Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Hatami, Sara es_ES
dc.contributor.author Ruiz García, Rubén es_ES
dc.contributor.author Andrés Romano, Carlos es_ES
dc.date.accessioned 2016-04-28T16:40:05Z
dc.date.available 2016-04-28T16:40:05Z
dc.date.issued 2015-11
dc.identifier.issn 0925-5273
dc.identifier.uri http://hdl.handle.net/10251/63118
dc.description.abstract We consider a Distributed Assembly Permutation Flowshop Scheduling Problem with sequence dependent setup times and the objective of makespan minimization. The problem consists of two stages, production and assembly. The first stage comprises f identical factories, where each factory is a flowshop that produces jobs which are later assembled into final products through an identical assembly program in a second assembly stage made by a single machine. Both stages have sequence dependent setup times. This-is a realistic and complex problem and therefore, we propose two simple heuristics and two metaheuristics to solve it. A complete calibration and analysis through a Design Of Experiments (DOE) approach is carried out. In the process, important knowledge of the studied problem is obtained as well as some simplifications for the powerful Iterated Greedy methodology which results in a simpler approach with less parameters. Finally, the performance of the proposed methods is compared through extensive computational and statistical experiments. (C) 2015 Elsevier B.V. All rights reserved. es_ES
dc.description.sponsorship Ruben Ruiz is partially supported by the Spanish Ministry of Economy and Competitiveness, under the project "RESULT - Realistic Extended Scheduling Using Light Techniques" with reference DPI2012-36243-C02-01 co-financed by the European Union and FEDER funds and by the Universitat Politecnica de Valencia, for the project MRPIV with reference PAID/2012/202. Carlos Andres-Romano is partially supported by the Spanish Ministry of Economy and Competitiveness (TRA2013-48180-C3-3-P). en_EN
dc.language Inglés es_ES
dc.publisher Elsevier es_ES
dc.relation.ispartof International Journal of Production Economics es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Distributed assembly permutation flowshop es_ES
dc.subject Variable neighborhood descen es_ES
dc.subject Iterated greedy es_ES
dc.subject Sequence dependent setup times es_ES
dc.subject.classification ESTADISTICA E INVESTIGACION OPERATIVA es_ES
dc.title Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.1016/j.ijpe.2015.07.027
dc.relation.projectID info:eu-repo/grantAgreement/MINECO//DPI2012-36243-C02-01/ES/REALISTIC EXTENDED SCHEDULING USING LIGHT TECHNIQUES/ es_ES
dc.relation.projectID info:eu-repo/grantAgreement/UPV//PAID%2F2012%2F202/ es_ES
dc.relation.projectID info:eu-repo/grantAgreement/MINECO//TRA2013-48180-C3-3-P/ES/SOLUCIONES COMPUTACIONALES PARA LA TOMA DE DECISIONES VINCULADAS A LA COOPERACION HORIZONTAL EN EL TRANSPORTE Y LA LOGISTICA/ es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Estadística e Investigación Operativa Aplicadas y Calidad - Departament d'Estadística i Investigació Operativa Aplicades i Qualitat es_ES
dc.description.bibliographicCitation Hatami, S.; Ruiz García, R.; Andrés Romano, C. (2015). Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times. International Journal of Production Economics. 169:76-88. https://doi.org/10.1016/j.ijpe.2015.07.027 es_ES
dc.description.accrualMethod S es_ES
dc.relation.publisherversion http://dx.doi.org/10.1016/j.ijpe.2015.07.027 es_ES
dc.description.upvformatpinicio 76 es_ES
dc.description.upvformatpfin 88 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 169 es_ES
dc.relation.senia 308908 es_ES
dc.contributor.funder Ministerio de Economía y Competitividad es_ES
dc.contributor.funder European Commission es_ES
dc.contributor.funder Universitat Politècnica de València es_ES
dc.contributor.funder European Regional Development Fund es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem