Mostrar el registro sencillo del ítem
dc.contributor.advisor | Balbastre Betoret, Patricia | es_ES |
dc.contributor.advisor | Guasque Ortega, Ana | es_ES |
dc.contributor.advisor | Simó Ten, José Enrique | es_ES |
dc.contributor.author | Aceituno Peinado, José María | es_ES |
dc.date.accessioned | 2024-04-08T01:37:44Z | |
dc.date.available | 2024-04-08T01:37:44Z | |
dc.date.created | 2024-02-23 | |
dc.date.issued | 2024-03-28 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/203212 | |
dc.description | Tesis por compendio | es_ES |
dc.description.abstract | [ES] Los sistemas de tiempo real se caracterizan por exigir el cumplimento de unos requisitos temporales que garanticen el funcionamiento aceptable de un sistema. Especialmente, en los sistemas de tiempo real estricto estos requisitos temporales deben ser inviolables. Estos sistemas suelen aplicarse en áreas como la aviación, la seguridad ferroviaria, satélites y control de procesos, entre otros. Por tanto, el incumplimiento de un requisito temporal en un sistema de tiempo real estricto puede ocasionar un fallo catastrófico. La planificación de sistemas de tiempo real es una área en la que se estudian y aplican diversas metodologías, heurísticas y algoritmos que intentan asignar el recurso de la CPU sin pérdidas de plazo. El uso de sistemas de computación multinúcleo es una opción cada vez más recurrente en los sistemas de tiempo real estrictos. Esto se debe, entre otras causas, a su alto rendimiento a nivel de computación gracias a su capacidad de ejecutar varios procesos en paralelo. Por otro lado, los sistemas multinúcleo presentan un nuevo problema, la contención que ocurre debido a la compartición de los recursos de hardware. El origen de esta contención es la interferencia que en ocasiones ocurre entre tareas asignadas en distintos núcleos que pretenden acceder al mismo recurso compartido simultáneamente, típicamente acceso a memoria compartida. Esta interferencia añadida puede suponer un incumplimiento de los requisitos temporales, y por tanto, la planificación no sería viable. En este trabajo se proponen nuevas metodologías y estrategias de planificación no convencionales para aportar soluciones al problema de la interferencia en sistemas multinúcleo. Estas metodologías y estrategias abarcan algoritmos de planificación, algoritmos de asignación de tareas a núcleos, modelos temporales y análisis de planificabilidad. El resultado del trabajo realizado se ha publicado en diversos artículos en revistas del área. En ellos se presentan estas nuevas propuestas que afrontan los retos de la planificación de tareas. En la mayoría de los artículos presentados la estructura es similar: se introduce el contexto en el que nos situamos, se plantea la problemática existente, se expone una propuesta para solventar o mejorar los resultados de la planificación, después se realiza una experimentación para evaluar de forma práctica la metodología propuesta, se analizan los resultados obtenidos y finalmente se exponen unas conclusiones sobre la propuesta. Los resultados de las metodologías no convencionales propuestas en los artículos que conforman esta tesis muestran una mejora del rendimiento de las planificaciones en comparación con algoritmos clásicos del área. Especialmente la mejora se produce en términos de disminución de la interferencia producida y mejora de la tasa de planificabilidad. | es_ES |
dc.description.abstract | [CA] Els sistemes de temps real es caracteritzen per exigir el compliment d'uns requisits temporals que garantisquen el funcionament acceptable d'un sistema. Especialment, en els sistemes de temps real estricte aquests requisits temporals han de ser inviolables. Aquests sistemes solen aplicar-se en àrees com l'aviació, la seguretat ferroviària, satèl·lits i control de processos, entre altres. Per tant, l'incompliment d'un requisit temporal en un sistema de temps real estricte pot ocasionar un error catastròfic. La planificació de sistemes de temps real és una àrea en la qual s'estudien i apliquen diverses metodologies, heurístiques i algorismes que intenten assignar el recurs de la CPU sense pèrdues de termini. L'ús de sistemes de computació multinucli és una opció cada vegada més recurrent en els sistemes de temps real estrictes. Això es deu, entre altres causes, al seu alt rendiment a nivell de computació gràcies a la seua capacitat d'executar diversos processos en paral·lel. D'altra banda, els sistemes multinucli presenten un nou problema, la contenció que ocorre a causa de la compartició dels recursos de hardware. L'origen d'aquesta contenció és la interferència que a vegades ocorre entre tasques assignades en diferents nuclis que pretenen accedir al mateix recurs compartit simultàniament, típicament accés a memòria compartida. Aquesta interferència afegida pot suposar un incompliment dels requisits temporals, i per tant, la planificació no seria viable. En aquest treball es proposen noves metodologies i estratègies de planificació no convencionals per aportar solucions al problema de la interferència en sistemes multinucli. Aquestes metodologies i estratègies comprenen algorismes de planificació, algorismes d'assignació de tasques a nuclis, models temporals i anàlisis de planificabilitat. El resultat del treball realitzat s'ha publicat en diversos articles en revistes de l'àrea. En ells es presenten aquestes noves propostes que afronten els reptes de la planificació de tasques. En la majoria dels articles presentats l'estructura és similar: s'introdueix el context en el qual ens situem, es planteja la problemàtica existent, s'exposa una proposta per a solucionar o millorar els resultats de la planificació, després es realitza una experimentació per a avaluar de manera pràctica la metodologia proposada, s'analitzen els resultats obtinguts i finalment s'exposen unes conclusions sobre la proposta. Els resultats de les metodologies no convencionals proposades en els articles que conformen aquesta tesi mostren una millora del rendiment de les planificacions en comparació amb algorismes clàssics de l'àrea. Especialment, la millora es produeix en termes de disminució de la interferència produïda i millora de la taxa de planificabilitat. | es_ES |
dc.description.abstract | [EN] Real-time systems are characterised by the demand for temporal constraints that guarantee acceptable operation and feasibility of a system. Especially, in hard real-time systems these temporal constraints must be respected. These systems are typically applied in areas such as aviation, railway safety, satellites and process control, among others. Therefore, a missed deadline in a hard-real time system can lead to a catastrophic failure. The scheduling of real-time systems is an area where various methodologies, heuristics and algorithms are studied and applied in an attempt to allocate the CPU resources without missing any deadline. The use of multicore computing systems is an increasingly recurrent option in hard real-time systems. This is due, among other reasons, to its high computational performance thanks to the ability to run multiple processes in parallel. On the other hand, multicore systems present a new problem, the contention that occurs due to the sharing of hardware resources. The source of this contention is the interference that sometimes happens between tasks allocated in different cores that try to access the same shared resource simultaneously, typically shared memory access. This added interference can lead to miss a deadline, and therefore, the scheduling would not be feasible. This paper proposes new non-conventional scheduling methodologies and strategies to provide solutions to the interference problem in multicore systems. These methodologies and strategies include scheduling algorithms, task allocation algorithms, temporal models and schedulability analysis. The results of this work have been published in several journal articles in the field. In these articles the new proposals are presented, they face the challenges of task scheduling. In the majority of these articles the structure is similar: the context is introduced, the existing problem is identified, a proposal to solve or improve the results of the scheduling is presented, then the proposed methodology is experimented in order to evaluate it in practical terms, the results obtained are analysed and finally conclusions about the proposal are expressed. The results of the non-conventional methodologies proposed in the articles that comprise this thesis show an improvement in the performance of the scheduling compared to classical algorithms in the area. In particular, the improvement is produced in terms of reducing the interference and a higher schedulability rate. | es_ES |
dc.description.sponsorship | Esta tesis se ha realizado en el marco de dos proyectos de investigación de carácter nacional. Uno de ellos es el proyecto es PRECON-I4. Consiste en la búsqueda de sistemas informáticos predecibles y confiables para la industria 4.0. El otro proyecto es PRESECREL, que consiste en la búsqueda de modelos y plataformas para sistemas informáticos industriales predecibles, seguros y confiables. Tanto PRECON-I4 como PRESECREL son proyectos coordinados financiados por el Ministerio de Ciencia, Innovación y Universidades y los fondos FEDER (AEI/FEDER, UE). En ambos proyectos participa la Universidad Politécnica de Valencia, la Universidad de Cantabria y la Universidad Politécnica de Madrid. Además, en PRESECREL también participa IKERLAN S. COOP I.P. Además, parte de los resultados de esta tesis también han servido para validar la asignación de recursos temporales en sistemas críticos en el marco del proyecto METROPOLIS (PLEC2021-007609). | es_ES |
dc.format.extent | 193 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.relation | info:eu-repo/grantAgreement/AEI/Plan Estatal de Investigación Científica y Técnica y de Innovación 2013-2016/TIN2017-86520-C3-1-R/ES/SISTEMAS INFORMATICOS PREDECIBLES Y CONFIABLES PARA LA INDUSTRIA 4.0/ | es_ES |
dc.relation | info:eu-repo/grantAgreement/AEI/Plan Estatal de Investigación Científica y Técnica y de Innovación 2021-2023/PID2021-124502OB-C44/ES/MODELOS Y PLATAFORMAS PARA SISTEMA INFORMATICOS INDUSTRIALES PREDECIBLES, SEGUROS Y CONFIABLES/ | es_ES |
dc.relation | info:eu-repo/grantAgreement/AEI/Plan Estatal de Investigación Científica y Técnica y de Innovación 2017-2020/PLEC2021-007609/ES/Movilidad en la ciudad del futuro. Preparar a las ciudades para la nueva movilidad 2030 a través de las 4 universidades politécnicas españolas. METROPOLIS/ | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Mixed-integer linear programming (MILP) | es_ES |
dc.subject | Planificación de sistemas de tiempo real | es_ES |
dc.subject | Sistemas de tiempo real | es_ES |
dc.subject | Real-time systems | es_ES |
dc.subject | Scheduling | es_ES |
dc.subject | Optimal scheduling | es_ES |
dc.subject | Optimización de la planificación | es_ES |
dc.subject | Task allocation | es_ES |
dc.subject | Asignación de tareas | es_ES |
dc.subject | Sistemas multinúcleo | es_ES |
dc.subject | Modelos de tareas | es_ES |
dc.subject | Task models | es_ES |
dc.subject | Multicore systems | es_ES |
dc.subject.classification | ARQUITECTURA Y TECNOLOGIA DE COMPUTADORES | es_ES |
dc.title | Investigación de nuevas metodologías para la planificación de sistemas de tiempo real multinúcleo mediante técnicas no convencionales | es_ES |
dc.type | Tesis doctoral | es_ES |
dc.identifier.doi | 10.4995/Thesis/10251/203212 | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería de Sistemas y Automática - Departament d'Enginyeria de Sistemes i Automàtica | es_ES |
dc.description.bibliographicCitation | Aceituno Peinado, JM. (2024). Investigación de nuevas metodologías para la planificación de sistemas de tiempo real multinúcleo mediante técnicas no convencionales [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/203212 | es_ES |
dc.description.accrualMethod | TESIS | es_ES |
dc.type.version | info:eu-repo/semantics/acceptedVersion | es_ES |
dc.relation.pasarela | TESIS\14015 | es_ES |
dc.contributor.funder | Agencia Estatal de Investigación | es_ES |
dc.description.compendio | Compendio | es_ES |