Mostrar el registro completo del ítem
Vallada Regalado, E.; Ruiz García, R.; Framinan, JM. (2015). New hard benchmark for flowshop scheduling problems minimising makespan. European Journal of Operational Research. 240(3):666-677. https://doi.org/10.1016/j.ejor.2014.07.033
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/63119
Título: | New hard benchmark for flowshop scheduling problems minimising makespan | |
Autor: | Framinan, Jose M. | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] In this work a new benchmark of hard instances for the permutation flowshop scheduling problem with
the objective of minimising the makespan is proposed. The new benchmark consists of 240 large instances and 240 small ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reserva de todos los derechos | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | http://dx.doi.org/10.1016/j.ejor.2014.07.033 | |
Código del Proyecto: |
|
|
Agradecimientos: |
Eva Vallada and Ruben Ruiz are partially supported by the Spanish Ministry of Science and Innovation, under the project "RESULT - Realistic Extended Scheduling Using Light Techniques" with reference DPI2012-36243-C02-01 ...[+]
|
|
Tipo: |
|