobs in each group is unfixed, results in a variable number of groups. Deteriorating effects lead to longer processing times of which the deterioration index depends on job grouping. This problem is of significance in different production settings and is much more difficult than and general that other simpler single-machine group scheduling problems. Making use of historical processing times, we construct the actual processing time model for jobs. We prove that the problem under study is NP-hard. By transforming the optimization objective, properties are discovered and two batch-based heuristics are presented for small size problems. To further improve the effectiveness for large size problems, an iterated greedy algorithm is proposed being its main advantages simplicity and effectiveness. The proposed methods are evaluated over a large number of random instances with calibrated parameters and components. Comprehensive computational and statistical analyses demonstrate the superiority of the methods proposed over adapted existing approaches es_ES
dc.description.sponsorship This work was supported in part by the National Key Research and Development Program of China under Grant 2017YFB1400801, in part by the National Natural Science Foundation of China under Grant 61572127, Grant 61872077, and Grant 61832004, and in part by the Collaborative Innovation Center of Wireless Communications Technology. The work of R. Ruiz was supported by the Spanish Ministry of Economy and Competitiveness through the Project "SCHEYARD-Optimization of Scheduling Problems in Container Yards" with FEDER funds under Grant DPI2015-65895-R. This paper was recommended by Associate Editor W. Shen es_ES
dc.language Inglés es_ES
dc.publisher Institute of Electrical and Electronics Engineers es_ES
dc.relation.ispartof IEEE Transactions on Systems, Man, and Cybernetics: Systems es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Maintenance engineering es_ES
dc.subject Single machine schedulin es_ES
dc.subject Job shop scheduling es_ES
dc.subject Analytical models es_ES
dc.subject Time series analysis es_ES
dc.subject Indexes es_ES
dc.subject Deteriorating effects es_ES
dc.subject Group scheduling es_ES
dc.subject Nonperiodical maintenance es_ES
dc.subject Single machine es_ES
dc.subject.classification ESTADISTICA E INVESTIGACION OPERATIVA es_ES
dc.title Group Scheduling With Nonperiodical Maintenance and Deteriorating Effects es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.1109/TSMC.2019.2917446 es_ES
dc.relation.projectID info:eu-repo/grantAgreement/MINECO//DPI2015-65895-R/ES/OPTIMIZATION OF SCHEDULING PROBLEMS IN CONTAINER YARDS/ es_ES
dc.relation.projectID info:eu-repo/grantAgreement/NSFC//61832004/ es_ES
dc.relation.projectID info:eu-repo/grantAgreement/NSFC//61872077/ es_ES
dc.relation.projectID info:eu-repo/grantAgreement/NSFC//61572127/ es_ES
dc.relation.projectID info:eu-repo/grantAgreement/NKRDPC//2017YFB1400801 / es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Estadística e Investigación Operativa Aplicadas y Calidad - Departament d'Estadística i Investigació Operativa Aplicades i Qualitat es_ES
dc.description.bibliographicCitation Xu, H.; Li, X.; Ruiz García, R.; Zhu, H. (2021). Group Scheduling With Nonperiodical Maintenance and Deteriorating Effects. IEEE Transactions on Systems, Man, and Cybernetics: Systems. 51(5):2860-2872. https://doi.org/10.1109/TSMC.2019.2917446 es_ES
dc.description.accrualMethod S es_ES
dc.relation.publisherversion https://doi.org/10.1109/TSMC.2019.2917446 es_ES
dc.description.upvformatpinicio 2860 es_ES
dc.description.upvformatpfin 2872 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 51 es_ES
dc.description.issue 5 es_ES
dc.relation.pasarela S\434428 es_ES
dc.contributor.funder MINISTERIO DE ECONOMIA Y EMPRESA es_ES
dc.contributor.funder National Natural Science Foundation of China es_ES
dc.contributor.funder National Key Research and Development Program of China es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem