Mostrar el registro sencillo del ítem
dc.contributor.advisor | Mula Bru, Josefa | es_ES |
dc.contributor.author | Cañas Sánchez, Héctor Enrique | es_ES |
dc.date.accessioned | 2017-11-08T11:14:55Z | |
dc.date.available | 2017-11-08T11:14:55Z | |
dc.date.created | 2017-09-29 | |
dc.date.issued | 2017-11-08 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/90729 | |
dc.description.abstract | In this work, a linear programming model is presented with the aim to determine optimal decisions for the purchasing of materials used in concrete manufacturing and to obtain optimal production orders considering lead times of the materials and capacity constraints of the available resources. As case of study a business from the concrete sector is used and real inventory data of the different materials needed for the concrete mix and its bill of materials (BOM) needed for the material requirement planning (MRP) are used to validate the model. As results of the model optimal purchasing periods and optimal production orders are obtained. | es_ES |
dc.description.abstract | En este Trabajo de Fin de Máster se presenta un modelo de programación lineal con el objetivo de determinar decisiones óptimas de compras de los materiales utilizados para la fabricación de hormigón y las órdenes de fabricación tomando en consideración tiempos de suministro de los distintos materiales y las restricciones de capacidad de los recursos disponibles. Se utiliza como caso de estudio una empresa del sector del hormigón y se usan datos de inventarios reales de los diferentes materiales necesarios para fabricar la mezcla y su lista de materiales (BOM) necesarios para la planificación de requerimiento de materiales (MRP). Como resultado del modelo se obtienen los periodos óptimos en los que se deben comprar los materiales y las órdenes de fabricación óptimas. | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Optimisation | es_ES |
dc.subject | concrete | es_ES |
dc.subject | purchasing | es_ES |
dc.subject | production planning. | es_ES |
dc.subject | Optimización | es_ES |
dc.subject | MRP | es_ES |
dc.subject | BOM | es_ES |
dc.subject | hormigón | es_ES |
dc.subject | compras | es_ES |
dc.subject | planificación de producción. | es_ES |
dc.subject.classification | ORGANIZACION DE EMPRESAS | es_ES |
dc.subject.other | Máster Universitario en Ingeniería Industrial-Màster Universitari en Enginyeria Industrial | es_ES |
dc.title | Modelo de optimización para el problema de planificación de compras utilizando MRP con restricciones de capacidad en el sector del hormigón | es_ES |
dc.type | Tesis de máster | es_ES |
dc.rights.accessRights | Cerrado | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros Industriales - Escola Tècnica Superior d'Enginyers Industrials | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Organización de Empresas - Departament d'Organització d'Empreses | es_ES |
dc.description.bibliographicCitation | Cañas Sánchez, HE. (2017). Modelo de optimización para el problema de planificación de compras utilizando MRP con restricciones de capacidad en el sector del hormigón. http://hdl.handle.net/10251/90729 | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\75536 | es_ES |