Mostrar el registro sencillo del ítem
dc.contributor.author | ALSHUBBAK, ALI | es_ES |
dc.contributor.author | Pellicer Armiñana, Eugenio | es_ES |
dc.contributor.author | Catalá Alís, Joaquín | es_ES |
dc.contributor.author | Teixeira, Jose M. | es_ES |
dc.date.accessioned | 2015-12-21T16:12:24Z | |
dc.date.available | 2015-12-21T16:12:24Z | |
dc.date.issued | 2015-11 | |
dc.identifier.issn | 1392-3730 | |
dc.identifier.uri | http://hdl.handle.net/10251/59106 | |
dc.description.abstract | Building life cycle is a process which covers not only the construction phase but also the feasibility, the design and the operation phases. Identifying the owner s needs in all phases of this process is of paramount importance for achieving satisfactory results for the building project. Additionally, the owner s needs should be fulfilled by the work scope of every stakeholder involved in the project. Nevertheless, these needs are not always adequately considered in building projects. Thus, the purpose of the research reported in this paper has been to develop a model that allows for the identification of the owner s needs in all phases of the building life cycle. The article presents a six level classification system for the information required in the project and a two-dimensional model that maps the life cycle and the logical actions to be undertaken in each phase. The model has been corroborated and improved by applying the Delphi technique to a panel of ten experts in two rounds. The practical use of the model is through the systematic application of a series of questionnaires built upon the information classification system for determining the owner s needs. The paper details the operation phase of the model as an illustrative example and a case study on a residential building project of twelve apartments in Spain. | es_ES |
dc.description.sponsorship | This research was partially funded by the J. Gomez-Cerezo Foundation (Spain) and the Spanish Ministry of Infrastructure (grant 2004-36). The authors thank the ten experts who participated in the Delphi study and Dr Debra Westall who thoroughly revised the text. | en_EN |
dc.language | Inglés | es_ES |
dc.publisher | Taylor & Francis: STM, Behavioural Science and Public Health Titles | es_ES |
dc.relation.ispartof | Journal of Civil Engineering and Management | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Building, information system, life cycle, need, owner, requirement | es_ES |
dc.subject.classification | PROYECTOS DE INGENIERIA | es_ES |
dc.title | A model for identifying owner's needs in the building life cycle | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.3846/13923730.2015.1027257 | |
dc.relation.projectID | info:eu-repo/grantAgreement/MFOM//2004%2F35/ES/Optimizacion Euristica Economica de Marcos de Paso de Carretera y Ferrocarril/ | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil | es_ES |
dc.description.bibliographicCitation | Alshubbak, A.; Pellicer, E.; Catalá Alís, J.; Teixeira, JM. (2015). A model for identifying owner's needs in the building life cycle. Journal of Civil Engineering and Management. 21(8):1046-1060. doi:10.3846/13923730.2015.1027257 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | http://dx.doi.org/10.3846/13923730.2015.1027257 | es_ES |
dc.description.upvformatpinicio | 1046 | es_ES |
dc.description.upvformatpfin | 1060 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 21 | es_ES |
dc.description.issue | 8 | es_ES |
dc.relation.senia | 297544 | es_ES |
dc.contributor.funder | Fundación J.A. Gómez Cerezo | es_ES |
dc.contributor.funder | Ministerio de Fomento |