- -

A conceptual model for integrating transport planning: MRP IV

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

A conceptual model for integrating transport planning: MRP IV

Show full item record

Mula, J.; Díaz-Madroñero Boluda, FM.; Peidro Payá, D. (2012). A conceptual model for integrating transport planning: MRP IV. En IFIP Advances in Information and Communication Technology. Springer. (384):54-65. doi:10.1007/978-3-642-33980-6_7

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/30297

Files in this item

Item Metadata

Title: A conceptual model for integrating transport planning: MRP IV
Author:
UPV Unit: Universitat Politècnica de València. Departamento de Organización de Empresas - Departament d'Organització d'Empreses
Issued date:
Abstract:
In this article, a conceptual model, called MRP IV, is proposed in order to serve as a reference to develop a new production technology that integrates material planning decisions, production resource capacities and supply ...[+]
Subjects: Integration , MRP , Production planning , Transport planning , Capacitated lot sizing problem , Conceptual model , Decision-making systems , MRP systems , New production technologies , Production resources , Solution approach , Sub-optimization , Management , Production control , Supply chains , Innovation
Copyrigths: Cerrado
ISBN: 978-3-642-33980-6
Source:
IFIP Advances in Information and Communication Technology. (issn: 1868-4238 )
DOI: 10.1007/978-3-642-33980-6_7
Publisher:
Springer
Publisher version: http://link.springer.com/chapter/10.1007%2F978-3-642-33980-6_7
Conference name: IFIP WG 5.7 International Conference, APMS 2011
Conference place: Stavanger, Norway
Conference date: September 26-28, 2011
Type: Capítulo de libro

This item appears in the following Collection(s)

Show full item record