Orlicky, J.: Material Requirements Planning. McGraw-Hill, New York (1975)
White, O.W.: MRP II—Unlocking America’s Productivity Potential. CBI Publishing, Boston (1981)
Schollaert, F.: Money resource planning, MRP-III: the ultimate marriage between business logistics and financial management information systems. Library Albert (1994)
[+]
Orlicky, J.: Material Requirements Planning. McGraw-Hill, New York (1975)
White, O.W.: MRP II—Unlocking America’s Productivity Potential. CBI Publishing, Boston (1981)
Schollaert, F.: Money resource planning, MRP-III: the ultimate marriage between business logistics and financial management information systems. Library Albert (1994)
Wylie, L.: ERP: A vision of the next-generation MRP II. Computer Integrated Manufacturing 300(339.2), 1–5 (1990)
Stadtler, H., Kilger, C.: Supply chain management and advanced planning: concepts, models, software and case studies. Springer, Berlin (2008)
Ptak, C., Smith, C.: Orlicky’s Material Requirements Planning 3/E. McGraw-Hill Professional (2011)
Karni, R.: Integer linear programming formulation of the material requirements planning problem. Journal of Optimization Theory and Applications 35(2), 217–230 (1981)
Billington, P.J., McClain, J.O., Thomas, L.J.: Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Management Science, 1126–1141 (1983)
Yenisey, M.M.: A flow-network approach for equilibrium of material requirements planning. International Journal of Production Economics 102(2), 317–332 (2006)
Noori, S., Feylizadeh, M.R., Bagherpour, M., Zorriassatine, F., Parkin, R.M.: Optimization of material requirement planning by fuzzy multi-objective linear programming. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 222(7), 887–900 (2008)
Tavakoli-Moghaddam, R., Bagherpour, M., Noora, A.A., Sassani, F.: Application of fuzzy lead time to a material requirement planning system. In: Proceedings of the 8th Conference on 8th WSEAS International Conference on Fuzzy Systems, vol. 8, pp. 208–213 (2007)
Sun, L., Heragu, S.S., Chen, L., Spearman, M.L.: Simulation analysis of a multi-item MRP system based on factorial design. In: Proceedings of the 2009 Winter Simulation Conference (WSC), pp. 2107–2114 (2009)
Inderfurth, K.: How to protect against demand and yield risks in MRP systems. International Journal of Production Economics 121(2), 474–481 (2009)
Barba-Gutiérrez, Y., Adenso-Díaz, B.: Reverse MRP under uncertain and imprecise demand. The International Journal of Advanced Manufacturing Technology 40(3), 413–424 (2009)
Mula, J., Poler, R., Garcia, J.P.: MRP with flexible constraints: A fuzzy mathematical programming approach. Fuzzy Sets and Systems 157(1), 74–97 (2006)
Mula, J., Poler, R., Garcia-Sabater, J.P.: Material Requirement Planning with fuzzy constraints and fuzzy coefficients. Fuzzy Sets and Systems 158(7), 783–793 (2007)
Mula, J., Poler, R., Garcia-Sabater, J.P.: Capacity and material requirement planning modelling by comparing deterministic and fuzzy models. International Journal of Production Research 46(20), 5589–5606 (2008)
Mula, J., Poler, R.: Fuzzy Material Requirement Planning. In: Kahraman, C., Yavuz, M. (eds.) Production Engineering and Management under Fuzziness. STUDFUZZ, vol. 252, pp. 39–57. Springer, Heidelberg (2010)
Li, T., Lin, P., Sun, G.J., Liu, H.H.: Application of Fuzzy Programming with Recourse in Material Requirement Planning Problem. In: International Conference on Measuring Technology and Mechatronics Automation, ICMTMA 2009, vol. 2, pp. 546–549 (2009)
Hnaien, F., Dolgui, A., Ould Louly, M.A.: Planned lead time optimization in material requirement planning environment for multilevel production systems. Journal of Systems Science and Systems Engineering 17(2), 132–155 (2008)
Louly, M.A., Dolgui, A., Hnaien, F.: Optimal supply planning in MRP environments for assembly systems with random component procurement times. International Journal of Production Research 46(19), 5441–5467 (2008)
Louly, M.A., Dolgui, A.: Optimal time phasing and periodicity for MRP with POQ policy. International Journal of Production Economics 131(1), 76–86 (2011)
Mula, J., Poler, R., Garcia-Sabater, J.P., Lario, F.C.: Models for production planning under uncertainty: A review. International Journal of Production Economics 103(1), 271–285 (2006)
Dolgui, A., Prodhon, C.: Supply planning under uncertainties in MRP environments: A state of the art. Annual Reviews in Control 31(2), 269–279 (2007)
Wazed, M., Ahmed, S., Nukman, Y.: A review of manufacturing resources planning models under different uncertainties: state-of-the-art and future directions (2010)
Chen, Y., Miao, W.M., Lin, Z.Q., Chen, G.L.: Adjusting MRP for dynamic differen-tiation of identical items for process customisation. Production Planning and Control 19(6), 616–626 (2008)
Ram, B., Naghshineh-Pour, M.R., Yu, X.: Material requirements planning with flexible bills-of-material. International Journal of Production Research 44(2), 399–415 (2006)
Lin, J.T., Chen, T.L., Lin, Y.T.: Critical material planning for TFT-LCD production industry. International Journal of Production Economics 122(2), 639–655 (2009)
Karimi, B., Fatemi Ghomi, S.M.T., Wilson, J.M.: The capacitated lot sizing problem: a review of models and algorithms. Omega 31(5), 365–378 (2003)
Jans, R., Degraeve, Z.: Modeling industrial lot sizing problems: a review. International Journal of Production Research 46(6), 1619–1643 (2008)
Quadt, D., Kuhn, H.: Capacitated lot-sizing with extensions: a review. 4OR: A Quarterly Journal of Operations Research 6(1), 61–83 (2008)
Buschkühl, L., Sahling, F., Helber, S., Tempelmeier, H.: Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectrum 32(2), 231–261 (2010)
Armentano, V.A., França, P.M., de Toledo, F.M.B.: A network flow model for the capacitated lot-sizing problem. Omega 27(2), 275–284 (1999)
Tempelmeier, H., Helber, S.: A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures. European Journal of Operational Research 75(2), 296–311 (1994)
Stadtler, H.: Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing. European Journal of Operational Research 94(3), 561–581 (1996)
Stadtler, H.: Reformulations of the shortest route model for dynamic multi-item multi-level capacitated lotsizing. OR Spectrum 19(2), 87–96 (1997)
Denizel, M., Altekin, F.T., Süral, H., Stadtler, H.: Equivalence of the LP relaxations of two strong formulations for the capacitated lot-sizing problem with setup times. OR Spectrum 30(4), 773–785 (2008)
Belvaux, G., Wolsey, L.A.: Modelling practical lot-sizing problems as mixed-integer programs. Management Science, 993–1007 (2001)
Suerie, C.: Modeling of period overlapping setup times. European Journal of Operational Research 174(2), 874–886 (2006)
Absi, N., Kedad-Sidhoum, S.: The multi-item capacitated lot-sizing problem with setup times and shortage costs. European Journal of Operational Research 185(3), 1351–1374 (2008)
Suerie, C., Stadtler, H.: The capacitated lot-sizing problem with linked lot sizes. Management Science, 1039–1054 (2003)
Federgruen, A., Meissner, J., Tzur, M.: Progressive interval heuristics for multi-item capacitated lot sizing problems. Operations Research 55(3), 490 (2007)
Akartunalı, K., Miller, A.J.: A heuristic approach for big bucket multi-level production planning problems. European Journal of Operational Research 193(2), 396–411 (2009)
Degraeve, Z., Jans, R.: A new Dantzig-Wolfe reformulation and branch-and-price algorithm for the capacitated lot-sizing problem with setup times. Operations Research 55(5), 909–920 (2007)
Chen, H., Chu, C.: A Lagrangian relaxation approach for supply chain planning with order/setup costs and capacity constraints. Journal of Systems Science and Systems Engineering 12(1), 98–110 (2003)
Jans, R., Degraeve, Z.: Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches. European Journal of Operational Research 177(3), 1855–1875 (2007)
Barbarosoglu, G., Özdamar, L.: Analysis of solution space-dependent performance of simulated annealing: the case of the multi-level capacitated lot sizing problem. Computers & Operations Research 27(9), 895–903 (2000)
Özdamar, L., Barbarosoglu, G.: An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem. International Journal of Production Economics 68(3), 319–331 (2000)
Berretta, R., Franca, P.M., Armentano, V.A.: Metaheuristic approaches for the multi-level resource-constrained lot-sizing problem with setup and lead times. Asia-Pacific Journal of Operational Research 22(2), 261–286 (2005)
Karimi, B., Ghomi, S.M.T.F., Wilson, J.M.: A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over. Journal of the Operational Research Society (March 2005)
Hung, Y.-F., Chien, K.-L., et al.: A multi-class multi-level capacitated lot sizing model (November 2000)
Xie, J., Dong, J.: Heuristic genetic algorithms for general capacitated lot-sizing problems. Computers & Mathematics with Applications 44(1-2), 263–276 (2002)
Jung, H., Song, I., Jeong, B.: Genetic algorithm-based integrated production planning considering manufacturing partners. The International Journal of Advanced Manufacturing Technology 32(5), 547–556 (2007)
Lee, W.S., Han, J.H., Cho, S.J.: A heuristic algorithm for a multi-product dynamic lot-sizing and shipping problem. International Journal of Production Economics 98(2), 204–214 (2005)
Garcia-Sabater, J.P., Maheut, J., Garcia-Sabater, J.J.: A capacitated material require-ments planning model considering delivery constraints: A case study from the automotive industry. In: International Conference on Computers & Industrial Engineering, CIE 2009, pp. 378–383 (2009)
Hwang, H.C.: Economic lot-sizing for integrated production and transportation. Operations Research 58(2), 428–444 (2010)
Ertogral, K.: Multi-item single source ordering problem with transportation cost: A Lagrangian decomposition approach. European Journal of Operational Research 191(1), 156–165 (2008)
Sancak, E., Sibel Salman, F.: Multi-item dynamic lot-sizing with delayed transportation policy. International Journal of Production Economics (2011)
[-]