Assessment of a Fully Renewable System for the Total Decarbonization of the Economy with Full Demand Coverage on Islands Connected to a Central Grid: The Balearic Case in 2040

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Assessment of a Fully Renewable System for the Total Decarbonization of the Economy with Full Demand Coverage on Islands Connected to a Central Grid: The Balearic Case in 2040

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Rivera, Yago es_ES
dc.contributor.author Blanco, D. es_ES
dc.contributor.author Bastida-Molina, Paula es_ES
dc.contributor.author Berna, C. es_ES
dc.date.accessioned 2024-01-04T19:00:56Z
dc.date.available 2024-01-04T19:00:56Z
dc.date.issued 2023-08 es_ES
dc.identifier.uri http://hdl.handle.net/10251/201513
dc.description.abstract [EN] The transition to clean electricity generation is a crucial focus for achieving the current objectives of economy decarbonization. The Balearic Archipelago faces significant environmental, economic, and social challenges in shifting from a predominantly fossil fuel-based economy to one based on renewable sources. This study proposes implementing a renewable energy mix and decarbonizing the economy of the Balearic Islands by 2040. The proposed system involves an entirely renewable generation system with interconnections between the four Balearic islands and the Spanish mainland grid via a 650 MW submarine cable. This flexible electrical exchange can cover approximately 35% of the peak demand of 1900 MW. The scenario comprises a 6 GWp solar photovoltaic system, a wind system of under 1.2 GWp, and a 600 MW biomass system as generation sub-systems. A vanadium redox flow battery sub-system with a storage capacity of approximately 21 GWh and 2.5 GWp power is available to ensure system manageability. This system¿s levelized electricity cost (LCOE) is around 13.75 cEUR/kWh. The design also incorporates hydrogen as an alternative for difficult-to-electrify uses, achieving effective decarbonization of all final energy uses. A production of slightly over 5 × 104 tH2 per year is required, with 1.7 GW of electrolyzer power using excess electricity and water resources. The system enables a significant level of economy decarbonization, although it requires substantial investments in both generation sources and storage. es_ES
dc.description.sponsorship The authors would like to extend their gratitude to the Ministerio de Economia, Industria y Competitividad and Agencia Nacional de Investigacion under the FPI grant BES-2017-080031. es_ES
dc.language Inglés es_ES
dc.publisher MDPI AG es_ES
dc.relation.ispartof Machines (Basel) es_ES
dc.rights Reconocimiento (by) es_ES
dc.subject Renewable energy es_ES
dc.subject Wind generation es_ES
dc.subject Solar photovoltaic generation es_ES
dc.subject Mega-batteries es_ES
dc.subject Sub-grid interconnections es_ES
dc.subject Mainland grid connection es_ES
dc.subject Hydrogen production es_ES
dc.subject Exploratory analysis es_ES
dc.subject Sensitivity analysis es_ES
dc.subject.classification ESTADISTICA E INVESTIGACION OPERATIVA es_ES
dc.subject.classification INGENIERIA ELECTRICA es_ES
dc.title Assessment of a Fully Renewable System for the Total Decarbonization of the Economy with Full Demand Coverage on Islands Connected to a Central Grid: The Balearic Case in 2040 es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.3390/machines11080782 es_ES
dc.relation.projectID info:eu-repo/grantAgreement/MINECO//BES-2017-080031/ es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Facultad de Administración y Dirección de Empresas - Facultat d'Administració i Direcció d'Empreses es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingeniería del Diseño - Escola Tècnica Superior d'Enginyeria del Disseny es_ES
dc.description.bibliographicCitation Rivera, Y.; Blanco, D.; Bastida-Molina, P.; Berna, C. (2023). Assessment of a Fully Renewable System for the Total Decarbonization of the Economy with Full Demand Coverage on Islands Connected to a Central Grid: The Balearic Case in 2040. Machines (Basel). 11(8):1-29. https://doi.org/10.3390/machines11080782 es_ES
dc.description.accrualMethod S es_ES
dc.relation.publisherversion https://doi.org/10.3390/machines11080782 es_ES
dc.description.upvformatpinicio 1 es_ES
dc.description.upvformatpfin 29 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 11 es_ES
dc.description.issue 8 es_ES
dc.identifier.eissn 2075-1702 es_ES
dc.relation.pasarela S\498165 es_ES
dc.contributor.funder Ministerio de Economía, Industria y Competitividad es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem