- -

Performance optimization of pillow sheet set sewing assembly line by SAM analysis and lean manufacturing techniques of method study & work measurement

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Performance optimization of pillow sheet set sewing assembly line by SAM analysis and lean manufacturing techniques of method study & work measurement

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Haseeb, Abdul es_ES
dc.contributor.author Khan, Muhammad Ali es_ES
dc.contributor.author Shaikh, Shakeel Ahmed es_ES
dc.contributor.author Iftikhar, Zohaib es_ES
dc.contributor.author Kumar, Ramesh es_ES
dc.contributor.author Bux, Karim es_ES
dc.contributor.author Naz, Arshia es_ES
dc.contributor.author Hassam es_ES
dc.date.accessioned 2023-02-14T07:42:31Z
dc.date.available 2023-02-14T07:42:31Z
dc.date.issued 2023-01-31
dc.identifier.uri http://hdl.handle.net/10251/191806
dc.description.abstract [EN] This research was conducted to enhance the productivity of the targeted sewing line at the ABC textile company. The existing SAMs, the capacity of the sewing line for various operations, and several required machines were collected. Moreover, the obtained figures were observed and analyzed by using time study and motion study, and certain improvements were made at the sewing line. Results indicated that SAMs for operations A and B were minimized by -13.64% and -14.54% respectively; whereas, SAM for operation C was increased by 16.67%. Machine requirement for operation C was increased by 100%; moreover, the capacity for operations A, B, and C was increased by 12%, 12.69%, and 40% respectively. When it is to production activities, the little improvements play a significant role in boosting the productivity of the production system. Optimal allocation of human resources, machines, and time are the benefits of line balancing. This can be made possible with the application of the line-balancing framework. With every passing day, the nature and type of article vary at the sewing line thus it is highly needed for the company to get the model developed for an automated line balancing application. Moreover, this work can be extended by the development of a line-balancing framework considering the nature of production. es_ES
dc.language Inglés es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.relation.ispartof Journal of Applied Research in Technology & Engineering es_ES
dc.rights Reconocimiento - No comercial - Compartir igual (by-nc-sa) es_ES
dc.subject Assembly line balancing es_ES
dc.subject Performance es_ES
dc.subject Lean manufacturing es_ES
dc.subject Work measurement es_ES
dc.subject Textile es_ES
dc.title Performance optimization of pillow sheet set sewing assembly line by SAM analysis and lean manufacturing techniques of method study & work measurement es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.4995/jarte.2023.17861
dc.rights.accessRights Abierto es_ES
dc.description.bibliographicCitation Haseeb, A.; Khan, MA.; Shaikh, SA.; Iftikhar, Z.; Kumar, R.; Bux, K.; Naz, A.... (2023). Performance optimization of pillow sheet set sewing assembly line by SAM analysis and lean manufacturing techniques of method study & work measurement. Journal of Applied Research in Technology & Engineering. 4(1):1-12. https://doi.org/10.4995/jarte.2023.17861 es_ES
dc.description.accrualMethod OJS es_ES
dc.relation.publisherversion https://doi.org/10.4995/jarte.2023.17861 es_ES
dc.description.upvformatpinicio 1 es_ES
dc.description.upvformatpfin 12 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 4 es_ES
dc.description.issue 1 es_ES
dc.identifier.eissn 2695-8821
dc.relation.pasarela OJS\17861 es_ES
dc.description.references Alzoubi, K., Hijazi, H., & Alkhateeb, A. (2019). Facility planning and assembly line balancing in garment industry. 2019 6th International Conference on Frontiers of Industrial Engineering, 11-15. https://doi.org/10.1109/ICFIE.2019.8907686 es_ES
dc.description.references Andreu-Casas, E., García-Villoria, A., & Pastor, R. (2022). Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints. European Journal of Operational Research, 302(1), 96-116. https://doi.org/10.1016/j.ejor.2021.12.002 es_ES
dc.description.references Arain, M.S., Khan, M.A., & Kalwar, M.A. (2020). Optimization of Target Calculation Method for Leather Skiving and Stamping: Case of Leather Footwear Industry. International Journal of Business Education and Management Studies (IJBEMS), 7(1), 15-30. https://www.ijbems.com/doc/IJBEMS-137.pdf es_ES
dc.description.references Aung, K.N. Y., & Tun, Y.Y. (2019). Assembly Line Balancing to Improve Productivity using Work Sharing Method in Garment Factories. International Journal of Trend in Scientific Research and Development, 3(5), 1582-1587. es_ES
dc.description.references Bongomin, O., Mwasiagi, J.I., Nganyi, E.O., & Nibikora, I. (2020a). Engineering Reports - 2020 - Bongomin - A complex garment assembly line balancing using simulation-based optimization.pdf. Engineering Reports, e12258. https://doi.org/10.1002/eng2.12258 es_ES
dc.description.references Bongomin, O., Mwasiagi, J.I., Nganyi, E.O., & Nibikora, I. (2020b). Improvement of garment assembly line efficiency using line balancing technique. Engineering Reports, 2(4), 1-18. https://doi.org/10.1002/eng2.12157 es_ES
dc.description.references Budiman, I., Sembiring, A.C., Tampubolon, J., Wahyuni, D., & Dharmala, A. (2019). Improving effectiveness and efficiency of assembly line with a stopwatch time study and balancing activity elements. Journal of Physics: Conference Series, 1230(1). https://doi.org/10.1088/1742-6596/1230/1/012041 es_ES
dc.description.references Bukhsh, M., Khan, M.A., Zaidi, I.H., Yaseen, R., Khalid, A., Razzaque, A., & Ali, M. (2021). Productivity Improvement in Textile Industry using Lean Manufacturing Practice of Single Minute Die Exchange ( SMED ). Proceedings of the 11th Annual International Conference on Industrial Engineering and Operations Management Singapore, March 7-11, 2021. http://www.ieomsociety.org/singapore2021/papers/1282.pdf es_ES
dc.description.references Chaudhry, A.K., Kalwar, M.A., Khan, M.A., & Shaikh, S.A. (2021). Improving the Efficiency of Small Management Information System by Using VBA. International Journal of Science and Engineering Investigations, 10(111), 7-13. http://www.ijsei. com/papers/ijsei-1011121-02.pdf es_ES
dc.description.references Chutima, P. (2020). Research trends and outlooks in assembly line balancing problems. Engineering Journal, 24(5), 93-134. https://doi.org/10.4186/ej.2020.24.5.93 es_ES
dc.description.references Çil, Z.A., Li, Z., Mete, S., & Özceylan, E. (2020). Mathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human-robot collaboration. Applied Soft Computing Journal, 93(106394). https://doi.org/10.1016/j.asoc.2020.106394 es_ES
dc.description.references Fani, V., Bindi, B., & Bandinelli, R. (2020). Balancing assembly line in the footwear industry using simulation: A case study. Proceedings - European Council for Modelling and Simulation, ECMS, 34(1). https://doi.org/10.7148/2020-0056 es_ES
dc.description.references Germanes, J.S., Puga, M.F., Sabio, R.B., Sanchez, E.M., & Hugo, J.C. (2017). Improving Efficiency of Shoe Manufacturer through the Use of Time and Motion Study and Line Balancing. Journal of Industrial and Intelligent Information, 5(1), 16-22. https://doi.org/10.18178/jiii.5.1.16-22 es_ES
dc.description.references Haque, T.M., Hossain, R.M., & Hasan, S.M. (2018). Bottleneck problem reduction of a garment manufacturing industry in Bangladesh by using line balancing technique. International Journal of Research in Advanced Engineering and Technology, 4(2), 28-32. https://doi.org/10.13140/RG.2.2.32627.84004 es_ES
dc.description.references Iftikhar, Z., Khan, M.A., Kumar, R., Bux, K., & Haseeb, A. (2021). Productivity Improvement of Garments Industry by Assembly Line Technique of Lean Manufacturing. Proceedings (Abstract) of the International Conference on Industrial & Mechanical Engineering and Operations Management Dhaka, Bangladesh, December 26-27, 2021., 908. https://ieomsociety.org/proceedings/2021dhaka/497.pdf es_ES
dc.description.references Iftikhar, Z., Khan, M.A., Soomro, A.S., Kumar, R., Bux, K., Haseeb, A., & Naz, A. (2022). Productivity Improvement of Assembly Line in Textile Stitching Unit by Lean Techniques of Line Balancing and Time and Motion Study. International Journal of Science and Engineering Investigations (IJSEI), 11(127), 51-60. http://www.ijsei.com/papers/ijsei-1112722-07.pdf es_ES
dc.description.references Iftikhar, Z., Kumar, R., Bux, K., Haseeb, A., Khan, M.A., Naz, A., Hassam, & Soomro, A.S. (2022). Lean Manufacturing Tools and Techniques for the Productivity Improvement in Assembly Lines Operations of Industries. International es_ES
dc.description.references Research Journal of Modernization in Engineering Technology and Science, 4(7), 4554-4562. https://www.irjmets. com/uploadedfiles/paper//issue_7_july_2022/28986/final/fin_irjmets1663258443.pdf es_ES
dc.description.references Kalwar, M.A., Khan, M.A., Phul, Z., Wadho, M.H., Shahzad, M.F., & Marri, H.B. (2022). The analysis of performance before and after ERP implementation: a case of a manufacturing company. Journal of Applied Research in Technology & Engineering, 3(2), 115-121. https://doi.org/10.4995/jarte.2022.17789 es_ES
dc.description.references Kalwar, M.A., Shaikh, S.A., Khan, M.A., & Malik, T.S. (2020). Optimization of Vendor Rate Analysis Report Preparation Method by Using Visual Basic for Applications in Excel (Case Study of Footwear Company of Lahore). Proceedings of the International Conference on Industrial Engineering and Operations Management (IEOM, Dhaka, Bangladesh, December 26-27. https://ieomsociety.org/proceedings/2021dhaka/228.pdf es_ES
dc.description.references Kathem, A.S., A.H.Al-Kindi, L., & Al-Baldawi, Z. (2021). Integration of Lean Concepts and Line balancing Focusing on Value Adding Activities. Design Engineering, 6, 6263-6275. es_ES
dc.description.references Khan, M.A. (2018). Preliminary Study on Lean Manufacturing Practices at Yarn Manufacturing Industry - A Case Study [Masters of Engineering (Thesis), Department of Industrial Engineering & Management, Mehran University of Engineering & Technology, Jamshoro, Sindh, Pakistan.]. https://doi.org/10.13140/RG.2.2.31557.37609 es_ES
dc.description.references Khan, M.A., Khatri, A., & Marri, H.B. (2020). Descriptive analysis of lean manufacturing practices in textile industry. Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020, 3870-3871. http://www.ieomsociety.org/detroit2020/papers/753.pdf es_ES
dc.description.references Khan, M.A., Marri, H.B., & Khatri, A. (2020a). Exploring The Applications Of Lean Manufacturing Practices In Textile Industry. Proceedings of the International Conference on Industrial Engineering and Operations Management, Dubai, UAE, March 10-12, 2020, 2360-2361. http://www.ieomsociety.org/ieom2020/papers/545.pdf es_ES
dc.description.references Khan, M.A., Marri, H.B., & Khatri, A. (2020b). Preliminary Study on the Identification, Analysis and Elimination of Lean Manufacturing Wastes through Lean Manufacturing Practices at Yarn Manufacturing Industry. Proceedings of the International Conference on Industrial Engineering and Operations Management, Dubai, UAE, March 10-12, 2020, 2347-2349. http://www.ieomsociety.org/ieom2020/papers/189.pdf es_ES
dc.description.references Khan, M.A., Memon, M.S., & Soomro, A.S. (2020). Exploring the applications of lean manufacturing practices in automobile industry. Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020, August. http://www.ieomsociety.org/detroit2020/papers/727.pdf es_ES
dc.description.references Khan, M.A., Shaikh, S.A., Lakho, T.H., & Mughal, U.K. (2020). Potential of Lean Tool of Value Stream Mapping (VSM) in Manufacturing Industries. Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020, 3064-3074. http://www.ieomsociety.org/harare2020/papers/698.pdf es_ES
dc.description.references Khan, M.A., Shaikh, S.A., & Marri, S. (2020). Systematic review of lean manufacturing practices in pharmaceutical industry. Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020, August, 3674-3675. http://www.ieomsociety.org/detroit2020/papers/726.pdf es_ES
dc.description.references Khan, M.A., Soomro, A.S., Shaikh, S.A., Memon, M.S., & Marri, S. (2020). Lean manufacturing in pakistan: A comprehensive review. Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020, August. http://www.ieomsociety.org/detroit2020/papers/728.pdf es_ES
dc.description.references Khan, M.A., Kalwar, M.A., Malik, A.J., Malik, T.S., & Chaudhry, A.K. (2021). Automation of Supplier Price Evaluation Report in MS Excel by Using Visual Basic for Applications: A Case of Footwear Industry. International Journal of Science and Engineering Investigations (IJSEI), 10(113), 49-60. http://www.ijsei.com/papers/ijsei-1011321-08.pdf es_ES
dc.description.references Khan, M.A., Khatri, A., & Marri, H.B. (2021a). Applications of Waste Relations Matrix (WRM) in Lean Wastes Identification. Proceedings of the 11th Annual International Conference on Industrial Engineering and Operations Management Singapore, March 7-11, 2021. http://www.ieomsociety.org/singapore2021/papers/1269.pdf es_ES
dc.description.references Khan, M.A., Khatri, A., & Marri, H.B. (2021b). Identification of Defects in Various Processes of Spinning: A Case Study of Kotri, Sindh, Pakistan. Proceedings of the First Central American and Caribbean International Conference on Industrial Engineering and Operations Management, Port-Au-Prince, Haiti, June 15-16, 2021. http://ieomsociety.org/proceedings/2021haiti/299.pdf es_ES
dc.description.references Kumar, P., Khan, M.A., Mughal, U.K., & Kumar, S. (2020). Exploring the Potential of Six Sigma ( DMAIC ) in Minimizing the Production Defects. Proceedings of the 3rd International Conference on Industrial & Mechanical Engineering and Operations Management Dhaka, Bangladesh, December 26-27, 2020. http://www.ieomsociety.org/imeom/260.pdf es_ES
dc.description.references Kumar, R., Iftikhar, Z., Bux, K., Haseeb, A., Khan, M.A., Naz, A., Hassam;, & Shaikh, S.A. (2022). Optimization of Fitted Sheet Set Assembly Line at Garments Industry by Lean Manufacturing Techniques and SAM Analysis. International Research Journal of Modernization in Engineering Technology and Science (IRJMETS), 4(10), 1634-1647. https://www.irjmets.com/uploadedfiles/paper//issue_10_october_2022/30821/final/fin_irjmets1667794675.pdf es_ES
dc.description.references Kumar, S., Khan, M.A., Ahmed, S., Rehman, A., & Luhar, E. (2020). A Case Study for Performance Evaluation of Motorcycle Assembly Line through the Lean Manufacturing Practice of Overall Equipment Effectiveness ( OEE ). Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020, 1622-1623. http://www.ieomsociety.org/ieom2020/papers/192.pdf es_ES
dc.description.references Lakho, T.H., Khan, M.A., Virk, S.I., & Indher, A.A. (2020). Implementation of Overall Equipment Effectiveness ( OEE ) in Maintenance Management. Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020, 3087-3098. http://www.ieomsociety.org/harare2020/papers/700.pdf es_ES
dc.description.references Lakho, T.H., Khan, M.A., Virk, S.I., & Indher, A.A. (2021). Evalaution of Overall Equipment Effectivness in a Heavy Engineering Industry: A Case Study. Proceedings in the First Central American and Caribbean International Conference on Industrial Engineering and Operations Management, Port-Au-Prince, Haiti, June 15-16, 2021. http://ieomsociety.org/proceedings/2021haiti/297.pdf es_ES
dc.description.references Li, Z., Kucukkoc, I., & Tang, Q. (2021). Enhanced branch-bound-remember and iterative beam search algorithms for type II assembly line balancing problem. Computers & Operations Research, 131, 105235. https://doi.org/10.1016/j.cor.2021.105235 es_ES
dc.description.references Manaye, M. (2019). Line Balancing Techniques for Productivity Improvement Improvement. International Journal of Mechanical and Industrial Technology, 7(1), 89-104. es_ES
dc.description.references Mekala, N., Sanju, S.D., Thamaraiselvan, V., & Kavya, M. (2021). Implementation of Industrial Engineering concepts in Apparel Industry to improving Productivity and it's cost reduction. IOP Conference Series: Materials Science and Engineering, 1059(1). https://doi.org/10.1088/1757-899X/1059/1/012027 es_ES
dc.description.references Mughal, U.K., Khan, M.A., Kumar, P., & Kumar, S. (2020). Applications of Lean Six Sigma ( LSS ) in Production Systems. Proceedings of the 2nd African International Conference on Industrial Engineering and Operations Management Harare, Zimbabwe, December 7-10, 2020, 3075-3086. http://www.ieomsociety.org/harare2020/papers/699.pdf es_ES
dc.description.references Mughal, U.K., Khan, M.A., Kumar, P., & Kumar, S. (2021). Identification and Analysis of Stitching Defects at the Stitching Unit: A Case Study. Proceedings of the First Central American and Caribbean International Conference on Industrial Engineering and Operations Management, Port-Au-Prince, Haiti, June 15-16, 2021. http://ieomsociety.org/proceedings/2021haiti/298.pdf es_ES
dc.description.references Mulani, S.J., Awasare, A.D., Shetenawar, R.M., & Panchal, R.N. (2019). Line Balancing by Using Time Study. International Journal of Scientific Research and Engineering Development, 2(4), 302-304. https://doi.org/10.17148/IARJSET es_ES
dc.description.references Rada-Vilela, J., Chica, M., Cordón, Ó., & Damas, S. (2013). A comparative study of multi-objective ant colony optimization algorithms for the time and space assembly line balancing problem. Applied Soft Computing, 13(11), 4370-4382. https://doi.org/10.1016/j.asoc.2013.06.014 es_ES
dc.description.references Rajput, S., Khan, M.A., Samejo, S., Murtaza, G., & Ali, R.A. (2020). Productivity Improvement by the Implementation of lean manufacturing practice ( takt time ) in an automobile assembling plant. Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020, 1618-1619. http://www.ieomsociety.org/ieom2020/papers/190.pdf es_ES
dc.description.references Sahito, S.A., Khan, M.A., Arain, A.A., Bhutto, S.A., Wadhyo, R., & Memon, S.A. (2020). A Study For The Identification And Elimination Of Lean Manufacturing Wastes At The Pharmaceutical Production Plant Improvement By The Implementation Of Lean Manufacturing Practice ( Takt Time ). Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020, 1620-1621. http://www.ieomsociety.org/ieom2020/papers/191.pdf es_ES
dc.description.references Schlüter, M.J., & Ostermeier, F.F. (2022). Dynamic line balancing in unpaced mixed-model assembly lines: A problem classification. CIRP Journal of Manufacturing Science and Technology, 37, 134-142. https://doi.org/10.1016/j.cirpj.2022.01.012 es_ES
dc.description.references Shakib, M.N., Rahman, M.M., Parvez, M.S., & Haque, A.S. M. (2014). Study of Lean facility Layout in Garment Manufacturing Process: Focusing Sewing Section of Men's Shirt. International Conference on Mechanical, Industrial and Energy Engineering. es_ES
dc.description.references Shar, W.A., Shaikh, S.A., & Khan, M.A. (2021). Analysis of Production System of Pharmaceutical Company by Using Lean Technique of Overall Equipment Effectiveness (OEE). Journal of Contemporary Issues in Business and Government (CIBG), 27(5), 2407-2417. https://cibgp.com/pdf_15891_5952933fe85877ac4ca9e9d3db87c667.html es_ES
dc.description.references Sikora, C.G. S., Lopes, T.C., & Magatão, L. (2017). Traveling worker assembly line (re)balancing problem: Model, reduction techniques, and real case studies. European Journal of Operational Research, 259, 949-971. https://doi.org/10.1016/j.ejor.2016.11.027 es_ES
dc.description.references Xie, Z., Du, J., Chen, Q., & Wang, X. (2021). Enhancing the labor division in the balancing of apparel assembly lines with parallel workstation through an improved ant colony algorithm. Journal of Engineered Fibers and Fabrics, 16, 1-14. https://doi.org/10.1177/15589250211055784 es_ES
dc.description.references Yemane, A. (2021). Productivity Improvement of BOB T-Shirt through Line Balancing Using Control Limit Analysis and Discrete Event Simulation, Case Study: MAA Garment and Textile Factory. Journal of Optimization in Industrial Engineering, 14(2), 19-32. https://doi.org/10.22094/JOIE.2020.561766.1545 es_ES
dc.description.references Zaidi, I.H., Khan, M.A., Bukhsh, M., Yaseen, R., & Shaikh, S.A. (2021). Implementation of Lean Manufacturing Practices in Diverse Manufacturing Industries. Proceedings of the 11th Annual International Conference on Industrial Engineering and Operations Management Singapore, March 7-11, 2021. http://www.ieomsociety.org/singapore2021/ papers/1268.pdf es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem