Mostrar el registro sencillo del ítem
dc.contributor.author | Real Herráiz, Julia Irene | es_ES |
dc.contributor.author | Montalbán Domingo, María Laura | es_ES |
dc.contributor.author | Real, T. | es_ES |
dc.contributor.author | Puig, V. | es_ES |
dc.date.accessioned | 2015-11-03T12:33:05Z | |
dc.date.available | 2015-11-03T12:33:05Z | |
dc.date.issued | 2012 | |
dc.identifier.issn | 1392-8716 | |
dc.identifier.uri | http://hdl.handle.net/10251/56930 | |
dc.description.abstract | Nowadays, metropolitan railway systems are in great demand, so they offer high-frequency services for the most part of the day. Therefore there are only a few hours during night available to carry out maintenance tasks. This research develops a system that records the vertical accelerations undergone by the bogies of in-service railway vehicles. As accelerations are measured during regular services of trains, no additional vehicles or personnel are needed and maintenance planning is optimized. Accelerations are processed to obtain the vertical track alignment in order to determine whether the track needs to be repaired. The developed system has been validated by comparing its results to the actual state of the track provided by a track monitoring trolley. Comparison is made both by graphical and statistical methods. Real data come from measurements taken on Line 1 of the Alicante tram network (Spain). This paper presents the data collecting procedure, the mathematical processing of the accelerations and the analysis of the track condition. | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Research Center of the Public Institution "Vibromechanika" | es_ES |
dc.relation.ispartof | Journal of Vibroengineering | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Axle-box | es_ES |
dc.subject | Accelerometer | es_ES |
dc.subject | Maintenance | es_ES |
dc.subject | Track monitoring | es_ES |
dc.subject.classification | INGENIERIA E INFRAESTRUCTURA DE LOS TRANSPORTES | es_ES |
dc.title | Development of a system to obtain vertical track geometry measuring axle-box accelerations from in-service trains | es_ES |
dc.type | Artículo | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería e Infraestructura de los Transportes - Departament d'Enginyeria i Infraestructura dels Transports | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Instituto Universitario de Matemática Multidisciplinar - Institut Universitari de Matemàtica Multidisciplinària | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Mecánica de los Medios Continuos y Teoría de Estructuras - Departament de Mecànica dels Medis Continus i Teoria d'Estructures | es_ES |
dc.description.bibliographicCitation | Real Herráiz, JI.; Montalban Domingo, ML.; Real, T.; Puig, V. (2012). Development of a system to obtain vertical track geometry measuring axle-box accelerations from in-service trains. Journal of Vibroengineering. 14(2):813-826. http://hdl.handle.net/10251/56930 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | http://jvejournals.com/browse-jve | es_ES |
dc.description.upvformatpinicio | 813 | es_ES |
dc.description.upvformatpfin | 826 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 14 | es_ES |
dc.description.issue | 2 | es_ES |
dc.relation.senia | 231098 | es_ES |