- -

Initial operation of the cold and chilled water supply of sulphuric acid absorption chiller

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Initial operation of the cold and chilled water supply of sulphuric acid absorption chiller

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Ziegler, Felix es_ES
dc.contributor.author Casaban Julián, Leandro es_ES
dc.date.accessioned 2013-12-20T11:14:27Z
dc.date.available 2013-12-20T11:14:27Z
dc.date.created 2008-09
dc.date.issued 2013-12-20
dc.identifier.uri http://hdl.handle.net/10251/34647
dc.description.abstract Consulta en la Biblioteca ETSI Industriales (7803) es_ES
dc.description.abstract [EN] The aim of this project is the construction and the initial operation of a triple-effect absorption cooling machine. So, in the following pages will be explained all the steps done and all the problems solved to reach the target of this project. At the beginning, the design of the installation was done, most of the materials were bought and pre-assembled. Also the software was mostly programmed. But, the installation had to be changed partly, so all the pipes had to be cut and welded. Then, all the sensors and all the electric devices were inserted in the installation and connected to the data bus. The final program was programmed as a mixture of the existing ones. And finally, the tests were done to analyse that the flow meters were still calibrated after some time without using them, the heat exchanger could exchange enough heat, and the pumps and the heater were controlled with the program. After constructing and starting up the installation, there are some points that they need to be solved, like the overflow valve, which its opening pressure is very high. Another point necessary to review is the motor protection switch of the switching cabinet, because some of these switches are not adequate under the working conditions. In the future, the next steps necessary to realise are: ¿ Optimizing the programs for the automatic control of the plant ¿ Setting the optimal parameters for the PID controllers. ¿ Calibrating the temperature sensors of the installation. ¿ Connecting the installation to the Water/LiBr installation ¿ Starting up the triple-effect mode. es_ES
dc.language Inglés es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Consulta en la Biblioteca ETSI Industriales es_ES
dc.subject Suministro de agua es_ES
dc.subject Máquina de absorción es_ES
dc.subject Ácido sulfúrico es_ES
dc.subject.classification INGENIERIA QUIMICA es_ES
dc.subject.other Ingeniero Químico-Enginyer Químic es_ES
dc.title Initial operation of the cold and chilled water supply of sulphuric acid absorption chiller es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials es_ES
dc.description.bibliographicCitation Casaban Julián, L. (2008). Initial operation of the cold and chilled water supply of sulphuric acid absorption chiller. http://hdl.handle.net/10251/34647. es_ES
dc.description.accrualMethod Archivo delegado es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem