Mostrar el registro sencillo del ítem
dc.contributor.author | Haseeb, Abdul | es_ES |
dc.contributor.author | Khan, Muhammad Ali | es_ES |
dc.contributor.author | Shaikh, Shakeel Ahmed | es_ES |
dc.contributor.author | Iftikhar, Zohaib | es_ES |
dc.contributor.author | Kumar, Ramesh | es_ES |
dc.contributor.author | Bux, Karim | es_ES |
dc.contributor.author | Naz, Arshia | es_ES |
dc.contributor.author | Hassam | es_ES |
dc.date.accessioned | 2023-02-14T07:42:31Z | |
dc.date.available | 2023-02-14T07:42:31Z | |
dc.date.issued | 2023-01-31 | |
dc.identifier.uri | http://hdl.handle.net/10251/191806 | |
dc.description.abstract | [EN] This research was conducted to enhance the productivity of the targeted sewing line at the ABC textile company. The existing SAMs, the capacity of the sewing line for various operations, and several required machines were collected. Moreover, the obtained figures were observed and analyzed by using time study and motion study, and certain improvements were made at the sewing line. Results indicated that SAMs for operations A and B were minimized by -13.64% and -14.54% respectively; whereas, SAM for operation C was increased by 16.67%. Machine requirement for operation C was increased by 100%; moreover, the capacity for operations A, B, and C was increased by 12%, 12.69%, and 40% respectively. When it is to production activities, the little improvements play a significant role in boosting the productivity of the production system. Optimal allocation of human resources, machines, and time are the benefits of line balancing. This can be made possible with the application of the line-balancing framework. With every passing day, the nature and type of article vary at the sewing line thus it is highly needed for the company to get the model developed for an automated line balancing application. Moreover, this work can be extended by the development of a line-balancing framework considering the nature of production. | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.relation.ispartof | Journal of Applied Research in Technology & Engineering | es_ES |
dc.rights | Reconocimiento - No comercial - Compartir igual (by-nc-sa) | es_ES |
dc.subject | Assembly line balancing | es_ES |
dc.subject | Performance | es_ES |
dc.subject | Lean manufacturing | es_ES |
dc.subject | Work measurement | es_ES |
dc.subject | Textile | es_ES |
dc.title | Performance optimization of pillow sheet set sewing assembly line by SAM analysis and lean manufacturing techniques of method study & work measurement | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.4995/jarte.2023.17861 | |
dc.rights.accessRights | Abierto | es_ES |
dc.description.bibliographicCitation | Haseeb, A.; Khan, MA.; Shaikh, SA.; Iftikhar, Z.; Kumar, R.; Bux, K.; Naz, A.... (2023). Performance optimization of pillow sheet set sewing assembly line by SAM analysis and lean manufacturing techniques of method study & work measurement. Journal of Applied Research in Technology & Engineering. 4(1):1-12. https://doi.org/10.4995/jarte.2023.17861 | es_ES |
dc.description.accrualMethod | OJS | es_ES |
dc.relation.publisherversion | https://doi.org/10.4995/jarte.2023.17861 | es_ES |
dc.description.upvformatpinicio | 1 | es_ES |
dc.description.upvformatpfin | 12 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 4 | es_ES |
dc.description.issue | 1 | es_ES |
dc.identifier.eissn | 2695-8821 | |
dc.relation.pasarela | OJS\17861 | es_ES |
dc.description.references | Alzoubi, K., Hijazi, H., & Alkhateeb, A. (2019). Facility planning and assembly line balancing in garment industry. 2019 6th International Conference on Frontiers of Industrial Engineering, 11-15. https://doi.org/10.1109/ICFIE.2019.8907686 | es_ES |
dc.description.references | Andreu-Casas, E., García-Villoria, A., & Pastor, R. (2022). Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints. European Journal of Operational Research, 302(1), 96-116. https://doi.org/10.1016/j.ejor.2021.12.002 | es_ES |
dc.description.references | Arain, M.S., Khan, M.A., & Kalwar, M.A. (2020). Optimization of Target Calculation Method for Leather Skiving and Stamping: Case of Leather Footwear Industry. International Journal of Business Education and Management Studies (IJBEMS), 7(1), 15-30. https://www.ijbems.com/doc/IJBEMS-137.pdf | es_ES |
dc.description.references | Aung, K.N. Y., & Tun, Y.Y. (2019). Assembly Line Balancing to Improve Productivity using Work Sharing Method in Garment Factories. International Journal of Trend in Scientific Research and Development, 3(5), 1582-1587. | es_ES |
dc.description.references | Bongomin, O., Mwasiagi, J.I., Nganyi, E.O., & Nibikora, I. (2020a). Engineering Reports - 2020 - Bongomin - A complex garment assembly line balancing using simulation-based optimization.pdf. Engineering Reports, e12258. https://doi.org/10.1002/eng2.12258 | es_ES |
dc.description.references | Bongomin, O., Mwasiagi, J.I., Nganyi, E.O., & Nibikora, I. (2020b). Improvement of garment assembly line efficiency using line balancing technique. Engineering Reports, 2(4), 1-18. https://doi.org/10.1002/eng2.12157 | es_ES |
dc.description.references | Budiman, I., Sembiring, A.C., Tampubolon, J., Wahyuni, D., & Dharmala, A. (2019). Improving effectiveness and efficiency of assembly line with a stopwatch time study and balancing activity elements. Journal of Physics: Conference Series, 1230(1). https://doi.org/10.1088/1742-6596/1230/1/012041 | es_ES |
dc.description.references | Bukhsh, M., Khan, M.A., Zaidi, I.H., Yaseen, R., Khalid, A., Razzaque, A., & Ali, M. (2021). Productivity Improvement in Textile Industry using Lean Manufacturing Practice of Single Minute Die Exchange ( SMED ). Proceedings of the 11th Annual International Conference on Industrial Engineering and Operations Management Singapore, March 7-11, 2021. http://www.ieomsociety.org/singapore2021/papers/1282.pdf | es_ES |
dc.description.references | Chaudhry, A.K., Kalwar, M.A., Khan, M.A., & Shaikh, S.A. (2021). Improving the Efficiency of Small Management Information System by Using VBA. International Journal of Science and Engineering Investigations, 10(111), 7-13. http://www.ijsei. com/papers/ijsei-1011121-02.pdf | es_ES |
dc.description.references | Chutima, P. (2020). Research trends and outlooks in assembly line balancing problems. Engineering Journal, 24(5), 93-134. https://doi.org/10.4186/ej.2020.24.5.93 | es_ES |
dc.description.references | Çil, Z.A., Li, Z., Mete, S., & Özceylan, E. (2020). Mathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human-robot collaboration. Applied Soft Computing Journal, 93(106394). https://doi.org/10.1016/j.asoc.2020.106394 | es_ES |
dc.description.references | Fani, V., Bindi, B., & Bandinelli, R. (2020). Balancing assembly line in the footwear industry using simulation: A case study. Proceedings - European Council for Modelling and Simulation, ECMS, 34(1). https://doi.org/10.7148/2020-0056 | es_ES |
dc.description.references | Germanes, J.S., Puga, M.F., Sabio, R.B., Sanchez, E.M., & Hugo, J.C. (2017). Improving Efficiency of Shoe Manufacturer through the Use of Time and Motion Study and Line Balancing. Journal of Industrial and Intelligent Information, 5(1), 16-22. https://doi.org/10.18178/jiii.5.1.16-22 | es_ES |
dc.description.references | Haque, T.M., Hossain, R.M., & Hasan, S.M. (2018). Bottleneck problem reduction of a garment manufacturing industry in Bangladesh by using line balancing technique. International Journal of Research in Advanced Engineering and Technology, 4(2), 28-32. https://doi.org/10.13140/RG.2.2.32627.84004 | es_ES |
dc.description.references | Iftikhar, Z., Khan, M.A., Kumar, R., Bux, K., & Haseeb, A. (2021). Productivity Improvement of Garments Industry by Assembly Line Technique of Lean Manufacturing. Proceedings (Abstract) of the International Conference on Industrial & Mechanical Engineering and Operations Management Dhaka, Bangladesh, December 26-27, 2021., 908. https://ieomsociety.org/proceedings/2021dhaka/497.pdf | es_ES |
dc.description.references | Iftikhar, Z., Khan, M.A., Soomro, A.S., Kumar, R., Bux, K., Haseeb, A., & Naz, A. (2022). Productivity Improvement of Assembly Line in Textile Stitching Unit by Lean Techniques of Line Balancing and Time and Motion Study. International Journal of Science and Engineering Investigations (IJSEI), 11(127), 51-60. http://www.ijsei.com/papers/ijsei-1112722-07.pdf | es_ES |
dc.description.references | Iftikhar, Z., Kumar, R., Bux, K., Haseeb, A., Khan, M.A., Naz, A., Hassam, & Soomro, A.S. (2022). Lean Manufacturing Tools and Techniques for the Productivity Improvement in Assembly Lines Operations of Industries. International | es_ES |
dc.description.references | Research Journal of Modernization in Engineering Technology and Science, 4(7), 4554-4562. https://www.irjmets. com/uploadedfiles/paper//issue_7_july_2022/28986/final/fin_irjmets1663258443.pdf | es_ES |
dc.description.references | Kalwar, M.A., Khan, M.A., Phul, Z., Wadho, M.H., Shahzad, M.F., & Marri, H.B. (2022). The analysis of performance before and after ERP implementation: a case of a manufacturing company. Journal of Applied Research in Technology & Engineering, 3(2), 115-121. https://doi.org/10.4995/jarte.2022.17789 | es_ES |
dc.description.references | Kalwar, M.A., Shaikh, S.A., Khan, M.A., & Malik, T.S. (2020). Optimization of Vendor Rate Analysis Report Preparation Method by Using Visual Basic for Applications in Excel (Case Study of Footwear Company of Lahore). Proceedings of the International Conference on Industrial Engineering and Operations Management (IEOM, Dhaka, Bangladesh, December 26-27. https://ieomsociety.org/proceedings/2021dhaka/228.pdf | es_ES |
dc.description.references | Kathem, A.S., A.H.Al-Kindi, L., & Al-Baldawi, Z. (2021). Integration of Lean Concepts and Line balancing Focusing on Value Adding Activities. Design Engineering, 6, 6263-6275. | es_ES |
dc.description.references | Khan, M.A. (2018). Preliminary Study on Lean Manufacturing Practices at Yarn Manufacturing Industry - A Case Study [Masters of Engineering (Thesis), Department of Industrial Engineering & Management, Mehran University of Engineering & Technology, Jamshoro, Sindh, Pakistan.]. https://doi.org/10.13140/RG.2.2.31557.37609 | es_ES |
dc.description.references | Khan, M.A., Khatri, A., & Marri, H.B. (2020). Descriptive analysis of lean manufacturing practices in textile industry. Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020, 3870-3871. http://www.ieomsociety.org/detroit2020/papers/753.pdf | es_ES |
dc.description.references | Khan, M.A., Marri, H.B., & Khatri, A. (2020a). Exploring The Applications Of Lean Manufacturing Practices In Textile Industry. Proceedings of the International Conference on Industrial Engineering and Operations Management, Dubai, UAE, March 10-12, 2020, 2360-2361. http://www.ieomsociety.org/ieom2020/papers/545.pdf | es_ES |
dc.description.references | Khan, M.A., Marri, H.B., & Khatri, A. (2020b). Preliminary Study on the Identification, Analysis and Elimination of Lean Manufacturing Wastes through Lean Manufacturing Practices at Yarn Manufacturing Industry. Proceedings of the International Conference on Industrial Engineering and Operations Management, Dubai, UAE, March 10-12, 2020, 2347-2349. http://www.ieomsociety.org/ieom2020/papers/189.pdf | es_ES |
dc.description.references | Khan, M.A., Memon, M.S., & Soomro, A.S. (2020). Exploring the applications of lean manufacturing practices in automobile industry. Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020, August. http://www.ieomsociety.org/detroit2020/papers/727.pdf | es_ES |
dc.description.references | Khan, M.A., Shaikh, S.A., Lakho, T.H., & Mughal, U.K. (2020). Potential of Lean Tool of Value Stream Mapping (VSM) in Manufacturing Industries. Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020, 3064-3074. http://www.ieomsociety.org/harare2020/papers/698.pdf | es_ES |
dc.description.references | Khan, M.A., Shaikh, S.A., & Marri, S. (2020). Systematic review of lean manufacturing practices in pharmaceutical industry. Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020, August, 3674-3675. http://www.ieomsociety.org/detroit2020/papers/726.pdf | es_ES |
dc.description.references | Khan, M.A., Soomro, A.S., Shaikh, S.A., Memon, M.S., & Marri, S. (2020). Lean manufacturing in pakistan: A comprehensive review. Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020, August. http://www.ieomsociety.org/detroit2020/papers/728.pdf | es_ES |
dc.description.references | Khan, M.A., Kalwar, M.A., Malik, A.J., Malik, T.S., & Chaudhry, A.K. (2021). Automation of Supplier Price Evaluation Report in MS Excel by Using Visual Basic for Applications: A Case of Footwear Industry. International Journal of Science and Engineering Investigations (IJSEI), 10(113), 49-60. http://www.ijsei.com/papers/ijsei-1011321-08.pdf | es_ES |
dc.description.references | Khan, M.A., Khatri, A., & Marri, H.B. (2021a). Applications of Waste Relations Matrix (WRM) in Lean Wastes Identification. Proceedings of the 11th Annual International Conference on Industrial Engineering and Operations Management Singapore, March 7-11, 2021. http://www.ieomsociety.org/singapore2021/papers/1269.pdf | es_ES |
dc.description.references | Khan, M.A., Khatri, A., & Marri, H.B. (2021b). Identification of Defects in Various Processes of Spinning: A Case Study of Kotri, Sindh, Pakistan. Proceedings of the First Central American and Caribbean International Conference on Industrial Engineering and Operations Management, Port-Au-Prince, Haiti, June 15-16, 2021. http://ieomsociety.org/proceedings/2021haiti/299.pdf | es_ES |
dc.description.references | Kumar, P., Khan, M.A., Mughal, U.K., & Kumar, S. (2020). Exploring the Potential of Six Sigma ( DMAIC ) in Minimizing the Production Defects. Proceedings of the 3rd International Conference on Industrial & Mechanical Engineering and Operations Management Dhaka, Bangladesh, December 26-27, 2020. http://www.ieomsociety.org/imeom/260.pdf | es_ES |
dc.description.references | Kumar, R., Iftikhar, Z., Bux, K., Haseeb, A., Khan, M.A., Naz, A., Hassam;, & Shaikh, S.A. (2022). Optimization of Fitted Sheet Set Assembly Line at Garments Industry by Lean Manufacturing Techniques and SAM Analysis. International Research Journal of Modernization in Engineering Technology and Science (IRJMETS), 4(10), 1634-1647. https://www.irjmets.com/uploadedfiles/paper//issue_10_october_2022/30821/final/fin_irjmets1667794675.pdf | es_ES |
dc.description.references | Kumar, S., Khan, M.A., Ahmed, S., Rehman, A., & Luhar, E. (2020). A Case Study for Performance Evaluation of Motorcycle Assembly Line through the Lean Manufacturing Practice of Overall Equipment Effectiveness ( OEE ). Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020, 1622-1623. http://www.ieomsociety.org/ieom2020/papers/192.pdf | es_ES |
dc.description.references | Lakho, T.H., Khan, M.A., Virk, S.I., & Indher, A.A. (2020). Implementation of Overall Equipment Effectiveness ( OEE ) in Maintenance Management. Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020, 3087-3098. http://www.ieomsociety.org/harare2020/papers/700.pdf | es_ES |
dc.description.references | Lakho, T.H., Khan, M.A., Virk, S.I., & Indher, A.A. (2021). Evalaution of Overall Equipment Effectivness in a Heavy Engineering Industry: A Case Study. Proceedings in the First Central American and Caribbean International Conference on Industrial Engineering and Operations Management, Port-Au-Prince, Haiti, June 15-16, 2021. http://ieomsociety.org/proceedings/2021haiti/297.pdf | es_ES |
dc.description.references | Li, Z., Kucukkoc, I., & Tang, Q. (2021). Enhanced branch-bound-remember and iterative beam search algorithms for type II assembly line balancing problem. Computers & Operations Research, 131, 105235. https://doi.org/10.1016/j.cor.2021.105235 | es_ES |
dc.description.references | Manaye, M. (2019). Line Balancing Techniques for Productivity Improvement Improvement. International Journal of Mechanical and Industrial Technology, 7(1), 89-104. | es_ES |
dc.description.references | Mekala, N., Sanju, S.D., Thamaraiselvan, V., & Kavya, M. (2021). Implementation of Industrial Engineering concepts in Apparel Industry to improving Productivity and it's cost reduction. IOP Conference Series: Materials Science and Engineering, 1059(1). https://doi.org/10.1088/1757-899X/1059/1/012027 | es_ES |
dc.description.references | Mughal, U.K., Khan, M.A., Kumar, P., & Kumar, S. (2020). Applications of Lean Six Sigma ( LSS ) in Production Systems. Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020, 3075-3086. http://www.ieomsociety.org/harare2020/papers/699.pdf | es_ES |
dc.description.references | Mughal, U.K., Khan, M.A., Kumar, P., & Kumar, S. (2021). Identification and Analysis of Stitching Defects at the Stitching Unit: A Case Study. Proceedings of the First Central American and Caribbean International Conference on Industrial Engineering and Operations Management, Port-Au-Prince, Haiti, June 15-16, 2021. http://ieomsociety.org/proceedings/2021haiti/298.pdf | es_ES |
dc.description.references | Mulani, S.J., Awasare, A.D., Shetenawar, R.M., & Panchal, R.N. (2019). Line Balancing by Using Time Study. International Journal of Scientific Research and Engineering Development, 2(4), 302-304. https://doi.org/10.17148/IARJSET | es_ES |
dc.description.references | Rada-Vilela, J., Chica, M., Cordón, Ó., & Damas, S. (2013). A comparative study of multi-objective ant colony optimization algorithms for the time and space assembly line balancing problem. Applied Soft Computing, 13(11), 4370-4382. https://doi.org/10.1016/j.asoc.2013.06.014 | es_ES |
dc.description.references | Rajput, S., Khan, M.A., Samejo, S., Murtaza, G., & Ali, R.A. (2020). Productivity Improvement by the Implementation of lean manufacturing practice ( takt time ) in an automobile assembling plant. Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020, 1618-1619. http://www.ieomsociety.org/ieom2020/papers/190.pdf | es_ES |
dc.description.references | Sahito, S.A., Khan, M.A., Arain, A.A., Bhutto, S.A., Wadhyo, R., & Memon, S.A. (2020). A Study For The Identification And Elimination Of Lean Manufacturing Wastes At The Pharmaceutical Production Plant Improvement By The Implementation Of Lean Manufacturing Practice ( Takt Time ). Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020, 1620-1621. http://www.ieomsociety.org/ieom2020/papers/191.pdf | es_ES |
dc.description.references | Schlüter, M.J., & Ostermeier, F.F. (2022). Dynamic line balancing in unpaced mixed-model assembly lines: A problem classification. CIRP Journal of Manufacturing Science and Technology, 37, 134-142. https://doi.org/10.1016/j.cirpj.2022.01.012 | es_ES |
dc.description.references | Shakib, M.N., Rahman, M.M., Parvez, M.S., & Haque, A.S. M. (2014). Study of Lean facility Layout in Garment Manufacturing Process: Focusing Sewing Section of Men's Shirt. International Conference on Mechanical, Industrial and Energy Engineering. | es_ES |
dc.description.references | Shar, W.A., Shaikh, S.A., & Khan, M.A. (2021). Analysis of Production System of Pharmaceutical Company by Using Lean Technique of Overall Equipment Effectiveness (OEE). Journal of Contemporary Issues in Business and Government (CIBG), 27(5), 2407-2417. https://cibgp.com/pdf_15891_5952933fe85877ac4ca9e9d3db87c667.html | es_ES |
dc.description.references | Sikora, C.G. S., Lopes, T.C., & Magatão, L. (2017). Traveling worker assembly line (re)balancing problem: Model, reduction techniques, and real case studies. European Journal of Operational Research, 259, 949-971. https://doi.org/10.1016/j.ejor.2016.11.027 | es_ES |
dc.description.references | Xie, Z., Du, J., Chen, Q., & Wang, X. (2021). Enhancing the labor division in the balancing of apparel assembly lines with parallel workstation through an improved ant colony algorithm. Journal of Engineered Fibers and Fabrics, 16, 1-14. https://doi.org/10.1177/15589250211055784 | es_ES |
dc.description.references | Yemane, A. (2021). Productivity Improvement of BOB T-Shirt through Line Balancing Using Control Limit Analysis and Discrete Event Simulation, Case Study: MAA Garment and Textile Factory. Journal of Optimization in Industrial Engineering, 14(2), 19-32. https://doi.org/10.22094/JOIE.2020.561766.1545 | es_ES |
dc.description.references | Zaidi, I.H., Khan, M.A., Bukhsh, M., Yaseen, R., & Shaikh, S.A. (2021). Implementation of Lean Manufacturing Practices in Diverse Manufacturing Industries. Proceedings of the 11th Annual International Conference on Industrial Engineering and Operations Management Singapore, March 7-11, 2021. http://www.ieomsociety.org/singapore2021/ papers/1268.pdf | es_ES |