dc.contributor.author |
Liu, Junshan
|
es_ES |
dc.contributor.author |
Galiano Garrigos, Antonio
|
es_ES |
dc.contributor.author |
García Valldecabres, Jorge Luis
|
es_ES |
dc.date.accessioned |
2023-01-12T08:54:15Z |
|
dc.date.available |
2023-01-12T08:54:15Z |
|
dc.date.issued |
2022-12-30 |
|
dc.identifier.issn |
1888-8143 |
|
dc.identifier.uri |
http://hdl.handle.net/10251/191267 |
|
dc.description.abstract |
[EN] The Master Plans (MP) used for Architectural Cultural Heritage conservation require specific standards for the documentation process. They must facilitate the achievement of the intended objectives about the knowledge acquisition and conservation of the building assets throughout the entire building lifecycle. Over time, the documentation of an MP, once the heritage building is under use, tends to become dispersed and the documentation generated during the building use is rarely introduced in the MP. Therefore, this contribution has the following objectives: 1) study of the requirements of MP deliverables; 2) study of the maturation requirements of the documentation processes and deliverables that are generated when applying the Building Information Modelling (BIM) methodology to an MP; 3) investigate if the application of the BIM strategies are suitable to respond to the needs of an MP in such a way that knowledge and conservation of heritage buildings are achieved; 4) verify that the exchange of information and the collaborative work among the different disciplines that generate documentation and deliverables guarantee a single, comprehensive, open, three-dimensional, and clear repository. |
es_ES |
dc.description.abstract |
[ES] Los Planes Directores (PD) sobre el Patrimonio Cultural arquitectónico requieren de unos estándares específicos de organización de la documentación que faciliten la obtención de los objetivos pretendidos sobre el conocimiento y la conservación de los bienes edilicios a lo largo de todo su ciclo de vida. A lo largo del tiempo, la documentación de un PD tiende a dispersarse e incluso es raramente integrada en el PD durante el uso del edificio. Por ello, se plantea la presente contribución con los siguientes objetivos: 1) Estudiar los requisitos de los entregables de los PD. 2) Estudiar los requisitos de maduración de los procesos y entregables documentales que se generan al aplicar la metodología Building Information Modelling (BIM) en un PD. 3) Verificar si la aplicación de las estrategias BIM son adecuadas para dar respuesta a las necesidades de un PD de tal forma que se logre el conocimiento y conservación de las edificaciones patrimoniales. 4) Verificar que el intercambio de información y el trabajo colaborativo entre las diferentes disciplinas que generan documentación y entregables garanticen un repositorio único, integral, abierto, tridimensional y claro. |
es_ES |
dc.description.sponsorship |
This contribution belongs to the work of the project financed by the Ministry of Science and Innovation of the Government of Spain, in a public call, for the development of the R+D+I project entitled Analysis and development of the integration of HBIM in GIS for the elaboration of a tourism planning protocol for the cultural heritage of a destination (PID2020-119088RB-I00) led by a team from the Polytechnic University of Valencia in collaboration with the universities of Alicante and Auburn, Alabama, USA. |
|
dc.language |
Inglés |
es_ES |
dc.publisher |
Universitat Politècnica de València |
es_ES |
dc.relation.ispartof |
EGE Revista de Expresión Gráfica en la Edificación |
es_ES |
dc.rights |
Reconocimiento (by) |
es_ES |
dc.subject |
Cultural Heritage |
es_ES |
dc.subject |
Facilities Management |
es_ES |
dc.subject |
Heritage Building Information Modelling (HBIM) |
es_ES |
dc.subject |
Master Plan |
es_ES |
dc.subject |
Patrimonio Cultural |
es_ES |
dc.subject |
Plan Director |
es_ES |
dc.subject |
Gestión |
es_ES |
dc.title |
The need to implement Cultural Heritage Master Plans through the Building Information Modelling methodology |
es_ES |
dc.title.alternative |
La necesidad de implementar a través de la metodología Building Information Modelling los Planes Directores del Patrimonio Cultural |
es_ES |
dc.type |
Artículo |
es_ES |
dc.identifier.doi |
10.4995/ege.2022.18597 |
|
dc.relation.projectID |
info:eu-repo/grantAgreement/AEI//PID2020-119088RB-I00/Analysis and development of the integration of HBIM in GIS for the elaboration of a tourism planning protocol for the cultural heritage of a destination/ |
|
dc.rights.accessRights |
Abierto |
es_ES |
dc.contributor.affiliation |
Universitat Politècnica de València. Departamento de Expresión Gráfica Arquitectónica - Departament d'Expressió Gràfica Arquitectònica |
es_ES |
dc.contributor.affiliation |
Universitat Politècnica de València. Escuela Técnica Superior de Gestión en la Edificación - Escola Tècnica Superior de Gestió en l'Edificació |
es_ES |
dc.contributor.affiliation |
Universitat Politècnica de València. Centro de Investigación Arquitectura, Patrimonio y Gestión para el Desarrollo Sostenible - Centre d'Investigació Arquitectura, Patrimoni i Gestió per al Desenvolupament Sostenible |
es_ES |
dc.description.bibliographicCitation |
Liu, J.; Galiano Garrigos, A.; García Valldecabres, JL. (2022). The need to implement Cultural Heritage Master Plans through the Building Information Modelling methodology. EGE Revista de Expresión Gráfica en la Edificación. (17):4-17. https://doi.org/10.4995/ege.2022.18597 |
es_ES |
dc.description.accrualMethod |
OJS |
es_ES |
dc.relation.publisherversion |
https://doi.org/10.4995/ege.2022.18597 |
es_ES |
dc.description.upvformatpinicio |
4 |
es_ES |
dc.description.upvformatpfin |
17 |
es_ES |
dc.type.version |
info:eu-repo/semantics/publishedVersion |
es_ES |
dc.description.issue |
17 |
es_ES |
dc.identifier.eissn |
2605-082X |
|
dc.relation.pasarela |
OJS\18597 |
es_ES |
dc.contributor.funder |
Ministerio de Ciencia e Innovación |
|
dc.contributor.funder |
Agencia Estatal de Investigación |
|
dc.description.references |
AEC (UK) BIM, 2012. Protocol Implementing UK BIM Standards for the Architectural, Engineering and Construction industry. Version 2.0 September 2012. |
es_ES |
dc.description.references |
Almagro Gorbea, A. 2019. "Half a century documenting the Architectural Heritage with photogrametry." EGE Revista de Expresión Gráfica en la Edificación, Nº 11, Valencia: Universitat Politècnica de València. pp. 4-30. https://doi.org/10.4995/ege.2019.12863 |
es_ES |
dc.description.references |
AlSehaimi, A., Koskela, L., and Tzortzopoulos, P. 2013. "Need for alternative research approaches in construction Management: Case of Delay Studies." Journal of Management in En-engineering, Vol. 29, No. 4, October 1, 2013. © ASCE, ISSN 0742-597X/2013/4-407-413. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000148 |
es_ES |
dc.description.references |
Angulo Fornos, Roque. 2012. "Construcción de la base gráfica para un sistema de información y gestión del patrimonio arquitectónico: Casa de Hylas." Arqueología de la Arquitectura, 9, enero-diciembre 2012, 11-25. Madrid / Vitoria. ISSN 1695-2731.eISSN 1989-5313. https://doi.org/10.3989/arqarqt.2012.10005 |
es_ES |
dc.description.references |
Bew, M., Underwood, J., Wix, J., Storer, G. 2008. Going BIM in a commercial world In eWork and eBusiness in Architecture, Engineering and Construction. Londres: Taylor &Francis. https://doi.org/10.1201/9780203883327 |
es_ES |
dc.description.references |
British Standards Institution. 2014. PAS1192-3 2014. Specification for information management for the operational phase of assets using building information modelling. [online]. Accessible at: https://bim-level2.org/standards/ |
es_ES |
dc.description.references |
Bruno, S., De Fino, M., Fatiguso, F. 2018. "Historic Building Information Modelling: performance assessment for diagnosis-aided information modelling and management." Automation in Construction, 86, 256-276. https://doi.org/10.1016/j.autcon.2017.11.009 |
es_ES |
dc.description.references |
Buildingsmart Spanish Chapter. 2018. Guía de usuarios BIM aplicado al Patrimonio Cultural [online]. Accessible at: https://www.buildingsmart.es/bim/guías-ubim/. |
es_ES |
dc.description.references |
Buildingsmart Spanish Chapter, 2019. Introducción a la serie EN-ISO 19650. |
es_ES |
dc.description.references |
Castellano-Román, M. 2013. "Hacia el modelado de información patrimonial. Generación de modelos de información del patrimonio inmeble en el momento de su protección jurídica." Virtual Archaeology Review, vol. 4, no. 9, pp. 7-13. https://doi.org/10.4995/var.2013.4235 |
es_ES |
dc.description.references |
Castellano-Román, M. 2015. "Generación de un modelo de información del patrimonio inmueble en el momento de su protección jurídica." EGA. Revista de expresión gráfica arquitectónica, vol. 20, no. 26, pp. 266-277. https://doi.org/10.4995/ega.2015.4060 |
es_ES |
dc.description.references |
Castellano-Román, M., and Pinto-Puerto, F. 2019. "Dimensions and Levels of Knowledge in Heritage Building Information Modelling, HBIM: The model of the Charterhouse of Jerez (Cádiz, Spain)." Digital Applications in Archaeology and Cultural Heritage, 14, e00110. https://doi.org/10.1016/j.daach.2019.e00110 |
es_ES |
dc.description.references |
Castillo, T., Alarcon, L. F., Pellicer, E. 2018. "Influence of Organizational Characteristics on Construction Project Performance Using Corporate Social Networks." Journal of Management in Engineering, vol. 4, no. 34, pp. 1-9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000612 |
es_ES |
dc.description.references |
Constrution Industry Concil. 2018. Building Information Modelling (BIM) PROTOCOL. Standard Protocol for use in projects using Building Information Models, London. |
es_ES |
dc.description.references |
Ferrer Casaña, J.V., 2010. Plan Director del Castillo de Enesa. (Retrieved 09.06.2022) https://docplayer.es/25387003-Plan-director-del-castillo-de-enesa-el-puig.html |
es_ES |
dc.description.references |
Ferrer Casaña, J.V., 2020. Pliego de prescripciones técnicas para la contratación de la redacción del plan director para la conservación y el uso público del castillo de Xivert mediante metodología HBIM. Diputación de Castellón. Exp. Gestiona: 5963/2020. |
es_ES |
dc.description.references |
García-Valldecabres, J. Galiano-Garrigos, A. Lopez Gonzalez, C., and Cortes Meseguer, L. 2022. |
es_ES |
dc.description.references |
HBIM work methodology applied to preventive maintenance: A review of the state of the art. WIT Transactions on The Built Environment, ISSN: 1743-3509; Vol. 205, pp. 157-169; Ashurst, Southampton. https://doi.org/10.2495/BIM210131 |
es_ES |
dc.description.references |
García-Valldecabres, J.L., López-González, Mª.C., Salvador-García, E., Jordán-Palomar, I., and MarchOliver, R. 2016. El diseño de una base de datos, modelo para la gestión de la información y del conocimiento del Patrimonio Arquitectónico. Inédito. |
es_ES |
dc.description.references |
Guía nº 14 de la asociación BuldingSmart. 2018. Adaptación del patrimonio cultural a la metodología de gestión BIM. https://www.buildingsmart.es/actividades/grupos-de-trabajo/patrimonio-cultural/ |
es_ES |
dc.description.references |
Historic England. 2017. BIM for Heritage. Developing a Historic Building Information Model. Swindon: Historic England. |
es_ES |
dc.description.references |
HM Government. 2015. Digital Built Britain. level 3 Building Information Modelling-Strategic Plan. UK Government, febrero, 1-47. |
es_ES |
dc.description.references |
Jordán-Palomar, I., 2019. Protocol to manage heritage-building interventions using heritage building information modelling (HBIM). Tesis doctoral. Editorial: Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/128416 |
es_ES |
dc.description.references |
Jordán-Palomar, I., Tzortzopoulos, P., García-Valldecabres, J., and Pellicer E. 2018. "Protocol to Manage Heritage-Building Interventions Using Heritage Building Information Modelling (HBIM)." Sustainability, 10(908), 1-19. https://doi.org/10.3390/su10040908 |
es_ES |
dc.description.references |
Jordán Palomar, I., García Valldecabres, J., Tzortzopoulos, P., Pellicer, E. 2020. "An online platform to unify and synchronise heritage architecture information." Automation in Construction (110), 103008. https://doi.org/10.1016/j.autcon.2019.103008 |
es_ES |
dc.description.references |
Khan, S. and Tzortzopoulos, P. 2018. Using design science research and active enquiry to bridge the gap between theory and practice in lean construction research. Conference: 26th Annual Conference of the International Group for Lean Construction. July 2018. https://doi.org/10.24928/2018/0409 |
es_ES |
dc.description.references |
La Sala, V., Ordeig, M., Casar, J.I., Dies, E., Romero, F., Taberner, F., Sancristobal, M., Serra A., and Gallud P. 2000. Plan Director del Templo de San Juan del Hospital de Valencia. Inédito. |
es_ES |
dc.description.references |
Lin, Y.C., C.P. Lin, Hu H.T. y Su, Y.C., 2018. "Developing final as-built BIM model management system for owners during project closeout: A case study." Advanced Engineering Informatics, vol. 36, no. February, pp. 178-193. https://doi.org/10.1016/j.aei.2018.04.001 |
es_ES |
dc.description.references |
Lo Turco, M., Mattone, M., and Rinaudo, F. 2017. "Metric survey and BIM technologies to record decay conditions." International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives, 42(5W1), pp. 261-268. https://doi.org/10.5194/isprs-archives-XLII-5-W1-261-2017 |
es_ES |
dc.description.references |
Martín Talaverano, R., Murillo Fragero, J I., and Utrero Agudo, M.ªÁ. 2021. "Reflexiones y criterios relativos a la creación de modelos BIM de edificios históricos", Arqueología de la Arquitectura, 18: e113. https://doi.org/10.3989/arq.arqt.2021.005 |
es_ES |
dc.description.references |
Naglaa A.M. 2015. Towards a theoretical framework for HBIM approach in historic preservation and management. Archnet-IJAR, vol. 9, no. 3, November 2015 - (130-147). https://doi.org/10.26687/archnet-ijar.v9i3.737 |
es_ES |
dc.description.references |
OpenBIM (IFC) (Industry Foundation Classes) 2013. Retrieved 10.06.2022) https://www.buildingsmart.org/standards/bsi-standards/industry-foundation-classes/ |
es_ES |
dc.description.references |
Oreni, D., Banfi, F., Brumana, R., and BarazzetI, L. 2014. Beyond crude 3D models: from point clouds to Historical Building Information Modeling via NURBS. Euro-Mediterranean Conference. Cham: Springer, pp. 166-175. https://doi.org/10.1007/978-3-319-13695-0_16 |
es_ES |
dc.description.references |
Pärn, E.A., and Edwards, D.J. 2017. "Conceptualising the FinDD API plug-in: A study of BIM-FM integration." Automation in Construction, vol. 80, pp. 11-21. https://doi.org/10.1016/j.autcon.2017.03.015 |
es_ES |
dc.description.references |
Pellicer, E., Yepes, V., Ortega, A.J., Carrión, A. 2017. "Market demands on construction management: A view from graduate students." Journal of Professional Issues in Engineering Education and Practice, vol. 4, no. 143, pp. 1-11. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000334 |
es_ES |
dc.description.references |
Pinto Puerto, F., (coord.) 2021. Modelos digitales de información en la tutela sostenible del patrimonio cultural. Contribución al conocimiento e innovación social. Universidad de Sevilla. |
es_ES |
dc.description.references |
Planes Nacionales (PN) de patrimonio, Plan Nacional de Catedrales. 1999. Retrieved 10.06.2022. https://www.culturaydeporte.gob.es/planes-nacionales/que-son.html |
es_ES |
dc.description.references |
Porwal, A., and Hewage, K N. 2013. Building Information Modeling (BIM) partnering framework for public construction projects. Automation in Construction. Vol. 31, May 2013, pp. 204-214. https://doi.org/10.1016/j.autcon.2012.12.004 |
es_ES |
dc.description.references |
Salvador-García, E., G-Valldecabres, J., Viñals Blasco, Mª. J. 2019. Integrating HBIM models in the management of the public use of heritage buildings. Canadian Journal of Civil Engineering, vol. 2, no. 47, pp. 228-235. https://doi.org/10.1139/cjce-2018-0338 |
es_ES |
dc.description.references |
Salvador-García, E. 2020. Protocolo HBIM para una gestión eficiente del uso público del patrimonio arquitectónico. Universitat Politècnica de València, València. Tesis Doctoral. Disponible en: https://riunet.upv.es/handle/10251/146811. |
es_ES |
dc.description.references |
Santoni, A., Martín-Talaverano, R., Quattrini, R., and Murillo-Fragero, J. 2020. "HBIM approach to implement the historical and constructive knowledge. The case of the Real Colegiata of San Isidoro (León, Spain)." Virtual Archaeology Review, 0. https://doi.org/10.4995/var.2021.13661 |
es_ES |
dc.description.references |
Succar, B. 2008. "Building information modelling framework: A research and delivery foundation for industry stakeholders." Automation in Construction, vol. 18, pp. 357-375. https://doi.org/10.1016/j.autcon.2008.10.003 |
es_ES |
dc.description.references |
Tzorzopoulos, P., and Formoso, C. 1999. Considerations on Application of Lean Construction Principles to Design Management. 1999/7/26 Publicaciones. Actas IGLC. Volumen 7. pp. 26-28. |
es_ES |
dc.description.references |
UNESCO. 1972. Convención de 1972 para la Protección del Patrimonio Mundial Cultural y Natural. (Retrieved 2022.05.30). https://es.unesco.org/fieldoffice/santiago/cultura/patrimonio https://doi.org/10.33349/2022.107.5231 |
es_ES |
dc.description.references |
UNESCO 2009. Carta sobre la preservación del patrimonio digital. Accesible at: https://unesdoc.unesco.org/ark:/48223/pf0000179529.page=2. |
es_ES |
dc.description.references |
Uniclass 2015. (Unified Classification for the Construction Industry). Consulta 2022.06.10); https://biblus.accasoftware.com/es/clasificacion-uniclass-2015-de-objetos-ifc/ |
es_ES |
dc.description.references |
Vegas López-Manzanares, F., Mileto, C., Cristini, V. 2010. "Planificar un plan: etapas y desarrollo del plan director del castillo de Monzón- Huesca." Arché. vol. 4-5, pp. 365-372. http://hdl.handle.net/10251/31168 |
es_ES |
dc.description.references |
Volk, R., Stengel, J., and Schultmann, F. 2014. "Building Information Modeling (BIM) for existing buildings-Literature review and future needs." Automation in construction, vol. 38, 109-127. https://doi.org/10.1016/j.autcon.2013.10.023 |
es_ES |