La gestión de la obra desde la perspectiva del último planificador

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

La gestión de la obra desde la perspectiva del último planificador

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Rodríguez Fernández, Antonio D. es_ES
dc.contributor.author Alarcon Cárdenas, Luis Fernando es_ES
dc.contributor.author Pellicer Armiñana, Eugenio es_ES
dc.date.accessioned 2013-05-27T12:12:00Z
dc.date.issued 2011
dc.identifier.issn 0034-8619
dc.identifier.uri http://hdl.handle.net/10251/29189
dc.description.abstract [ES] : La raíz de muchos de los problemas que confrontan las obras radica en el esquema tradicional de planificación de la producción, poco adecuado para lidiar con la incertidumbre y la variabilidad durante la construcción. Esto lo aprendieron hace algún tiempo las fábricas de automóviles que desarrollaron métodos, hoy denominados de ¿Lean Production¿ (Producción sin Pérdidas), que buscan crear ambientes de trabajo estables donde se pueda desarrollar eficientemente la producción. Inspirados en estos mismos principios, el Sistema del Último Planificador (SUP) propone modificar el proceso de programación y control de la obra con el fin de crear un ambiente estable de trabajo, protegiendo la producción de la incertidumbre y la variabilidad. Este sistema ha demostrado una alta efectividad, con multitud de aplicaciones exitosas en el continente americano, mejorando el desempeño de las obras y logrando progresos significativos en el cumplimiento de plazos y la productividad. El SUP no es una metodología que reemplace o compita con los métodos tradicionales de barras y de redes, si no que los complementa y enriquece. Mientras que los métodos de redes manejan el camino crítico, el SUP se preocupa de manejar la variabilidad; mientras los métodos de redes manejan fechas, el SUP maneja flujos de trabajo. La planificación con los métodos de redes generalmente se usa para gestionar contratos, mientras que el SUP se preocupa de gestionar interdependencias. El SUP pretende incrementar la fiabilidad de la planificación y, como consecuencia, mejorar los desempeños. En este artículo se describe el SUP y sus componentes y se presenta evidencia empírica que demuestra el impacto de su aplicación. Complementariamente se muestran algunas herramientas que han sido desarrolladas para apoyar la implementación práctica del sistema es_ES
dc.description.abstract [EN] The root of many problems that faces construction projects lie in the traditional approach to production planning, inappropriate to deal with uncertainty and variability during construction. This was learned some time ago by car manufacturers that developed methods, currently known as ¿Lean Production¿, looking for steady work-site environments where production could be efficiently developed. Inspired by these same principles, the Last Planner System (LPS) proposes to modify the scheduling and control system of the construction project to create a stable working environment, protecting production from uncertainty and variability. This system has proven highly effective, with a multitude of successful applications in the Americas, improving the performance of the construction projects and making significant progress in meeting deadlines and productivity. The LPS is not a methodology to replace or compete with traditional bars and network scheduling, but it complements and enriches them. While the network methods manage the critical path, LPS handles the variability; while the network methods manage time, LPS deals with workflows. Planning with network methods is commonly used to manage contracts, while LPS handles interdependencies. The LPS is intended to increase the reliability of scheduling and, therefore, improve performance. This paper describes the LPS and its components and provides empirical evidence showing the impact of its implementation. Additionally, some tools are shown; they have been developed to support the practical implementation of the system. es_ES
dc.language Español es_ES
dc.publisher Colegio de Ingenieros de Caminos, Canales y Puertos es_ES
dc.relation.ispartof Revista de Obras Públicas es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Compromiso es_ES
dc.subject Sin pérdidas es_ES
dc.subject Planificación es_ES
dc.subject Producción es_ES
dc.subject Obra es_ES
dc.subject Variabilidad es_ES
dc.subject Compromise es_ES
dc.subject Lean es_ES
dc.subject Planning es_ES
dc.subject Production es_ES
dc.subject Construction Project es_ES
dc.subject Variability es_ES
dc.subject.classification PROYECTOS DE INGENIERIA es_ES
dc.title La gestión de la obra desde la perspectiva del último planificador es_ES
dc.title.alternative The management of the construction project from the perspective of the last planner es_ES
dc.type Artículo es_ES
dc.embargo.lift 10000-01-01
dc.embargo.terms forever es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil es_ES
dc.description.bibliographicCitation Rodríguez Fernández, AD.; Alarcon Cárdenas, LF.; Pellicer Armiñana, E. (2011). La gestión de la obra desde la perspectiva del último planificador. Revista de Obras Públicas. 158(4408):35-44. http://hdl.handle.net/10251/29189 es_ES
dc.description.accrualMethod S es_ES
dc.relation.publisherversion http://ropdigital.ciccp.es/directorio_numeros.php?anio_ini=2010&anio_fin=2017&anio=2017 es_ES
dc.description.upvformatpinicio 35 es_ES
dc.description.upvformatpfin 44 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 158 es_ES
dc.description.issue 4408 es_ES
dc.relation.senia 208597


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem