Mostrar el registro completo del ítem
Hatami, S.; Ruiz García, R.; Andrés Romano, C. (2015). The Distributed Assembly Parallel Machine Scheduling Problem with eligibility constraints. International Journal of Production Management and Engineering. 3(1):13-23. https://doi.org/10.4995/ijpme.2015.3345
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/50356
Título: | The Distributed Assembly Parallel Machine Scheduling Problem with eligibility constraints | |
Autor: | Hatami, Sara | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] In this paper we jointly consider realistic scheduling extensions: First we study the distributed unrelated parallel machines problems by which there is a set of identical factories with parallel machines in a production ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | https://doi.org/10.4995/ijpme.2015.3345 | |
Código del Proyecto: |
|
|
Agradecimientos: |
The Spanish Ministry of Economy and Competitiveness supports Rubén Ruiz, under the project “RESULT-Realistic Extended
Scheduling Using Light Techniques” (No. DPI2012-36243-C02-01). Carlos Andrés is partially supported by ...[+]
|
|
Tipo: |
|