- -

A genetic algorithm for robust berth allocation and quay crane assignment.

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

A genetic algorithm for robust berth allocation and quay crane assignment.

Show full item record

Rodríguez Molins, M.; Ingolotti Hetter, LP.; Barber Sanchís, F.; Salido Gregorio, MA.; Sierra, MR.; Puente, J. (2014). A genetic algorithm for robust berth allocation and quay crane assignment. Progress in Artificial Intelligence. 2(4):177-192. doi:10.1007/s13748-014-0056-3

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/52303

Files in this item

Item Metadata

Title: A genetic algorithm for robust berth allocation and quay crane assignment.
Author:
UPV Unit: Universitat Politècnica de València. Departamento de Sistemas Informáticos y Computación - Departament de Sistemes Informàtics i Computació
Issued date:
Abstract:
[EN] Scheduling problems usually obtain the optimal solutions assuming that the environment is deterministic. However, actually the environment is dynamic and uncertain. Thus, the initial data could change and the initial ...[+]
Subjects: Scheduling , Planning , Robustness , Genetic algorithms , Metaheuristics , Multi-objective , Berthing allocation , Quay crane assignment
Copyrigths: Reserva de todos los derechos
Source:
Progress in Artificial Intelligence. (issn: 2192-6352 ) (eissn: 2192-6360 )
DOI: 10.1007/s13748-014-0056-3
Publisher version: http://link.springer.com/article/10.1007%2Fs13748-014-0056-3
Project ID: info:eu-repo/grantAgreement/EC/FP7/294931
Description: The final publication is available at Springer via http://dx.doi.org/10.1007/s13748-014-0056-3
Thanks:
This research was supported by the Spanish Government under research projects TIN2010-20976-C02-01 and TIN2010-20976-C02-02 (Min. de Ciencia e Innovación, Spain), the project PIRSES-GA-2011-294931 (FP7-PEOPLE-2011-IRSES) ...[+]
Type: Artículo

References

Bierwirth, C., Meisel, F.: A survey of berth allocation and quay crane scheduling problems in container terminals. Eur. J. Oper. Res. 202, 615–627 (2010)

Czyzak, P., Jaszkiewicz, A.: Pareto simulated annealing-a metaheuristic technique for multiple-objective combinatorial optimization. J. Multi-criteria Decis. Anal. 7, 34–47 (1998)

Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: A fast and elitist multiobjective genetic algorithm: Nsga-ii. Evol. Comput. IEEE Trans. 6(2), 182–197 (2002) [+]
Bierwirth, C., Meisel, F.: A survey of berth allocation and quay crane scheduling problems in container terminals. Eur. J. Oper. Res. 202, 615–627 (2010)

Czyzak, P., Jaszkiewicz, A.: Pareto simulated annealing-a metaheuristic technique for multiple-objective combinatorial optimization. J. Multi-criteria Decis. Anal. 7, 34–47 (1998)

Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: A fast and elitist multiobjective genetic algorithm: Nsga-ii. Evol. Comput. IEEE Trans. 6(2), 182–197 (2002)

Derrac, J., García, S., Molina, D., Herrera, F.: A practical tutorial on the use of nonparametric statistical tests as mehodology for comparing evolutionary and swarm intelligence algorithms. Swarm Evol. Comput. 1(1), 3–18 (2011)

Du, Y., Xu, Y., Chen, Q.: A feedback procedure for robust berth allocation with stochastic vessel delays. In: Intelligent control and automation (WCICA), 2010 8th World Congress on, pp. 2210–2215. IEEE (2010)

Giallombardo, G., Moccia, L., Salani, M., Vacca, I.: Modeling and solving the tactical berth allocation problem. Transp. Res. Part B: Methodol. 44(2), 232–245 (2010)

Goldberg, D.: Genetic Algorithms in Search, Optimization and Machine Learning. Addison-Wesley, London (1989)

Gonzalez-Rodriguez, I., Vela, C., Puente, J.: A memetic approach to fuzzy job shop based on expectation model. In: Proceedings of IEEE International Conference on fuzzy systems, FUZZ-IEEE2007, pp. 692–697. IEEE (2007)

González-Rodríguez, I., Vela, C., Puente, J.: A genetic solution based on lexicographical goal programming for a multiobjective job shop with uncertainty. J. Intell. Manuf. 21(1), 65–73 (2010)

Han, X.l., Lu, Z.q., Xi, L.f.: A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time. Eur. J. Oper. Res. 207(3), 1327–1340 (2010)

Hendriks, M., Laumanns, M., Lefeber, E., Udding, J.T.: Robust cyclic berth planning of container vessels. OR Spectr. 32(3), 501–517 (2010)

Imai, A., Chen, H., Nishimura, E., Papadimitriou, S.: The simultaneous berth and quay crane allocation problem. Transp. Res. Part E: Logist. Transp. Rev. 44(5), 900–920 (2008)

Kim, K., Moon, K.: Berth scheduling by simulated annealing. Transp. Res. Part B: Methodol. 37(6), 541–560 (2003)

Kim, M., Hiroyasu, T., Miki, M., Watanabe, S.: Spea2+: Improving the Performance of the Strength Pareto Evolutionary Algorithm 2. In: Parallel problem solving from nature-PPSN VIII, pp. 742–751. Springer, New York (2004)

Liang, C., Guo, J., Yang, Y.: Multi-objective hybrid genetic algorithm for quay crane dynamic assignment in berth allocation planning. J. Intell. Manuf. 22, 471–479 (2011)

Lim, A.: The berth planning problem. Oper. Res. Lett. 22(2–3), 105–110 (1998)

Mezura-Montes, E., Coello Coello, C.A.: Constraint-handling in nature-inspired numerical optimization: past, present and future. Swarm Evol. Comput. 1(4), 173–194 (2011)

Michalewicz, Z.: Genetic Algorithms + Data Structures = Evolution Programs, third, revised and extended. Springer, New York (1996)

Park, Y., Kim, K.: A scheduling method for berth and quay cranes. OR Spectr. 25(1), 1–23 (2003)

Salido, M.A., Rodriguez-Molins, M., Barber, F.: Integrated intelligent techniques for remarshaling and berthing in maritime terminals. Adv. Eng. Inf. 25(3), 435–451 (2011)

Sheskin, D.: Handbook of Parametric and Nonparametric Statistical Procedures. Chapman & Hall/CRC, London (2004)

Stahlbock, R., Voß, S.: Operations research at container terminals: a literature update. OR Spectr. 30(1), 1–52 (2008)

Xu, Y., Chen, Q., Quan, X.: Robust berth scheduling with uncertain vessel delay and handling time. Ann. Oper. Res. 192(1), 123–140 (2012)

Zhang, C., Zheng, L., Zhang, Z., Shi, L., Armstrong, A.: The allocation of berths and quay cranes by using a sub-gradient optimization technique. Computers Ind. Eng. 58(1), 40–50 (2010)

Zhen, L., Chang, D.F.: A bi-objective model for robust berth allocation scheduling. Computers Ind. Eng. 63(1), 262–273 (2012)

[-]

This item appears in the following Collection(s)

Show full item record