Mostrar el registro sencillo del ítem
dc.contributor.advisor | Magraner Benedicto, María Teresa | es_ES |
dc.contributor.advisor | Cañada Soriano, Mar | es_ES |
dc.contributor.author | Herraiz Argudo, Andrés | es_ES |
dc.date.accessioned | 2024-03-06T16:13:46Z | |
dc.date.available | 2024-03-06T16:13:46Z | |
dc.date.created | 2024-02-14 | |
dc.date.issued | 2024-03-06 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/202942 | |
dc.description.abstract | [ES] En este TFM se pretende llevar a cabo el proyecto de una nueva instalación de climatización y producción de ACS en un centro deportivo ubicado en Valencia. En primer lugar, se realizará un estudio del marco normativo existente aplicable a las instalaciones que se van a diseñar, particularizando en la normativa sobre eficiencia energética y energías renovables. La fase de diseño comenzará planteando y estudiando las características técnicas (cargas debidas a equipos eléctricos, ocupación de cada uno de los espacios por horarios, zonas sin climatizar, renovaciones de aire por hora, recuperaciones necesarias por normativa y calidad del aire) y arquitectónicas del edificio (elementos utilizados para construir los cerramientos del edificio, fachadas o forjados en contacto con el terreno, en contacto con edificios colindantes y orientación de las fachadas). Una vez conocidos los requerimientos, se analizarán diferentes alternativas y se propondrá el sistema de instalación de climatización y producción de ACS más adecuado al edificio. Una vez seleccionado el tipo de instalación, se propondrán equipos concretos y reales para llevar a cabo la instalación teniendo en cuenta las potencias eléctricas necesarias y las potencias de frío y calor. Formalmente, el documento del TFM, estará compuesto por la Memoria descriptiva con el anexo de Cálculos, el Presupuesto, el Pliego de Condiciones y los Planos quedando perfectamente justificadas, definidas, presupuestadas y especificadas las instalaciones de climatización y producción de ACS para la contratación y ejecución de los trabajos | es_ES |
dc.description.abstract | [EN] The aim of this TFM is to carry out a project for a new air-conditioning and SHW production installation in a sports centre located in Valencia. Firstly, a study of the existing regulatory framework applicable to the installations to be designed will be carried out, with particular emphasis on the regulations on energy efficiency and renewable energies. The design phase will begin by considering and studying the technical characteristics (loads due to electrical equipment, occupation of each of the spaces by schedules, areas without air conditioning, air renewals per hour, recoveries required by regulations and air quality) and architectural characteristics of the building (elements used to construct the building envelopes, fronts or slabs in contact with the ground, in contact with adjacent buildings and orientation of the fronts). Once the requirements are known, different alternatives will be analysed and the most suitable air-conditioning and SHW production system for the building will be proposed. Once the type of installation has been selected, specific and real equipment will be proposed to carry out the installation, taking into account the necessary electrical power and the cooling and heating power. Formally, the TFM document will be made up of the descriptive report with the annex of calculations, the budget, the specifications and the plans, with the air-conditioning and SHW production installations being perfectly justified, defined, budgeted and specified for the contracting and execution of the work. | es_ES |
dc.format.extent | 130 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Climatización | es_ES |
dc.subject | ACS | es_ES |
dc.subject | Características arquitectónicas | es_ES |
dc.subject | Eficiencia energética | es_ES |
dc.subject | Energías renovables | es_ES |
dc.subject.classification | MAQUINAS Y MOTORES TERMICOS | es_ES |
dc.subject.other | Máster Universitario en Tecnología Energética para Desarrollo Sostenible-Màster Universitari en Tecnologia Energètica per a Desenvolupament Sostenible | es_ES |
dc.title | Proyecto de instalación de climatización y producción de ACS (agua caliente sanitaria) en centro deportivo ubicado en Valencia | es_ES |
dc.title.alternative | Project of installation of air conditioning and SHW (sanitary hot water) production in a sports center located in Valencia | es_ES |
dc.title.alternative | Projecte d instal·lació de climatització i producció d'ACS (aigua calenta sanitària) en centre esportiu situat a València | es_ES |
dc.type | Tesis de máster | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Termodinámica Aplicada - Departament de Termodinàmica Aplicada | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials | es_ES |
dc.description.bibliographicCitation | Herraiz Argudo, A. (2024). Proyecto de instalación de climatización y producción de ACS (agua caliente sanitaria) en centro deportivo ubicado en Valencia. Universitat Politècnica de València. http://hdl.handle.net/10251/202942 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\159895 | es_ES |