dc.description.abstract | The project is designed to define and design main works and all actions necessary for the installation of a wind turbine to reduce consumption in a house. This is a house in a rural zone with sufficient surface for the installation of the wind equipment, now has an installation of 230V, with a contract power of 5.5kW, the idea of the project is to combine the energy provided by the grid with the energy generated by a wind turbine, to reduce the electricity bill | es_ES |
dc.format.extent | 78 | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject.other | Ingeniería Técnica Industrial, esp. en Electricidad-Enginyeria Tècnica Industrial, esp. en Electricitat | es_ES |
dc.title | Installation of a wind turbine with interconnection to the grid and a single family home | es_ES |
dc.type | Proyecto/Trabajo fin de carrera/grado | es_ES |
dc.rights.accessRights | Cerrado | es_ES |
dc.description.bibliographicCitation | Morera Melo, B. (2012). Installation of a wind turbine with interconnection to the grid and a single family home. http://hdl.handle.net/10251/37098. | es_ES |