- -

The need to implement Cultural Heritage Master Plans through the Building Information Modelling methodology

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

  • Estadisticas de Uso

The need to implement Cultural Heritage Master Plans through the Building Information Modelling methodology

Show simple item record

Files in this item

dc.contributor.author Liu, Junshan es_ES
dc.contributor.author Galiano Garrigos, Antonio es_ES
dc.contributor.author García Valldecabres, Jorge Luis es_ES
dc.date.accessioned 2023-01-12T08:54:15Z
dc.date.available 2023-01-12T08:54:15Z
dc.date.issued 2022-12-30
dc.identifier.issn 1888-8143
dc.identifier.uri http://hdl.handle.net/10251/191267
dc.description.abstract [EN] The Master Plans (MP) used for Architectural Cultural Heritage conservation require specific standards for the documentation process. They must facilitate the achievement of the intended objectives about the knowledge acquisition and conservation of the building assets throughout the entire building lifecycle. Over time, the documentation of an MP, once the heritage building is under use, tends to become dispersed and the documentation generated during the building use is rarely introduced in the MP. Therefore, this contribution has the following objectives: 1) study of the requirements of MP deliverables; 2) study of the maturation requirements of the documentation processes and deliverables that are generated when applying the Building Information Modelling (BIM) methodology to an MP; 3) investigate if the application of the BIM strategies are suitable to respond to the needs of an MP in such a way that knowledge and conservation of heritage buildings are achieved; 4) verify that the exchange of information and the collaborative work among the different disciplines that generate documentation and deliverables guarantee a single, comprehensive, open, three-dimensional, and clear repository. es_ES
dc.description.abstract [ES] Los Planes Directores (PD) sobre el Patrimonio Cultural arquitectónico requieren de unos estándares específicos de organización de la documentación que faciliten la obtención de los objetivos pretendidos sobre el conocimiento y la conservación de los bienes edilicios a lo largo de todo su ciclo de vida. A lo largo del tiempo, la documentación de un PD tiende a dispersarse e incluso es raramente integrada en el PD durante el uso del edificio. Por ello, se plantea la presente contribución con los siguientes objetivos: 1) Estudiar los requisitos de los entregables de los PD. 2) Estudiar los requisitos de maduración de los procesos y entregables documentales que se generan al aplicar la metodología Building Information Modelling (BIM) en un PD. 3) Verificar si la aplicación de las estrategias BIM son adecuadas para dar respuesta a las necesidades de un PD de tal forma que se logre el conocimiento y conservación de las edificaciones patrimoniales. 4) Verificar que el intercambio de información y el trabajo colaborativo entre las diferentes disciplinas que generan documentación y entregables garanticen un repositorio único, integral, abierto, tridimensional y claro. es_ES
dc.description.sponsorship This contribution belongs to the work of the project financed by the Ministry of Science and Innovation of the Government of Spain, in a public call, for the development of the R+D+I project entitled Analysis and development of the integration of HBIM in GIS for the elaboration of a tourism planning protocol for the cultural heritage of a destination (PID2020-119088RB-I00) led by a team from the Polytechnic University of Valencia in collaboration with the universities of Alicante and Auburn, Alabama, USA.
dc.language Inglés es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.relation.ispartof EGE Revista de Expresión Gráfica en la Edificación es_ES
dc.rights Reconocimiento (by) es_ES
dc.subject Cultural Heritage es_ES
dc.subject Facilities Management es_ES
dc.subject Heritage Building Information Modelling (HBIM) es_ES
dc.subject Master Plan es_ES
dc.subject Patrimonio Cultural es_ES
dc.subject Plan Director es_ES
dc.subject Gestión es_ES
dc.title The need to implement Cultural Heritage Master Plans through the Building Information Modelling methodology es_ES
dc.title.alternative La necesidad de implementar a través de la metodología Building Information Modelling los Planes Directores del Patrimonio Cultural es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.4995/ege.2022.18597
dc.relation.projectID info:eu-repo/grantAgreement/AEI//PID2020-119088RB-I00/Analysis and development of the integration of HBIM in GIS for the elaboration of a tourism planning protocol for the cultural heritage of a destination/
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Expresión Gráfica Arquitectónica - Departament d'Expressió Gràfica Arquitectònica es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Gestión en la Edificación - Escola Tècnica Superior de Gestió en l'Edificació es_ES
dc.contributor.affiliation Universitat Politècnica de València. Centro de Investigación Arquitectura, Patrimonio y Gestión para el Desarrollo Sostenible - Centre d'Investigació Arquitectura, Patrimoni i Gestió per al Desenvolupament Sostenible es_ES
dc.description.bibliographicCitation Liu, J.; Galiano Garrigos, A.; García Valldecabres, JL. (2022). The need to implement Cultural Heritage Master Plans through the Building Information Modelling methodology. EGE Revista de Expresión Gráfica en la Edificación. (17):4-17. https://doi.org/10.4995/ege.2022.18597 es_ES
dc.description.accrualMethod OJS es_ES
dc.relation.publisherversion https://doi.org/10.4995/ege.2022.18597 es_ES
dc.description.upvformatpinicio 4 es_ES
dc.description.upvformatpfin 17 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.issue 17 es_ES
dc.identifier.eissn 2605-082X
dc.relation.pasarela OJS\18597 es_ES
dc.contributor.funder Ministerio de Ciencia e Innovación
dc.contributor.funder Agencia Estatal de Investigación
dc.description.references AEC (UK) BIM, 2012. Protocol Implementing UK BIM Standards for the Architectural, Engineering and Construction industry. Version 2.0 September 2012. es_ES
dc.description.references Almagro Gorbea, A. 2019. "Half a century documenting the Architectural Heritage with photogrametry." EGE Revista de Expresión Gráfica en la Edificación, Nº 11, Valencia: Universitat Politècnica de València. pp. 4-30. https://doi.org/10.4995/ege.2019.12863 es_ES
dc.description.references AlSehaimi, A., Koskela, L., and Tzortzopoulos, P. 2013. "Need for alternative research approaches in construction Management: Case of Delay Studies." Journal of Management in En-engineering, Vol. 29, No. 4, October 1, 2013. © ASCE, ISSN 0742-597X/2013/4-407-413. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000148 es_ES
dc.description.references Angulo Fornos, Roque. 2012. "Construcción de la base gráfica para un sistema de información y gestión del patrimonio arquitectónico: Casa de Hylas." Arqueología de la Arquitectura, 9, enero-diciembre 2012, 11-25. Madrid / Vitoria. ISSN 1695-2731.eISSN 1989-5313. https://doi.org/10.3989/arqarqt.2012.10005 es_ES
dc.description.references Bew, M., Underwood, J., Wix, J., Storer, G. 2008. Going BIM in a commercial world In eWork and eBusiness in Architecture, Engineering and Construction. Londres: Taylor &Francis. https://doi.org/10.1201/9780203883327 es_ES
dc.description.references British Standards Institution. 2014. PAS1192-3 2014. Specification for information management for the operational phase of assets using building information modelling. [online]. Accessible at: https://bim-level2.org/standards/ es_ES
dc.description.references Bruno, S., De Fino, M., Fatiguso, F. 2018. "Historic Building Information Modelling: performance assessment for diagnosis-aided information modelling and management." Automation in Construction, 86, 256-276. https://doi.org/10.1016/j.autcon.2017.11.009 es_ES
dc.description.references Buildingsmart Spanish Chapter. 2018. Guía de usuarios BIM aplicado al Patrimonio Cultural [online]. Accessible at: https://www.buildingsmart.es/bim/guías-ubim/. es_ES
dc.description.references Buildingsmart Spanish Chapter, 2019. Introducción a la serie EN-ISO 19650. es_ES
dc.description.references Castellano-Román, M. 2013. "Hacia el modelado de información patrimonial. Generación de modelos de información del patrimonio inmeble en el momento de su protección jurídica." Virtual Archaeology Review, vol. 4, no. 9, pp. 7-13. https://doi.org/10.4995/var.2013.4235 es_ES
dc.description.references Castellano-Román, M. 2015. "Generación de un modelo de información del patrimonio inmueble en el momento de su protección jurídica." EGA. Revista de expresión gráfica arquitectónica, vol. 20, no. 26, pp. 266-277. https://doi.org/10.4995/ega.2015.4060 es_ES
dc.description.references Castellano-Román, M., and Pinto-Puerto, F. 2019. "Dimensions and Levels of Knowledge in Heritage Building Information Modelling, HBIM: The model of the Charterhouse of Jerez (Cádiz, Spain)." Digital Applications in Archaeology and Cultural Heritage, 14, e00110. https://doi.org/10.1016/j.daach.2019.e00110 es_ES
dc.description.references Castillo, T., Alarcon, L. F., Pellicer, E. 2018. "Influence of Organizational Characteristics on Construction Project Performance Using Corporate Social Networks." Journal of Management in Engineering, vol. 4, no. 34, pp. 1-9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000612 es_ES
dc.description.references Constrution Industry Concil. 2018. Building Information Modelling (BIM) PROTOCOL. Standard Protocol for use in projects using Building Information Models, London. es_ES
dc.description.references Ferrer Casaña, J.V., 2010. Plan Director del Castillo de Enesa. (Retrieved 09.06.2022) https://docplayer.es/25387003-Plan-director-del-castillo-de-enesa-el-puig.html es_ES
dc.description.references Ferrer Casaña, J.V., 2020. Pliego de prescripciones técnicas para la contratación de la redacción del plan director para la conservación y el uso público del castillo de Xivert mediante metodología HBIM. Diputación de Castellón. Exp. Gestiona: 5963/2020. es_ES
dc.description.references García-Valldecabres, J. Galiano-Garrigos, A. Lopez Gonzalez, C., and Cortes Meseguer, L. 2022. es_ES
dc.description.references HBIM work methodology applied to preventive maintenance: A review of the state of the art. WIT Transactions on The Built Environment, ISSN: 1743-3509; Vol. 205, pp. 157-169; Ashurst, Southampton. https://doi.org/10.2495/BIM210131 es_ES
dc.description.references García-Valldecabres, J.L., López-González, Mª.C., Salvador-García, E., Jordán-Palomar, I., and MarchOliver, R. 2016. El diseño de una base de datos, modelo para la gestión de la información y del conocimiento del Patrimonio Arquitectónico. Inédito. es_ES
dc.description.references Guía nº 14 de la asociación BuldingSmart. 2018. Adaptación del patrimonio cultural a la metodología de gestión BIM. https://www.buildingsmart.es/actividades/grupos-de-trabajo/patrimonio-cultural/ es_ES
dc.description.references Historic England. 2017. BIM for Heritage. Developing a Historic Building Information Model. Swindon: Historic England. es_ES
dc.description.references HM Government. 2015. Digital Built Britain. level 3 Building Information Modelling-Strategic Plan. UK Government, febrero, 1-47. es_ES
dc.description.references Jordán-Palomar, I., 2019. Protocol to manage heritage-building interventions using heritage building information modelling (HBIM). Tesis doctoral. Editorial: Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/128416 es_ES
dc.description.references Jordán-Palomar, I., Tzortzopoulos, P., García-Valldecabres, J., and Pellicer E. 2018. "Protocol to Manage Heritage-Building Interventions Using Heritage Building Information Modelling (HBIM)." Sustainability, 10(908), 1-19. https://doi.org/10.3390/su10040908 es_ES
dc.description.references Jordán Palomar, I., García Valldecabres, J., Tzortzopoulos, P., Pellicer, E. 2020. "An online platform to unify and synchronise heritage architecture information." Automation in Construction (110), 103008. https://doi.org/10.1016/j.autcon.2019.103008 es_ES
dc.description.references Khan, S. and Tzortzopoulos, P. 2018. Using design science research and active enquiry to bridge the gap between theory and practice in lean construction research. Conference: 26th Annual Conference of the International Group for Lean Construction. July 2018. https://doi.org/10.24928/2018/0409 es_ES
dc.description.references La Sala, V., Ordeig, M., Casar, J.I., Dies, E., Romero, F., Taberner, F., Sancristobal, M., Serra A., and Gallud P. 2000. Plan Director del Templo de San Juan del Hospital de Valencia. Inédito. es_ES
dc.description.references Lin, Y.C., C.P. Lin, Hu H.T. y Su, Y.C., 2018. "Developing final as-built BIM model management system for owners during project closeout: A case study." Advanced Engineering Informatics, vol. 36, no. February, pp. 178-193. https://doi.org/10.1016/j.aei.2018.04.001 es_ES
dc.description.references Lo Turco, M., Mattone, M., and Rinaudo, F. 2017. "Metric survey and BIM technologies to record decay conditions." International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives, 42(5W1), pp. 261-268. https://doi.org/10.5194/isprs-archives-XLII-5-W1-261-2017 es_ES
dc.description.references Martín Talaverano, R., Murillo Fragero, J I., and Utrero Agudo, M.ªÁ. 2021. "Reflexiones y criterios relativos a la creación de modelos BIM de edificios históricos", Arqueología de la Arquitectura, 18: e113. https://doi.org/10.3989/arq.arqt.2021.005 es_ES
dc.description.references Naglaa A.M. 2015. Towards a theoretical framework for HBIM approach in historic preservation and management. Archnet-IJAR, vol. 9, no. 3, November 2015 - (130-147). https://doi.org/10.26687/archnet-ijar.v9i3.737 es_ES
dc.description.references OpenBIM (IFC) (Industry Foundation Classes) 2013. Retrieved 10.06.2022) https://www.buildingsmart.org/standards/bsi-standards/industry-foundation-classes/ es_ES
dc.description.references Oreni, D., Banfi, F., Brumana, R., and BarazzetI, L. 2014. Beyond crude 3D models: from point clouds to Historical Building Information Modeling via NURBS. Euro-Mediterranean Conference. Cham: Springer, pp. 166-175. https://doi.org/10.1007/978-3-319-13695-0_16 es_ES
dc.description.references Pärn, E.A., and Edwards, D.J. 2017. "Conceptualising the FinDD API plug-in: A study of BIM-FM integration." Automation in Construction, vol. 80, pp. 11-21. https://doi.org/10.1016/j.autcon.2017.03.015 es_ES
dc.description.references Pellicer, E., Yepes, V., Ortega, A.J., Carrión, A. 2017. "Market demands on construction management: A view from graduate students." Journal of Professional Issues in Engineering Education and Practice, vol. 4, no. 143, pp. 1-11. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000334 es_ES
dc.description.references Pinto Puerto, F., (coord.) 2021. Modelos digitales de información en la tutela sostenible del patrimonio cultural. Contribución al conocimiento e innovación social. Universidad de Sevilla. es_ES
dc.description.references Planes Nacionales (PN) de patrimonio, Plan Nacional de Catedrales. 1999. Retrieved 10.06.2022. https://www.culturaydeporte.gob.es/planes-nacionales/que-son.html es_ES
dc.description.references Porwal, A., and Hewage, K N. 2013. Building Information Modeling (BIM) partnering framework for public construction projects. Automation in Construction. Vol. 31, May 2013, pp. 204-214. https://doi.org/10.1016/j.autcon.2012.12.004 es_ES
dc.description.references Salvador-García, E., G-Valldecabres, J., Viñals Blasco, Mª. J. 2019. Integrating HBIM models in the management of the public use of heritage buildings. Canadian Journal of Civil Engineering, vol. 2, no. 47, pp. 228-235. https://doi.org/10.1139/cjce-2018-0338 es_ES
dc.description.references Salvador-García, E. 2020. Protocolo HBIM para una gestión eficiente del uso público del patrimonio arquitectónico. Universitat Politècnica de València, València. Tesis Doctoral. Disponible en: https://riunet.upv.es/handle/10251/146811. es_ES
dc.description.references Santoni, A., Martín-Talaverano, R., Quattrini, R., and Murillo-Fragero, J. 2020. "HBIM approach to implement the historical and constructive knowledge. The case of the Real Colegiata of San Isidoro (León, Spain)." Virtual Archaeology Review, 0. https://doi.org/10.4995/var.2021.13661 es_ES
dc.description.references Succar, B. 2008. "Building information modelling framework: A research and delivery foundation for industry stakeholders." Automation in Construction, vol. 18, pp. 357-375. https://doi.org/10.1016/j.autcon.2008.10.003 es_ES
dc.description.references Tzorzopoulos, P., and Formoso, C. 1999. Considerations on Application of Lean Construction Principles to Design Management. 1999/7/26 Publicaciones. Actas IGLC. Volumen 7. pp. 26-28. es_ES
dc.description.references UNESCO. 1972. Convención de 1972 para la Protección del Patrimonio Mundial Cultural y Natural. (Retrieved 2022.05.30). https://es.unesco.org/fieldoffice/santiago/cultura/patrimonio https://doi.org/10.33349/2022.107.5231 es_ES
dc.description.references UNESCO 2009. Carta sobre la preservación del patrimonio digital. Accesible at: https://unesdoc.unesco.org/ark:/48223/pf0000179529.page=2. es_ES
dc.description.references Uniclass 2015. (Unified Classification for the Construction Industry). Consulta 2022.06.10); https://biblus.accasoftware.com/es/clasificacion-uniclass-2015-de-objetos-ifc/ es_ES
dc.description.references Vegas López-Manzanares, F., Mileto, C., Cristini, V. 2010. "Planificar un plan: etapas y desarrollo del plan director del castillo de Monzón- Huesca." Arché. vol. 4-5, pp. 365-372. http://hdl.handle.net/10251/31168 es_ES
dc.description.references Volk, R., Stengel, J., and Schultmann, F. 2014. "Building Information Modeling (BIM) for existing buildings-Literature review and future needs." Automation in construction, vol. 38, 109-127. https://doi.org/10.1016/j.autcon.2013.10.023 es_ES


This item appears in the following Collection(s)

Show simple item record