Mostrar el registro completo del ítem
Vazquez, M.; Mihailetchi, V.; Connolly, JP.; Cubero García, OJ.; Daly, G.; Halm, A.; Kopecek, R.... (2012). Cost Model Developed in European Project LIMA. Energy Procedia. 27:646-651. https://doi.org/10.1016/j.egypro.2012.07.123
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/69175
Título: | Cost Model Developed in European Project LIMA | |
Autor: | Vazquez, M.A. Mihailetchi, V.D. Connolly, James Patrick Cubero García, Oscar Jesús Daly, G. Halm, A. Kopecek, R. Pérez Mayor, Ester Pucker, G Sánchez Plaza, Guillermo . Pavesie, L. | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] In this paper we show the results of the cost model developed in LIMA project (Seventh Framework Programme, CN: 248909). The LIMA project is entitled "Improve photovoltaic efficiency by applying novel effects at the ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reserva de todos los derechos | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | http://dx.doi.org/10.1016/j.egypro.2012.07.123 | |
Título del congreso: |
|
|
Lugar del congreso: |
|
|
Fecha congreso: |
|
|
Código del Proyecto: |
|
|
Agradecimientos: |
|
|
Tipo: |
|