Mostrar el registro sencillo del ítem
dc.contributor.advisor | Pellicer Climent, Francisco Javier | es_ES |
dc.contributor.author | Valero Prieto, Javier | es_ES |
dc.coverage.spatial | east=-0.3928088; north=39.4095224; name=Carrer Partida de la Dama, 11, 46470 Massanassa, Valencia, Espanya | es_ES |
dc.date.accessioned | 2023-12-01T17:27:13Z | |
dc.date.available | 2023-12-01T17:27:13Z | |
dc.date.created | 2023-09-18 | |
dc.date.issued | 2023-12-01 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/200414 | |
dc.description.abstract | [ES] El objetivo del TFG es el diseño y desarrollo de una nave industrial prefabricada sin uso específico en Massanassa. El diseño de dicha nave se realiza en base a las características del terreno para optimizarlo y aprovechar al máximo el terreno con nuestras especificaciones. El proyecto estará formado por diferentes partes: - Preparación del terreno y cimentaciones. - Fabricación de elementos prefabricados. - Transporte a obra de los elementos prefabricados. - Montaje en obra. El diseño de desarrolla en varias fases. En su inicio hay que determinar los requisitos necesarios acorde al uso, usuario, normativa específica y normativa del lugar. Después llegamos a la fase del diseño de la estructura, es decir, ajustar los elementos para poder ejecutarlos en fábrica. Una vez las tenemos fabricadas quedaría el transporte a obra y, a la vez su montaje en obra. Se formalizará la nave con la elaboración de planos en 2D y 3D mediante programas como autocad y Allplan, entre otros. | es_ES |
dc.description.abstract | [CA] L'objectiu del TFG és el disseny i desenvolupament d'una nau industrial prefabricada sense ús específic a Massanassa. El disseny d'aquesta nau es realitza sobre la base de les característiques del terreny per a optimitzar-lo i aprofitar al màxim el terreny amb les nostres especificacions. El projecte estarà format per diferents parts: - Preparació del terreny i fonamentacions. - Fabricació d'elements prefabricats. - Transport a obra dels elements prefabricats. - Muntatge en obra. El disseny de desenvolupa en diverses fases. En el seu inici cal determinar els requisits necessaris concorde a l'ús, usuari, normativa específica i normativa del lloc. Després arribem a la fase del disseny de l'estructura, és a dir, ajustar els elements per a poder executar-los en fàbrica. Una vegada les tenim fabricades quedaria el transport a obra i, alhora el seu muntatge en obra. Es formalitzarà la nau amb l'elaboració de plans en 2D i 3D mitjançant programes com autocad i Allplan, entre altres. | es_ES |
dc.description.abstract | [EN] The objective of the TFG is the design and development of a prefabricated industrial building without a specific use in Massanassa. The design of this building is based on the characteristics of the terrain to optimize and make the most of it according to our specifications. The project will consist of different parts: - Preparation of the site and foundations. - Manufacturing of prefabricated elements. - Transportation of the prefabricated elements to the construction site. - Assembly on-site. The design will be carried out in several phases. Initially, it is necessary to determine the necessary requirements according to the intended use, user, specific regulations, and local regulations. Then, we move on to the phase of structural design, i.e., adjusting the elements to be executed in the factory. Once they are manufactured, the transportation to the construction site and the assembly on-site will be carried out. The building will be formalized by creating 2D and 3D plans using programs such as AutoCAD and Allplan, among others. | es_ES |
dc.format.extent | 683 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Cimentación | es_ES |
dc.subject | Nave prefabricada | es_ES |
dc.subject | Nave | es_ES |
dc.subject | Elemento | es_ES |
dc.subject | Hormigón | es_ES |
dc.subject | Fabricación | es_ES |
dc.subject | Viga | es_ES |
dc.subject | Cerramiento | es_ES |
dc.subject | Proyecto | es_ES |
dc.subject | Warehouse | es_ES |
dc.subject | Element | es_ES |
dc.subject | Concrete | es_ES |
dc.subject | Manufacturing | es_ES |
dc.subject | Beam | es_ES |
dc.subject | Enclosure | es_ES |
dc.subject | Project | es_ES |
dc.subject | Prefabricated industrial building | es_ES |
dc.subject | Nau | es_ES |
dc.subject | Formigó | es_ES |
dc.subject | Fabricació | es_ES |
dc.subject | Biga | es_ES |
dc.subject | Tancament | es_ES |
dc.subject | Projecte | es_ES |
dc.subject.classification | INGENIERIA DE LA CONSTRUCCION | es_ES |
dc.subject.other | Grado en Ingeniería Mecánica-Grau en Enginyeria Mecànica | es_ES |
dc.title | Proyecto estructural de nave prefabricada de hormigón sin uso específico en Massanassa (Valencia) | es_ES |
dc.title.alternative | Structural project for a prefabricated concrete warehouse without specific use in Massanassa (Valencia) | es_ES |
dc.title.alternative | Projecte estructural de nau prefabricada de formigó sense ús específic a Massanassa (València) | es_ES |
dc.type | Proyecto/Trabajo fin de carrera/grado | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Politécnica Superior de Alcoy - Escola Politècnica Superior d'Alcoi | es_ES |
dc.description.bibliographicCitation | Valero Prieto, J. (2023). Proyecto estructural de nave prefabricada de hormigón sin uso específico en Massanassa (Valencia). Universitat Politècnica de València. http://hdl.handle.net/10251/200414 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\150195 | es_ES |