dc.contributor.author | Gálvez, Edelmira D. | es_ES |
dc.contributor.author | Capuz Rizo, Salvador Fernando | es_ES |
dc.contributor.author | Ordieres Mere, Joaquin Bienvenido | es_ES |
dc.date.accessioned | 2016-05-05T11:22:27Z | |
dc.date.available | 2016-05-05T11:22:27Z | |
dc.date.issued | 2012 | |
dc.identifier.issn | 0716-8756 | |
dc.identifier.uri | http://hdl.handle.net/10251/63694 | |
dc.description.abstract | A study about the effect of uncertainty on the planning of project activities using the dependency structure matrix (DSM) and grey theory. The grey theory is applied to represent the uncertainty in estimating project extension. As a result, the equations to determine the grey conventional time, the grey normal time and the grey normal time with natural overlap were developed. Based on the case studies it is concluded that the application of the grey theory to the DSM allows: considering the uncertainty in project planning; ii) identifying the most critical stages; iii) analyzing the effect of the uncertainty of each stage in the total project duration; and iv) comparing different programming strategies. | es_ES |
dc.description.abstract | [ES] Se presenta un estudio sobre el efecto de la incertidumbre en la programación de actividades de proyectos usando la matriz de estructura dependiente (DSM) y la teoría gris. Se aplica la teoría gris para representar la incertidumbre en la estimación del tiempo de duración de proyectos, desarrollando las ecuaciones necesarias para determinar el tiempo convencional gris, el tiempo normal gris y el tiempo normal gris con superposición natural. Con base en el estudio se concluye que la aplicación de la teoría de gris a la DSM permite: i) considerar la incertidumbre en la programación del proyecto; ii) identificar las etapas más críticas; iii) analizar el efecto de la incertidumbre de cada etapa en la duración total del proyecto; y iv) comparar diferentes estrategias de programación. | es_ES |
dc.language | Español | es_ES |
dc.publisher | Centro de Información Tecnológica | es_ES |
dc.relation.ispartof | Información Tecnológica | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | DSM | es_ES |
dc.subject | Grey theory | es_ES |
dc.subject | Project managing | es_ES |
dc.subject | Project scheduling | es_ES |
dc.subject | Uncertainty | es_ES |
dc.subject | Energy resources | es_ES |
dc.subject | Geotechnical engineering | es_ES |
dc.subject | Uncertainty analysis | es_ES |
dc.subject | Planificación de proyectos | es_ES |
dc.subject | Administración de proyectos | es_ES |
dc.subject | Teoría gris | es_ES |
dc.subject | Incertidumbre | es_ES |
dc.title | Estudio de la incertidumbre en la programación de actividades usando la matriz de estructura dependiente | es_ES |
dc.title.alternative | Study of the uncertainty of task programming using the dependency structure matrix | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.4067/S0718-07642012000100004 | |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Proyectos de Ingeniería - Departament de Projectes d'Enginyeria | es_ES |
dc.description.bibliographicCitation | Gálvez, ED.; Capuz Rizo, SF.; Ordieres Mere, JB. (2012). Estudio de la incertidumbre en la programación de actividades usando la matriz de estructura dependiente. Información Tecnológica. 23(1):19-34. doi:10.4067/S0718-07642012000100004 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | http://dx.doi.org/10.4067/S0718-07642012000100004 | es_ES |
dc.description.upvformatpinicio | 19 | es_ES |
dc.description.upvformatpfin | 34 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 23 | es_ES |
dc.description.issue | 1 | es_ES |
dc.relation.senia | 219854 | es_ES |