dc.description.abstract | [ES] Hoy en día, con el estallido de la guerra entre Rusia y Ucrania, estamos viviendo en una nueva era del escenario energético: la seguridad del suministro está en riesgo y es un punto importante que no debe subestimarse. Esto debe considerarse junto con la descarbonización de la economía que figura en la Agenda 2030 de las Naciones Unidas (ODS 7 Energía asequible y limpia). Europa no puede hacer menos y tiene que confiar cada vez más en las energías renovables. Italia, en particular en los últimos años, ha centrado su atención en el sistema agrivoltaics que puede producir al mismo tiempo electricidad y alimentos, que es otro punto focal de la ONU (ODS 2 Hambre Cero). El proyecto se refiere a la instalación de una planta agrivoltaica con una capacidad de unos 2000kWp en el norte de Italia, en la Pianura Padana, que es un territorio cuyo principal sector económico es la agricultura. El presupuesto del proyecto será de entre 2 y 3 millones y durará aproximadamente un año: una gran parte de los costes corresponderá a los módulos fotovoltaicos, las estructuras de soporte y los cables eléctricos, mientras que en lo que respecta a los tiempos la parte principal serán los trabajos de instalación y las autorizaciones. El concepto del proyecto es producir tanto electricidad como alimentos, haciendo hincapié en el hecho de que la sinergia que se crearía rendiría mucho más en comparación con el uso único de los campos (uno sólo con paneles y el otro sólo con cultivos). El primer paso será analizar la superficie agrícola disponible para evaluar la integración con el sistema fotovoltaico. El diseño del trazado será crucial, dadas las limitaciones que pueden surgir teniendo en cuenta, por ejemplo, los sistemas de riego y la garantía de acceso a los campos agrícolas. Igualmente, importante será la elección de los cultivos y la gestión de los ciclos de sombra para evitar que los campos agrícolas sean improductivos. El Trabajo de Fin de Máster (TFM) se lleva a cabo desde la perspectiva de una empresa ficticia que fue contactada por un empresario que está interesado en implementar esta solución y quiere analizar diferentes ofertas para elegir la mejor. La primera fase comprenderá el análisis de la tecnología agrivoltaica y de los antecedentes para entender el contexto de la empresa. La segunda fase presupone la asunción del proyecto por parte de la empresa ficticia que realizará el Plan de Dirección del proyecto. Se incluirá la gestión del alcance, la gestión del cronograma, de los costos, de los recursos, la identificación y gestión de las partes interesadas, la gestión de las comunicaciones, de las adquisiciones, de la calidad, y de los riesgos. La ejecución y el control del proyecto no se incluirán en el alcance del TFM. | es_ES |
dc.description.abstract | [EN] Today, with the outbreak of Russian- Ukraine war, we are living in a new era of energy scenario: the security of supply is at risk, and it is a major point that shouldn¿t be underestimated. This is to be considered together with the decarbonization of the economy that is on the Agenda 2030 of United Nations (SDG 7 Affordable and Clean Energy). Europe can¿t do less and it has to rely more and more on renewable energies. Italy, in particular in the last years, has focused its attention on agrivoltaics system which can produce at the same time electricity and food, which is another focal point of UN (SDG 2 Zero Hunger). The project concerns the installation of an agrivoltaic plant with a capacity around 2000kWp in northern Italy, in the Pianura Padana, which is a territory whose main economic sector is agriculture. The project budget will be between 2 and 3 million and will last approximately one year: a large part of the costs will be for the photovoltaic modules, the support structures and the electrical cables, while the main part of the time will be for the installation works and the authorisations. The concept of the project is to produce both electricity and food, emphasising the fact that the synergy that would be created would yield much more compared to the single use of the fields (one with panels only and the other with crops only). The first step will be to analyse the available agricultural area to assess the integration with the PV system. The layout design will be crucial, given the constraints that may arise in terms of, for example, irrigation systems and ensuring access to the agricultural fields. Equally important will be the choice of crops and the management of shade cycles to avoid unproductive agricultural fields. The Master Thesis is carried out from the perspective of a fictitious company that was contacted by an entrepreneur who is interested in implementing this solution and wants to analyse different offers in order to choose the best one. The first phase will comprise the analysis of the agribusiness technology and the background to understand the context of the company. The second phase presupposes the take-over of the project by the fictitious company that will carry out the Project Management Plan. It will include scope management, schedule management, cost management, resource management, stakeholder identification and management, communications management, procurement, quality, and risk management. Project execution and control will not be included in the scope of the thesis. | es_ES |
dc.format.extent | 115 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Agrivoltaico | es_ES |
dc.subject | Plan de Dirección | es_ES |
dc.subject | Producción de electricidad | es_ES |
dc.subject | Producción de alimentos. | es_ES |
dc.subject | Agrivoltaics | es_ES |
dc.subject | Management Plan | es_ES |
dc.subject | Electricity production | es_ES |
dc.subject | Food production | es_ES |
dc.subject.classification | PROYECTOS DE INGENIERIA | es_ES |
dc.subject.other | Máster Universitario en Dirección y Gestión de Proyectos-Màster Universitari en Direcció i Gestió de Projectes | es_ES |
dc.title | Desarrollo del plan de dirección de un proyecto agrivoltaico nel Norte de Italia de 2000kWp | es_ES |
dc.title.alternative | Development of the management plan for a 2000kWp agricultural project in Northern Italy | es_ES |
dc.title.alternative | Desenvolupament del pla de direcció d'un projecte agrivoltaic nel Nord d'Itàlia de 2000kWp | es_ES |
dc.type | Tesis de máster | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Proyectos de Ingeniería - Departament de Projectes d'Enginyeria | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials | es_ES |
dc.description.bibliographicCitation | Rimondi, I. (2024). Desarrollo del plan de dirección de un proyecto agrivoltaico nel Norte de Italia de 2000kWp. Universitat Politècnica de València. http://hdl.handle.net/10251/210968 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\161620 | es_ES |