Resumen:
|
[EN] This paper contains a summary of the experience obtained by ICITECH's researchers at the Universitat Politècnica de València in the last thirty years of investigating reinforced concrete (RC) building structures under ...[+]
[EN] This paper contains a summary of the experience obtained by ICITECH's researchers at the Universitat Politècnica de València in the last thirty years of investigating reinforced concrete (RC) building structures under construction. During this period ambitious experimental campaigns and advanced computational simulations have been carried out, and new analytical methods have been formulated to assess slab-shore load transmissions in buildings under construction. From all these campaigns the following main conclusions can be derived: 1) the importance of considering construction processes when planning building projects; 2) the use of analytical methods to evaluate construction processes adapted to the current requirements of efficiency and sustainability; and 3) the need to improve the robustness of temporary shoring or propping structures. Improving the construction sector necessarily involves the implementation of the above measures in buildings under construction and the use of new monitoring and inspection technologies for the construction processes applied.
[-]
|
Código del Proyecto:
|
info:eu-repo/grantAgreement/MINISTERIO DE EDUCACION //BIA2004-02085//ESTUDIO EXPERIMENTAL Y NUMERICO DE LA CONSTRUCCION DE FORJADOS HORMIGONADOS IN-SITU MEDIANTE SISTEMAS DE CIMBRADO Y DESCIMBRADO. /
...[+]
info:eu-repo/grantAgreement/MINISTERIO DE EDUCACION //BIA2004-02085//ESTUDIO EXPERIMENTAL Y NUMERICO DE LA CONSTRUCCION DE FORJADOS HORMIGONADOS IN-SITU MEDIANTE SISTEMAS DE CIMBRADO Y DESCIMBRADO. /
info:eu-repo/grantAgreement/Encofrados J. Alsina, S.A.//Alsina//PROCESOS DE CONSTRUCCIÓN DE EDIFICIOS DE FORJADOS DE HORMIGÓN IN SITU MEDIANTE EL USO DE LIMITADORES DE CARGA EN LAS CIMBRAS/
info:eu-repo/grantAgreement/UPV-VIN//2009//OPTIMIZACION HEURISTICA DEL PROCESO CONSTRUCTIVO DE FORJADOS HORMIGONADOS IN SITU MEDIANTE OPERACIONES DE CIMBRADO, CLAREADO, RECIMBRADO Y DESCIMBRADO DE PLANTAS./
info:eu-repo/grantAgreement/MINISTERIO DE EDUCACION //AP2013-02466//AYUDA CONTRATO FPU 2013-BUITRAGO MORENO/
info:eu-repo/grantAgreement/GENERALITAT VALENCIANA//GV%2F2015%2F063//OPTIMIZACION DEL PROCESO DE CONSTRUCCION DE EDIFICIOS DE FORJADOS DE HORMIGON IN SITU MEDIANTE EL USO DE LIMITADORES DE CARGA EN LAS CIMBRAS (ECIM)./
info:eu-repo/grantAgreement/Levantina, Ingeniería y Construcción S.L.//LIC//PROCESOS DE CONSTRUCCIÓN DE EDIFICIOS DE FORJADOS DE HORMIGÓN IN SITU MEDIANTE EL USO DE LIMITADORES DE CARGA EN LAS CIMBRAS/
info:eu-repo/grantAgreement/UPV//PAID-06-11/
[-]
|
Agradecimientos:
|
The authors are grateful to the Spanish Ministry of Education,
Culture and Sport (FPU13/02466), the Spanish Ministry for
Science and Technology (BIA2004-02085), the Generalitat
Valenciana (GV/2015/063), Universitat Politècnica ...[+]
The authors are grateful to the Spanish Ministry of Education,
Culture and Sport (FPU13/02466), the Spanish Ministry for
Science and Technology (BIA2004-02085), the Generalitat
Valenciana (GV/2015/063), Universitat Politècnica de València
(PAID-06-11), Encofrados J. Alsina S.A., Levantina,
Ingeniería y Construcción S.L., SACYR, Lafarge, Ros
Casares, Copasa, and ACSA, which collectively funded this
line of research. They also truly appreciate the collaboration of
different researchers in various projects, with a special mention
for: Y. A. Alvarado, I. Gasch, B. Torres-Górriz, D. Di Palma,
T. M. Pellicer, I. Payá-Zaforteza, J. Catalá, E. Pellicer and
F. J. Pallarés.
[-]
|