Análisis y mejora de los procesos productivos de una empresa de placas solares ubicada en Cheste mediante un estudio de tiempos

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Análisis y mejora de los procesos productivos de una empresa de placas solares ubicada en Cheste mediante un estudio de tiempos

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor García Melón, Mónica es_ES
dc.contributor.author Perelló Nieto, Pablo es_ES
dc.coverage.spatial east=-0.6604948341996231; north=39.477936201906495; name=Plaça Industrial Castilla, 35, 46380 Cheste, Valencia, Espanya es_ES
dc.date.accessioned 2024-11-07T09:33:46Z
dc.date.available 2024-11-07T09:33:46Z
dc.date.created 2024-09-13
dc.date.issued 2024-11-07 es_ES
dc.identifier.uri http://hdl.handle.net/10251/211469
dc.description.abstract [ES] En este Trabajo Final de Grado se tiene como objetivo realizar una mejora en la producción de los diferentes puestos de trabajo para una empresa proveedora de plantas solares, en concreto del departamento de controladores, cuya principal función es producir el movimiento de los paneles solares para captar mayor cantidad de energía solar. Para ello, se tiene en cuenta como requisito las necesidades de la empresa y de todos sus clientes. El análisis es realizado para todos los puestos de trabajo con los que cuenta la fábrica, los cuales se pueden diferenciar en la entrada de materia prima, el proceso de producción y la salida del producto terminado. La necesidad de llevar a cabo el proyecto se debe a la novedad de este controlador y su forma de almacenamiento. Para ello se realiza un estudio de métodos y tiempos para poder establecer diferentes mejoras en el proceso productivo que permitan reducir el tiempo de fabricación, eliminando todas las ineficiencias del proceso. Además, tras la realización de este análisis se ha logrado una mayor producción de los diferentes tipos de controladores, se ha incrementado la eficiencia de la fábrica e incluso se ha ajustado el objetivo de producción para poder crear un sistema de primas para los trabajadores. En conclusión, este estudio ha supuesto para la empresa un aumento de la producción y la eliminación de todas aquellas ineficiencias del proceso. A su vez también se ha conseguido una mejora en las condiciones laborales de los trabajadores y un mejor ambiente en la fábrica. es_ES
dc.description.abstract [CA] En este Treball Final de Grau es té com a objectiu realitzar una millora en la producció dels diferents llocs de treball per a una empresa proveïdora de plantes solars, en concret del departament de controladors, la principal funció dels quals és produir el moviment dels panells solars per a captar major quantitat d'energia solar. Per a això, es té en compte com a requisit les necessitats de l'empresa i de tots els seus clients. L'anàlisi és realitzada per a tots els llocs de treball amb els quals compta la fàbrica, els quals es poden diferenciar en l'entrada de matèria primera, el procés de producció i l'eixida del producte acabat. La necessitat de dur a terme el projecte es deu a la novetat d'este controlador i la seua forma d'emmagatzematge. Per a això es realitza un estudi de mètodes i temps per a poder establir diferents millores en el procés productiu que permeten reduir el temps de fabricació, eliminant totes les ineficiències del procés. A més, després de la realització d'esta anàlisi s'ha aconseguit una major producció dels diferents tipus de controladors, s'ha incrementat l'eficiència de la fàbrica i fins i tot s'ha ajustat l'objectiu de producció per a poder crear un sistema de primes per als treballadors. es_ES
dc.description.abstract [EN] The aim of this Final Degree Project is to improve the production of the different work stations for a company that supplies solar plants, specifically the controllers department, whose main function is to produce the movement of the solar panels to capture a greater amount of solar energy. For this purpose, the needs of the company and all its customers are taken into account as a requirement. The analysis is carried out for all the workstations in the factory, which can be differentiated into the input of raw materials, the production process and the output of the finished product. The need to carry out the project is due to the novelty of this controller and the way it is stored. To this end, a study of methods and times was carried out in order to establish different improvements in the production process to reduce manufacturing time, eliminating all the inefficiencies in the process. Furthermore, after carrying out this analysis, a greater production of the different types of controllers has been achieved, the efficiency of the factory has been increased and even the production target has been adjusted in order to create a bonus system for the workers. In conclusion, this study has led to an increase in production for the company and the elimination of all inefficiencies in the process. At the same time, it has also led to an improvement in the working conditions of the workers and a better atmosphere in the factory. es_ES
dc.format.extent 92 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Mejora continua es_ES
dc.subject Puestos de trabajo es_ES
dc.subject Estudio de métodos y tiempos es_ES
dc.subject Placas solares es_ES
dc.subject Millora contínua es_ES
dc.subject Llocs de treball es_ES
dc.subject Estudi de mètodes i temps. es_ES
dc.subject Plaques solars i flux logístic es_ES
dc.subject Continuous improvement es_ES
dc.subject Workstations es_ES
dc.subject Method and time study es_ES
dc.subject Solar panels and logistic flow es_ES
dc.subject Flujo logístico
dc.subject.classification PROYECTOS DE INGENIERIA es_ES
dc.subject.other Grado en Ingeniería en Tecnologías Industriales-Grau en Enginyeria en Tecnologies Industrials es_ES
dc.title Análisis y mejora de los procesos productivos de una empresa de placas solares ubicada en Cheste mediante un estudio de tiempos es_ES
dc.title.alternative Analysis and improvement of the production processes of a solar panels company located in Cheste through a time study. es_ES
dc.title.alternative Analisi i millora dels processos productius d' una empresa de plaques solars ubicada a Cheste mitjançant un estudi de temps. es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Proyectos de Ingeniería - Departament de Projectes d'Enginyeria es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials es_ES
dc.description.bibliographicCitation Perelló Nieto, P. (2024). Análisis y mejora de los procesos productivos de una empresa de placas solares ubicada en Cheste mediante un estudio de tiempos. Universitat Politècnica de València. http://hdl.handle.net/10251/211469 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\164549 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem