- -

Gráficos de control para la monitorización conjunta del tiempo entre eventos y su amplitud con amplitudes multidimensionales

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Gráficos de control para la monitorización conjunta del tiempo entre eventos y su amplitud con amplitudes multidimensionales

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Giner Bosch, Vicent es_ES
dc.contributor.advisor Castagliola, Philippe es_ES
dc.contributor.author Secaduras López, Nuria es_ES
dc.date.accessioned 2022-10-18T09:53:24Z
dc.date.available 2022-10-18T09:53:24Z
dc.date.created 2022-09-26 es_ES
dc.date.issued 2022-10-18 es_ES
dc.identifier.uri http://hdl.handle.net/10251/188108
dc.description.abstract [ES] En este trabajo, se aborda el diseño, implementación y análisis de gráficos de control para la monitorización del tiempo entre eventos o sucesos y, al mismo tiempo, la amplitud o tamaño de dichos eventos (lo cual se conoce en inglés como "time between events and amplitude", TBEA). Concretamente, se estudia el caso, inédito en la literatura, en que la amplitud tiene carácter multidimensional. Esto puede ser de interés en muchos contextos reales (por ejemplo, medir el tiempo entre incendios y, al mismo tiempo, su gravedad, etc.). Se proponen tres modelos para la monitorización conjunta del tiempo y la amplitud. Para cada uno de ellos, se obtiene de manera analítica la función de distribución del estadístico monitorizado. A partir de esto, se diseñan gráficos de control unilaterales para detectar el empeoramiento o degradación del fenómeno objeto de interés (en concreto, la disminución del tiempo entre sucesos y/o incrementos de la amplitud de dichos sucesos). El diseño de los gráficos propuestos se implementa en lenguaje R. Posteriormente, se realizan pruebas computacionales orientadas a valorar la aptitud de estos gráficos para detectar diferentes situaciones de degradación o falta de control. De esta forma, y mediante tanto técnicas de diseño de experimentos clásicas como métodos robustos frente a las condiciones que presente la batería de pruebas generada, se puede analizar el comportamiento de los tres modelos propuestos en diversos escenarios. Así, en base a los resultados obtenidos, se llega a conclusiones que permiten conocer qué parámetros son más influyentes en el rendimiento del gráfico y cuál de los tres enfoques planteados resulta más conveniente en función del contexto y de los requerimientos del usuario final. Por último, se ejemplifica la aplicación del gráfico de control diseñado mediante la simulación de un caso práctico basado en datos reales. es_ES
dc.description.abstract [EN] In this paper, we address the design, implementation and analysis of control charts for joint monitoring the time between events or occurrences and the amplitude or size of these events (known as time between events and amplitude, TBEA). In particular, we study the case ¿unprecedented in the literature¿ where amplitude has a multidimensional character. This may be of interest in many real-world contexts (e.g. measuring the time between fires and, at the same time, their severity, etc.). We propose three models for the joint monitoring of time and amplitude. For each of them, the distribution function of the monitored statistic is obtained analytically. From this, one-sided control charts are designed to detect the worsening or deterioration of the phenomenon of interest (specifically, the decrease in the time between events and/or increases in the amplitude of these events). The design of the proposed graphs is implemented in software R. Subsequently, computational tests are performed to evaluate the aptitude of these graphs to detect different situations of degradation or lack of control. In this way, and by means of classical design of experiments techniques and robust methods that consider the conditions presented in the battery of tests generated, the behaviour of the three proposed models can be analysed in different scenarios. Therefore, based on the results obtained, conclusions can be drawn as to which parameters are most influential in the performance of the graph and which of the three proposed approaches is most suitable depending on the context and the requirements of the end user. Finally, we present an example about the application of the designed control chart by simulating a practical case based on real data. en_EN
dc.format.extent 90 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reconocimiento - No comercial - Compartir igual (by-nc-sa) es_ES
dc.subject Gráficos de control es_ES
dc.subject Tiempo entre eventos es_ES
dc.subject Procesos multivariantes es_ES
dc.subject Distribución gamma es_ES
dc.subject Distribución Weibull es_ES
dc.subject Control charts en_EN
dc.subject Time between events en_EN
dc.subject Multivariate processes en_EN
dc.subject Gamma distribution en_EN
dc.subject Weibull distribution en_EN
dc.subject.classification ESTADISTICA E INVESTIGACION OPERATIVA es_ES
dc.subject.other Máster Universitario en Ingeniería de Análisis de Datos, Mejora de Procesos y Toma de Decisiones-Màster Universitari en Enginyeria D'Anàlisi de Dades, Millora de Processos i Presa de Decisions es_ES
dc.title Gráficos de control para la monitorización conjunta del tiempo entre eventos y su amplitud con amplitudes multidimensionales es_ES
dc.title.alternative Control charts for joint monitoring of time between events and amplitude with multidimensional amplitudes es_ES
dc.title.alternative Gràfics de control per al monitoratge conjunt del temps entre esdeveniments i l'amplitud amb amplituds multidimensionals es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Estadística e Investigación Operativa Aplicadas y Calidad - Departament d'Estadística i Investigació Operativa Aplicades i Qualitat es_ES
dc.description.bibliographicCitation Secaduras López, N. (2022). Gráficos de control para la monitorización conjunta del tiempo entre eventos y su amplitud con amplitudes multidimensionales. Universitat Politècnica de València. http://hdl.handle.net/10251/188108 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\152473 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem