- -

Construction of RC building structures: ICITECH's experience during the last 30 years

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

  • Estadisticas de Uso

Construction of RC building structures: ICITECH's experience during the last 30 years

Show full item record

Buitrago, M.; Calderón García, PA.; Moragues, JJ.; Adam, JM. (2023). Construction of RC building structures: ICITECH's experience during the last 30 years. Proceedings of the Institution of Civil Engineers - Structures and Buildings. 176(3):1-6. https://doi.org/10.1680/jstbu.20.00271

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/193129

Files in this item

Item Metadata

Title: Construction of RC building structures: ICITECH's experience during the last 30 years
Author: Buitrago, Manuel Calderón García, Pedro Antonio Moragues, Juan J Adam, Jose M
UPV Unit: Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports
Issued date:
Abstract:
[EN] This paper contains a summary of the experience obtained by ICITECH's researchers at the Universitat Politècnica de València in the last thirty years of investigating reinforced concrete (RC) building structures under ...[+]
Subjects: Buildings , Structures & design , Concrete structures , Temporary works
Copyrigths: Reserva de todos los derechos
Source:
Proceedings of the Institution of Civil Engineers - Structures and Buildings. (issn: 0965-0911 )
DOI: 10.1680/jstbu.20.00271
Publisher:
Thomas Telford Ltd.
Publisher version: https://doi.org/10.1680/jstbu.20.00271
Project ID:
info:eu-repo/grantAgreement/MINISTERIO DE EDUCACION //BIA2004-02085//ESTUDIO EXPERIMENTAL Y NUMERICO DE LA CONSTRUCCION DE FORJADOS HORMIGONADOS IN-SITU MEDIANTE SISTEMAS DE CIMBRADO Y DESCIMBRADO. /
...[+]
info:eu-repo/grantAgreement/MINISTERIO DE EDUCACION //BIA2004-02085//ESTUDIO EXPERIMENTAL Y NUMERICO DE LA CONSTRUCCION DE FORJADOS HORMIGONADOS IN-SITU MEDIANTE SISTEMAS DE CIMBRADO Y DESCIMBRADO. /
info:eu-repo/grantAgreement/Encofrados J. Alsina, S.A.//Alsina//PROCESOS DE CONSTRUCCIÓN DE EDIFICIOS DE FORJADOS DE HORMIGÓN IN SITU MEDIANTE EL USO DE LIMITADORES DE CARGA EN LAS CIMBRAS/
info:eu-repo/grantAgreement/UPV-VIN//2009//OPTIMIZACION HEURISTICA DEL PROCESO CONSTRUCTIVO DE FORJADOS HORMIGONADOS IN SITU MEDIANTE OPERACIONES DE CIMBRADO, CLAREADO, RECIMBRADO Y DESCIMBRADO DE PLANTAS./
info:eu-repo/grantAgreement/MINISTERIO DE EDUCACION //AP2013-02466//AYUDA CONTRATO FPU 2013-BUITRAGO MORENO/
info:eu-repo/grantAgreement/GENERALITAT VALENCIANA//GV%2F2015%2F063//OPTIMIZACION DEL PROCESO DE CONSTRUCCION DE EDIFICIOS DE FORJADOS DE HORMIGON IN SITU MEDIANTE EL USO DE LIMITADORES DE CARGA EN LAS CIMBRAS (ECIM)./
info:eu-repo/grantAgreement/Levantina, Ingeniería y Construcción S.L.//LIC//PROCESOS DE CONSTRUCCIÓN DE EDIFICIOS DE FORJADOS DE HORMIGÓN IN SITU MEDIANTE EL USO DE LIMITADORES DE CARGA EN LAS CIMBRAS/
info:eu-repo/grantAgreement/UPV//PAID-06-11/
[-]
Thanks:
The authors are grateful to the Spanish Ministry of Education, Culture and Sport (FPU13/02466), the Spanish Ministry for Science and Technology (BIA2004-02085), the Generalitat Valenciana (GV/2015/063), Universitat Politècnica ...[+]
Type: Artículo

recommendations

 

This item appears in the following Collection(s)

Show full item record