Mostrar el registro sencillo del ítem
dc.contributor.author | Giner-Bosch, Vicent | es_ES |
dc.contributor.author | San Matías Izquierdo, Susana | es_ES |
dc.contributor.author | Clemente-Císcar, Mónica | es_ES |
dc.contributor.author | Carrión García, Andrés | es_ES |
dc.date.accessioned | 2017-01-04T10:30:41Z | |
dc.date.available | 2017-01-04T10:30:41Z | |
dc.date.issued | 2016-03 | |
dc.identifier.issn | 0748-8017 | |
dc.identifier.uri | http://hdl.handle.net/10251/76326 | |
dc.description.abstract | [EN] Pre-control is a quality tool for quick set-up approvals, especially used in short-run processes. It is based on specifications instead of on the natural variability of the process and uses cumulative counts in order to yield a conclusion. Its main drawbacks are a high false alarm rate and a low power to detect process deviations, under certain circumstances. These issues can be addressed by making the technique more flexible, as shown in previous works. In this paper, we introduce a Mathematical Programming approach in order to optimally determine the value of the pre-control parameters, so that it can meet the user s requirements while minimizing the sample size of the technique as much as possible. We propose and develop a mathematical model for optimal pre-control and perform some numerical experiments in order to show its effectiveness. | es_ES |
dc.description.sponsorship | The research by V. Giner-Bosch and M. Clemente-Ciscar was partially supported by the Ministerio de Ciencia e Innovacion of Spain under grant no. MTM2013-45381-P. | en_EN |
dc.language | Inglés | es_ES |
dc.publisher | Wiley | es_ES |
dc.relation.ispartof | Quality and Reliability Engineering International | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Pre-control | es_ES |
dc.subject | Set-up approval | es_ES |
dc.subject | Process capability | es_ES |
dc.subject | Mixed-Integer Nonlinear Programming | es_ES |
dc.subject | Optimization | es_ES |
dc.subject.classification | ESTADISTICA E INVESTIGACION OPERATIVA | es_ES |
dc.title | Optimal design of pre-control plans | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.1002/qre.1777 | |
dc.relation.projectID | info:eu-repo/grantAgreement/MINECO//MTM2013-45381-P/ES/DIFERENCIAS DE LONGEVIDAD EN LA UNION EUROPEA: APLICACION DE NUEVOS METODOS PARA SU EVALUACION Y ANALISIS/ | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Facultad de Administración y Dirección de Empresas - Facultat d'Administració i Direcció d'Empreses | es_ES |
dc.description.bibliographicCitation | Giner-Bosch, V.; San Matías Izquierdo, S.; Clemente-Císcar, M.; Carrión García, A. (2016). Optimal design of pre-control plans. Quality and Reliability Engineering International. 32(2):623-634. https://doi.org/10.1002/qre.1777 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | http://dx.doi. org/10.1002/qre.1777 | es_ES |
dc.description.upvformatpinicio | 623 | es_ES |
dc.description.upvformatpfin | 634 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 32 | es_ES |
dc.description.issue | 2 | es_ES |
dc.relation.senia | 280176 | es_ES |
dc.identifier.eissn | 1099-1638 | |
dc.contributor.funder | Ministerio de Economía y Competitividad |