Benefits of Building Information Modeling in Road Projects for Cost Overrun Factors Mitigation

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Sánchez, Omar es_ES
dc.contributor.author Castañeda, Karen es_ES
dc.contributor.author Herrera, Rodrigo F. es_ES
dc.contributor.author Pellicer, Eugenio es_ES
dc.date.accessioned 2023-02-17T07:24:19Z
dc.date.available 2023-02-17T07:24:19Z
dc.date.issued 2022-03-12 es_ES
dc.identifier.isbn 978-0-7844-8395-4 es_ES
dc.identifier.uri http://hdl.handle.net/10251/191896
dc.description.abstract [EN] Road projects around the world are widely affected by the cost overrun phenomenon. BIM can greatly contribute to cost overrun mitigation; however, the BIM adoption in road projects is limited compared to building projects. Besides, studies focused on analyzing the impact of BIM on mitigating cost overruns in road projects are lacking. Therefore, this study presents a review of road projects with BIM implementation, in which the BIM benefits that can contribute to the cost overrun mitigation are analyzed. The research method is composed of the following stages: (1) a systematic review is performed; (2) relevant studies are chosen based on inclusion/exclusion criteria; (3) qualitative evidence is categorized; (4) qualitative evidence is analyzed with a set of experts; and (5) contributions are summarized. A total of 21 road projects were studied, in which a set of BIM implementation benefits were identified. Thus, a professional workshop analyzed the interactions between BIM benefits and the main cost overruns causative factors. The findings indicate that the BIM implementation in road projects contributes to mitigating cost overruns factors, such as inadequate project planning, design changes, failures in design, project scope changes, late decision-making by the owner, and others. The three BIM benefits that most influence the mitigation of cost overruns factors in road projects are: (1) better coordination and collaboration among stakeholders; (2) improvements in decision-making processes; and (3) obtaining accurate, integrated, and detailed information. es_ES
dc.language Inglés es_ES
dc.publisher American Society of Civil Engineers es_ES
dc.relation.ispartof Construction Research Congress 2022: Infrastructure Sustainability and Resilience es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject.classification PROYECTOS DE INGENIERIA es_ES
dc.title Benefits of Building Information Modeling in Road Projects for Cost Overrun Factors Mitigation es_ES
dc.type Comunicación en congreso es_ES
dc.type Capítulo de libro es_ES
dc.identifier.doi 10.1061/9780784483978.049 es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports es_ES
dc.description.bibliographicCitation Sánchez, O.; Castañeda, K.; Herrera, RF.; Pellicer, E. (2022). Benefits of Building Information Modeling in Road Projects for Cost Overrun Factors Mitigation. American Society of Civil Engineers. 472-482. https://doi.org/10.1061/9780784483978.049 es_ES
dc.description.accrualMethod S es_ES
dc.relation.conferencename CI & CRC Joint Conference 2022 es_ES
dc.relation.conferencedate Marzo 09-12,2022 es_ES
dc.relation.conferenceplace Arligton, USA es_ES
dc.relation.publisherversion https://doi.org/10.1061/9780784483978.049 es_ES
dc.description.upvformatpinicio 472 es_ES
dc.description.upvformatpfin 482 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.relation.pasarela S\459619 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem