- -

Effects in service of the staggered construction of cable-stayed bridges built on temporary supports

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

Effects in service of the staggered construction of cable-stayed bridges built on temporary supports

Show full item record

Lozano Galant, JA.; Paya-Zaforteza, I.; Turmo Coderque, J. (2015). Effects in service of the staggered construction of cable-stayed bridges built on temporary supports. Baltic Journal of Road and Bridge Engineering. 10(3):247-254. doi:10.3846/bjrbe.2015.31

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/62694

Files in this item

Item Metadata

Title: Effects in service of the staggered construction of cable-stayed bridges built on temporary supports
Author:
UPV Unit: Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil
Issued date:
Abstract:
Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important ...[+]
Subjects: Cable-stayed bridge , Temporary Supports , Construction Joint , Optimization , Objective Service Stage
Copyrigths: Reserva de todos los derechos
Source:
Baltic Journal of Road and Bridge Engineering. (issn: 1822-427X )
DOI: 10.3846/bjrbe.2015.31
Publisher:
"Technika", Vilnius Gediminas Technical University,
Publisher version: http://dx.doi.org/10.3846/bjrbe.2015.31
Thanks:
The authors thank the Spanish Ministerio de Economia y Competitividad and the FEDER funds for the funding provided through the research grant BIA2013-47290-R directed by Jose Turmo.
Type: Artículo

This item appears in the following Collection(s)

Show full item record