Ballesteros-Pérez, P., González-Cruz, M. C., Pastor-Ferrando, J. P., & Fernández-Diego, M. (2012). The iso-Score Curve Graph. A new tool for competitive bidding. Automation in Construction, 22, 481-490. doi:10.1016/j.autcon.2011.11.007
Ballesteros-Pérez, P., González-Cruz, M. C., & Cañavate-Grimal, A. (2012). Mathematical relationships between scoring parameters in capped tendering. International Journal of Project Management, 30(7), 850-862. doi:10.1016/j.ijproman.2012.01.008
Ballesteros-Pérez, P., González-Cruz, M. C., & Cañavate-Grimal, A. (2013). On competitive bidding: Scoring and position probability graphs. International Journal of Project Management, 31(3), 434-448. doi:10.1016/j.ijproman.2012.09.012
[+]
Ballesteros-Pérez, P., González-Cruz, M. C., Pastor-Ferrando, J. P., & Fernández-Diego, M. (2012). The iso-Score Curve Graph. A new tool for competitive bidding. Automation in Construction, 22, 481-490. doi:10.1016/j.autcon.2011.11.007
Ballesteros-Pérez, P., González-Cruz, M. C., & Cañavate-Grimal, A. (2012). Mathematical relationships between scoring parameters in capped tendering. International Journal of Project Management, 30(7), 850-862. doi:10.1016/j.ijproman.2012.01.008
Ballesteros-Pérez, P., González-Cruz, M. C., & Cañavate-Grimal, A. (2013). On competitive bidding: Scoring and position probability graphs. International Journal of Project Management, 31(3), 434-448. doi:10.1016/j.ijproman.2012.09.012
Ballesteros-Pérez, P., González-Cruz, M. C., Cañavate-Grimal, A., & Pellicer, E. (2013). Detecting abnormal and collusive bids in capped tendering. Automation in Construction, 31, 215-229. doi:10.1016/j.autcon.2012.11.036
Banki, M. T., Esmaeeli, B., & Ravanshadnia, M. (2009). The assessment of bidding strategy of Iranian construction firm. International Journal of Management Science and Engineering Management, 4(2), 153-160. doi:10.1080/17509653.2009.10671070
Carr, P. G. (2005). Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of Bidders. Journal of Construction Engineering and Management, 131(11), 1165-1172. doi:10.1061/(asce)0733-9364(2005)131:11(1165)
Chao, L., & Liou, C. (2007). Risk‐minimizing approach to bid‐cutting limit determination. Construction Management and Economics, 25(8), 835-843. doi:10.1080/01446190701393018
Deltas, G., & Engelbrecht-Wiggans, R. (2005). Naive Bidding. Management Science, 51(3), 328-338. doi:10.1287/mnsc.1040.0330
Dikmen, I., Birgonul, M. T., & Gur, A. K. (2007). A case-based decision support tool for bid mark-up estimation of international construction projects. Automation in Construction, 17(1), 30-44. doi:10.1016/j.autcon.2007.02.009
Drew, D., & Skitmore, M. (1997). The effect of contract type and size on competitiveness in bidding. Construction Management and Economics, 15(5), 469-489. doi:10.1080/014461997372836
Engelbrecht-Wiggans, R. (1980). State of the Art—Auctions and Bidding Models: A Survey. Management Science, 26(2), 119-142. doi:10.1287/mnsc.26.2.119
Engelbrecht-Wiggans, R. (1989). The Effect of Regret on Optimal Bidding in Auctions. Management Science, 35(6), 685-692. doi:10.1287/mnsc.35.6.685
Fayek, A. (1998). Competitive Bidding Strategy Model and Software System for Bid Preparation. Journal of Construction Engineering and Management, 124(1), 1-10. doi:10.1061/(asce)0733-9364(1998)124:1(1)
Friedman, L. (1956). A Competitive-Bidding Strategy. Operations Research, 4(1), 104-112. doi:10.1287/opre.4.1.104
Harstad, R. M., & Pekeč, A. S. (2008). Relevance to Practice and Auction Theory: A Memorial Essay for Michael Rothkopf. Interfaces, 38(5), 367-380. doi:10.1287/inte.1080.0396
Jiménez-Castillo, D., & Sánchez-Pérez, M. (2013). Nurturing employee market knowledge absorptive capacity through unified internal communication and integrated information technology. Information & Management, 50(2-3), 76-86. doi:10.1016/j.im.2013.01.001
Kayhan, V. O., McCart, J. A., & Bhattacherjee, A. (2010). Cross-bidding in simultaneous online auctions: Antecedents and consequences. Information & Management, 47(7-8), 325-332. doi:10.1016/j.im.2010.07.001
Lesca, N., Caron-Fasan, M.-L., & Falcy, S. (2012). How managers interpret scanning information. Information & Management, 49(2), 126-134. doi:10.1016/j.im.2012.01.004
Lo, W., Lin, C. L., & Yan, M. R. (2007). Contractor’s Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market. Journal of Construction Engineering and Management, 133(6), 409-416. doi:10.1061/(asce)0733-9364(2007)133:6(409)
McCaffer, R., & Pettitt, A. N. (1976). Distribution of Bids for Buildings and Roads Contracts. Journal of the Operational Research Society, 27(4), 835-843. doi:10.1057/jors.1976.173
Naoum, S. G. (1994). Critical Analysis of Time and Cost of Management and Traditional Contracts. Journal of Construction Engineering and Management, 120(4), 687-705. doi:10.1061/(asce)0733-9364(1994)120:4(687)
Näykki, P. (1976). On Optimal Bidding Strategies. Management Science, 23(2), 198-203. doi:10.1287/mnsc.23.2.198
Ngai, S. C., Drew, D. S., Lo, H. P., & Skitmore, M. (2002). A theoretical framework for determining the minimum number of bidders in construction bidding competitions. Construction Management and Economics, 20(6), 473-482. doi:10.1080/01446190210151041
Oo, B., Drew, D. S., & Runeson, G. (2010). Competitor analysis in construction bidding. Construction Management and Economics, 28(12), 1321-1329. doi:10.1080/01446193.2010.520721
Oo, B.-L., Drew, D. S., & Lo, H.-P. (2008). A comparison of contractors’ decision to bid behaviour according to different market environments. International Journal of Project Management, 26(4), 439-447. doi:10.1016/j.ijproman.2007.06.001
Oo, B.-L., Drew, D. S., & Lo, H.-P. (2008). Heterogeneous Approach to Modeling Contractors’ Decision-to-Bid Strategies. Journal of Construction Engineering and Management, 134(10), 766-775. doi:10.1061/(asce)0733-9364(2008)134:10(766)
Ravanshadnia, M., Rajaie, H., & Abbasian, H. R. (2010). Hybrid fuzzy MADM project-selection model for diversified construction companies. Canadian Journal of Civil Engineering, 37(8), 1082-1093. doi:10.1139/l10-048
Rothkopf, M. H., & Harstad, R. M. (1994). Modeling Competitive Bidding: A Critical Essay. Management Science, 40(3), 364-384. doi:10.1287/mnsc.40.3.364
Rothkopf, M. H. (1969). A Model of Rational Competitive Bidding. Management Science, 15(7), 362-373. doi:10.1287/mnsc.15.7.362
RUNESON, G., & SKITMORE, M. (1999). Tendering theory revisited. Construction Management and Economics, 17(3), 285-296. doi:10.1080/014461999371493
Skitmore, M., & Runeson, G. (2006). Bidding models: testing the stationarity assumption. Construction Management and Economics, 24(8), 791-803. doi:10.1080/01446190600680432
Skitmore, M. (1991). The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), 403-429. doi:10.1080/01446199100000032
Skitmore, M. (2002). Predicting the probability of winning sealed bid auctions: a comparison of models. Journal of the Operational Research Society, 53(1), 47-56. doi:10.1057/palgrave/jors/2601236
Skitmore, M. (2004). Predicting the probability of winning sealed bid auctions: the effects of outliers on bidding models. Construction Management and Economics, 22(1), 101-109. doi:10.1080/0144619042000186103
Skitmore, M. (2008). First and second price independent values sealed bid procurement auctions: some scalar equilibrium results. Construction Management and Economics, 26(8), 787-803. doi:10.1080/01446190802175678
Skitmore, M., Drew, D., & Ngai, S. (2001). Bid-Spread. Journal of Construction Engineering and Management, 127(2), 149-153. doi:10.1061/(asce)0733-9364(2001)127:2(149)
Skitmore, R. M., Pettitt, A. N., & McVinish, R. (2007). Gates’ Bidding Model. Journal of Construction Engineering and Management, 133(11), 855-863. doi:10.1061/(asce)0733-9364(2007)133:11(855)
Stark, R. M., & Rothkopf, M. H. (1979). Competitive Bidding: A Comprehensive Bibliography. Operations Research, 27(2), 364-390. doi:10.1287/opre.27.2.364
Watt, D. J., Kayis, B., & Willey, K. (2009). Identifying key factors in the evaluation of tenders for projects and services. International Journal of Project Management, 27(3), 250-260. doi:10.1016/j.ijproman.2008.03.002
Ye, K., Jiang, W., & Shen, L. (2008). Project competition intensity (PCI) in the construction market: a case study in China. Construction Management and Economics, 26(5), 463-470. doi:10.1080/01446190802036136
[-]