- -

Proyecto estructural de nave prefabricada de hormigón sin uso específico en Massanassa (Valencia)

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Proyecto estructural de nave prefabricada de hormigón sin uso específico en Massanassa (Valencia)

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Pellicer Climent, Francisco Javier es_ES
dc.contributor.author Valero Prieto, Javier es_ES
dc.coverage.spatial east=-0.3928088; north=39.4095224; name=Carrer Partida de la Dama, 11, 46470 Massanassa, Valencia, Espanya es_ES
dc.date.accessioned 2023-12-01T17:27:13Z
dc.date.available 2023-12-01T17:27:13Z
dc.date.created 2023-09-18
dc.date.issued 2023-12-01 es_ES
dc.identifier.uri http://hdl.handle.net/10251/200414
dc.description.abstract [ES] El objetivo del TFG es el diseño y desarrollo de una nave industrial prefabricada sin uso específico en Massanassa. El diseño de dicha nave se realiza en base a las características del terreno para optimizarlo y aprovechar al máximo el terreno con nuestras especificaciones. El proyecto estará formado por diferentes partes: - Preparación del terreno y cimentaciones. - Fabricación de elementos prefabricados. - Transporte a obra de los elementos prefabricados. - Montaje en obra. El diseño de desarrolla en varias fases. En su inicio hay que determinar los requisitos necesarios acorde al uso, usuario, normativa específica y normativa del lugar. Después llegamos a la fase del diseño de la estructura, es decir, ajustar los elementos para poder ejecutarlos en fábrica. Una vez las tenemos fabricadas quedaría el transporte a obra y, a la vez su montaje en obra. Se formalizará la nave con la elaboración de planos en 2D y 3D mediante programas como autocad y Allplan, entre otros. es_ES
dc.description.abstract [CA] L'objectiu del TFG és el disseny i desenvolupament d'una nau industrial prefabricada sense ús específic a Massanassa. El disseny d'aquesta nau es realitza sobre la base de les característiques del terreny per a optimitzar-lo i aprofitar al màxim el terreny amb les nostres especificacions. El projecte estarà format per diferents parts: - Preparació del terreny i fonamentacions. - Fabricació d'elements prefabricats. - Transport a obra dels elements prefabricats. - Muntatge en obra. El disseny de desenvolupa en diverses fases. En el seu inici cal determinar els requisits necessaris concorde a l'ús, usuari, normativa específica i normativa del lloc. Després arribem a la fase del disseny de l'estructura, és a dir, ajustar els elements per a poder executar-los en fàbrica. Una vegada les tenim fabricades quedaria el transport a obra i, alhora el seu muntatge en obra. Es formalitzarà la nau amb l'elaboració de plans en 2D i 3D mitjançant programes com autocad i Allplan, entre altres. es_ES
dc.description.abstract [EN] The objective of the TFG is the design and development of a prefabricated industrial building without a specific use in Massanassa. The design of this building is based on the characteristics of the terrain to optimize and make the most of it according to our specifications. The project will consist of different parts: - Preparation of the site and foundations. - Manufacturing of prefabricated elements. - Transportation of the prefabricated elements to the construction site. - Assembly on-site. The design will be carried out in several phases. Initially, it is necessary to determine the necessary requirements according to the intended use, user, specific regulations, and local regulations. Then, we move on to the phase of structural design, i.e., adjusting the elements to be executed in the factory. Once they are manufactured, the transportation to the construction site and the assembly on-site will be carried out. The building will be formalized by creating 2D and 3D plans using programs such as AutoCAD and Allplan, among others. es_ES
dc.format.extent 683 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Cimentación es_ES
dc.subject Nave prefabricada es_ES
dc.subject Nave es_ES
dc.subject Elemento es_ES
dc.subject Hormigón es_ES
dc.subject Fabricación es_ES
dc.subject Viga es_ES
dc.subject Cerramiento es_ES
dc.subject Proyecto es_ES
dc.subject Warehouse es_ES
dc.subject Element es_ES
dc.subject Concrete es_ES
dc.subject Manufacturing es_ES
dc.subject Beam es_ES
dc.subject Enclosure es_ES
dc.subject Project es_ES
dc.subject Prefabricated industrial building es_ES
dc.subject Nau es_ES
dc.subject Formigó es_ES
dc.subject Fabricació es_ES
dc.subject Biga es_ES
dc.subject Tancament es_ES
dc.subject Projecte es_ES
dc.subject.classification INGENIERIA DE LA CONSTRUCCION es_ES
dc.subject.other Grado en Ingeniería Mecánica-Grau en Enginyeria Mecànica es_ES
dc.title Proyecto estructural de nave prefabricada de hormigón sin uso específico en Massanassa (Valencia) es_ES
dc.title.alternative Structural project for a prefabricated concrete warehouse without specific use in Massanassa (Valencia) es_ES
dc.title.alternative Projecte estructural de nau prefabricada de formigó sense ús específic a Massanassa (València) es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Politécnica Superior de Alcoy - Escola Politècnica Superior d'Alcoi es_ES
dc.description.bibliographicCitation Valero Prieto, J. (2023). Proyecto estructural de nave prefabricada de hormigón sin uso específico en Massanassa (Valencia). Universitat Politècnica de València. http://hdl.handle.net/10251/200414 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\150195 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem