- -

Proyecto de estructura portante, instalación de climatización y ventilación para un centro de educación secundaria en San Fulgencio, Alicante. Con 4 plantas sobre rasante, sótano y gimnasio

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Proyecto de estructura portante, instalación de climatización y ventilación para un centro de educación secundaria en San Fulgencio, Alicante. Con 4 plantas sobre rasante, sótano y gimnasio

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Saura Arnau, Héctor es_ES
dc.contributor.advisor Soto Francés, Víctor Manuel es_ES
dc.contributor.author Mercado González, Manuel Jesús es_ES
dc.date.accessioned 2016-11-04T08:40:15Z
dc.date.available 2016-11-04T08:40:15Z
dc.date.created 2016-09-29
dc.date.issued 2016-11-04 es_ES
dc.identifier.uri http://hdl.handle.net/10251/73274
dc.description.abstract [ES] El presente proyecto define y calcula la estructura portante y la instalación de climatización de un centro de Educación Secundaria Obligatoria en San Fulgencio, Alicante. El edificio se encuentra emplazado ocupando la totalidad de la manzana. Consta de una planta bajo rasante y cuatro plantas sobre ella, llegado a una altura total de 15 metros sobre rasante. La estructura se realiza de tipo mixto, siendo los pilares de hormigón desde la cimentación hasta el primer forjado, (cota +0.38m), garantizando así la durabilidad de los mismos, desde el forjado 1 se establecen pilares metálicos, para integrarlos en el diseño del edificio. Todos los forjados se llevan a cabo con forjados reticulares de canto 35cm, siendo estos sufrientes para salvar las luces entre pilares, a excepción de una zona de cubierta con luces de 10m que se solventa con placas aligeradas. Se ha proyectado la instalación de climatización y ventilación del edificio. Dado el uso del edificio y la legislación vigente, solo se establece calefacción como medio de climatización. La ventilación se llevará a cabo mediantes unidades de tratamiento de aire colocadas en cubierta, mientras que la climatización se realizará por dos medios, el primero, climatizando el aire primario (calefacción), el segundo, mediante radiadores. es_ES
dc.description.abstract [EN] The aim of this project is to design and calculate the supporting structure and the HVAC installation of a Compulsory Secondary school located in San Fulgencio, Alicante. The building takes up the whole block. It consists of a floor below ground level and four floors above it, reaching a total height of fifteen metres above the ground floor. The structure is a mixed type, erected on slam foundation with concrete pillars from the foundation to the first floor slab (elevation +0.38m) to ensure their durability, and with metal pillars from the first floor slab to integrate them into the building design. All the floor slabs use waffle slabs which have a depth of 35cm, being enough to bridge the span between pillars, with the exception of a covered area with ten metres span which is resolved with voided slabs. This project also includes the building HVAC installation. Taking into consideration the use of the building and the regulations in force, heating is the only HVAC system in the building. Ventilation will be carried out by means of air handling units located on the roof, while heating will be achieved in two different ways: heating the primary air coming into the rooms or, on the other hand, by means of radiators. es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Instalación es_ES
dc.subject Climatización es_ES
dc.subject Ventilación es_ES
dc.subject Centro Educación Secundaria es_ES
dc.subject.classification MAQUINAS Y MOTORES TERMICOS es_ES
dc.subject.classification INGENIERIA DE LA CONSTRUCCION es_ES
dc.subject.other Máster Universitario en Construcciones e Instalaciones Industriales-Màster Universitari en Construccions i Instal·Lacions Industrials es_ES
dc.title Proyecto de estructura portante, instalación de climatización y ventilación para un centro de educación secundaria en San Fulgencio, Alicante. Con 4 plantas sobre rasante, sótano y gimnasio es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Termodinámica Aplicada - Departament de Termodinàmica Aplicada es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials es_ES
dc.description.bibliographicCitation Mercado González, MJ. (2016). Proyecto de estructura portante, instalación de climatización y ventilación para un centro de educación secundaria en San Fulgencio, Alicante. Con 4 plantas sobre rasante, sótano y gimnasio. http://hdl.handle.net/10251/73274. es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\52007 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem