Mostrar el registro sencillo del ítem
dc.contributor.advisor | Montoya Villena, Rafael | es_ES |
dc.contributor.author | Estévez Yepes, Rubén | es_ES |
dc.date.accessioned | 2015-01-16T18:12:05Z | |
dc.date.available | 2015-01-16T18:12:05Z | |
dc.date.created | 2014-07-23 | |
dc.date.issued | 2015-01-16T18:12:05Z | |
dc.identifier.uri | http://hdl.handle.net/10251/46158 | |
dc.description.abstract | [ES] La actual subestación transformadora de reparto de energía eléctrica STR Santa Pola, de 66/20 kV, se encuentra en funcionamiento desde el año1978. Dada la demanda creciente dada en la zona en los últimos años, la fiabilidad del sistema y la necesidad de actualización de los sistemas existentes, se proyecta dicha instalación. Por lo anterior se hace necesario infraestructuras eléctricas que garanticen a futuro la adecuada atención del abastecimiento eléctrico a esta zona pasando por ampliar la actual STR Santa Pola dotándola de un sistema de 220 kV con su correspondiente transformación de 220/20 kV y 220/66 kV que permitirá, afrontar las necesidades de potencia y calidad. La alimentación al nuevo sistema de 220 kV a instalar quedará asegurada mediante una línea de doble circuito a 220 kV procedente de la subestación Saladas, asegurándose con esta tensión uno de los niveles de calidad y capacidad máximas hoy día. En la construcción y montaje de las nuevas instalaciones que, como consecuencia de la ampliación de la actual STR, dotarán la subestación en su nueva configuración, se utilizarán tecnologías de vanguardia (Gas Insulated System), lo que asegurará la máxima fiabilidad y calidad del servicio eléctrico a la zona con la mínima afección de superficie e impacto visual en el entorno. Las características técnicas eléctricas de la instalación proyectada son las siguientes: - Instalación interior en edificio blindado. - Potencia instalada proyectada: 275MVA. - Transformación de 220/20kV 50MVA(3), 220/66kV 125MVA(1). - Sistema de 220 kV tipo GIS(SF6) de doble barra de 8 posiciones. - Sistema de 66 kV tipo intemperie de simple barra de 4 posiciones. - Sistema de 20 kV tipo GIS(SF6) de doble barra de 30 posiciones. - Batería de condensadores. 2 unidades de 10,8MVAr. - Transformadores de servicios auxiliares. 2 TSA’s de 20/0,420-0,240 kV y 250 kVA. - Control y protecciones. Sistema de control integrado SIPCO con UCS(Remota). - Elementos auxiliares de control, mando, protecciones, servicios auxliliares, equipos de C.A. y C.C. y telecomunicaciones. - Instalaciones auxiliares, alumbrado, fuerza, anti-intrusismo, ventilación, contraincendios, etc. | es_ES |
dc.description.abstract | [EN] The current transformer substation of power-sharing STR Santa Pola, 66/20 kV, is in operation since the 1978. Given the growing demand given in the area in recent years, the reliability of the system and the need for upgrading existing, is projected this installation. Therefore it is necessary to electrical infrastructures that future consideration of the electric supply to this area to expand the current STR Santa Pola giving it a system of 220 kV with its corresponding transformation of 220/20 kV and 220/66 kV that will meet the needs of power and quality. Power to the new system from 220 kV to install will be secured through a line of doublecircuit 220 kV from substation Saladas, making sure with this one stress levels of maximum quality and capacity today. The construction and Assembly of new installations which, as a result of the expansion of the current STR, bestow the substation in its new configuration, advanced (Gas Insulated System) technologies, will be used which will ensure maximum reliability and quality of the electrical service to the area with the minimum condition of surface and visual impact on the environment. The electrical specifications of the projected installation are as follows: - Interior installation in building armored. - Projected installed capacity: 275MVA. - Transformation220/20kv 50MVA (3), 220/66kV 125MVA (1). - System of 220 kV type GIS (SF6) double bar 8 positions. - 66 kV system type simple bar 4-position weatherproof. - 20 kV system type GIS (SF6) double bar 30 positions. - Capacitor. 2 units of 10, 8MVAr. - Transformers of ancillary services. 2 TSA 20/0, 420-0, 240 kV and 250 kVA. - Control and protections. Integrated SIPCO with UCS (remote) control system. - Auxiliary elements control, remote control, protections, auxiliary services, C.A. and C.C. and telecommunications equipment. - Auxiliary instalations, lighting, force, anti-intruders, ventilation, fire, etc. | es_ES |
dc.format.extent | 262 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject.classification | INGENIERIA ELECTRICA | es_ES |
dc.subject.other | Grado en Ingeniería Eléctrica-Grau en Enginyeria Elèctrica | es_ES |
dc.title | Ampliación de la subestación eléctrica transformadora de 220/66/20 Kv denominada St Santa Pola | es_ES |
dc.type | Proyecto/Trabajo fin de carrera/grado | es_ES |
dc.rights.accessRights | Cerrado | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Politécnica Superior de Alcoy - Escola Politècnica Superior d'Alcoi | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería Eléctrica - Departament d'Enginyeria Elèctrica | es_ES |
dc.description.bibliographicCitation | Estévez Yepes, R. (2014). Ampliación de la subestación eléctrica transformadora de 220/66/20 Kv denominada St Santa Pola. http://hdl.handle.net/10251/46158. | es_ES |
dc.description.accrualMethod | Archivo delegado | es_ES |