Mostrar el registro sencillo del ítem
dc.contributor.author | Alvarado Vargas, Yezid Alexander | es_ES |
dc.contributor.author | Gasch, Isabel | es_ES |
dc.contributor.author | Calderón García, Pedro Antonio | es_ES |
dc.contributor.author | Torres Górriz, Benjamín | es_ES |
dc.date.accessioned | 2017-12-04T09:37:06Z | |
dc.date.available | 2017-12-04T09:37:06Z | |
dc.date.issued | 2016 | es_ES |
dc.identifier.issn | 0716-2952 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/91867 | |
dc.description.abstract | [EN] The aim of this paper is to define alternative construction processes for a building with reinforced concrete slab floors, thereby estimating which ones are most beneficial in terms of their execution time and cost. Three alternatives were proposed to solve the deadlines of the construction process: Shoring and Striking; Shoring, Clearing and Striking; and Shoring, Reshoring and Striking, considering 2, 3 and 4 consecutive shored floors. In order to evaluate what processes are valid, first it is necessary to calculate the loads during the construction process using the New Simplified Procedure and subsequently check whether or not the striking condition is fulfilled in each of the construction operations. Regarding the studied building, the feasible construction processes were: Shoring, Clearing and Striking with 3 and 4 consecutive shored floors | es_ES |
dc.description.abstract | [ES] El objetivo del presente trabajo es definir diferentes alternativas de procesos constructivos, estimando cuáles resultan ser las más beneficiosas respecto a su plazo de ejecución y su coste, para un edificio de forjados de losa maciza de hormigón armado. Para resolver los plazos de ejecución se plantearon tres alternativas del proceso constructivo: Cimbrado y Descimbrado; Cimbrado, Clareado y Descimbrado; y Cimbrado, Recimbrado y Descimbrado, considerado 2, 3 y 4 plantas consecutivas apuntaladas. Para evaluar qué procesos son válidos, primero se calculan las cargas que se presentan durante el proceso constructivo mediante el Nuevo Procedimiento Simplificado y posteriormente se comprueba si se cumple o no, en cada una de las operaciones constructivas, la condición de descimbrado. Para el edificio objeto de estudio se han obtenido como procesos viables económica y técnicamente los procesos constructivos de Cimbrado, Clareado y Descimbrado con 3 y 4 plantas cimbradas. | es_ES |
dc.language | Español | es_ES |
dc.publisher | Pontificia Universidad Católica de Chile | es_ES |
dc.relation.ispartof | Revista Ingeniería de Construcción | es_ES |
dc.rights | Reconocimiento (by) | es_ES |
dc.subject | Transmisión de cargas | es_ES |
dc.subject | Clareado | es_ES |
dc.subject | Proceso constructivo | es_ES |
dc.subject | puntales | es_ES |
dc.subject | Nuevo Procedimiento Simplificado Load transmission | es_ES |
dc.subject | Clearing | es_ES |
dc.subject | Construction process | es_ES |
dc.subject | Shores | es_ES |
dc.subject | New Simplified Procedure | es_ES |
dc.subject.classification | INGENIERIA DE LA CONSTRUCCION | es_ES |
dc.subject.classification | MECANICA DE LOS MEDIOS CONTINUOS Y TEORIA DE ESTRUCTURAS | es_ES |
dc.title | Estudio técnico económico de alternativas del proceso de cimbrado y descimbrado en la construcción de un edificio de forjados de losa maciza de hormigón armado | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.4067/S0718-50732016000200005 | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Mecánica de los Medios Continuos y Teoría de Estructuras - Departament de Mecànica dels Medis Continus i Teoria d'Estructures | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Instituto de Ciencia y Tecnología del Hormigón - Institut de Ciència i Tecnologia del Formigó | es_ES |
dc.description.bibliographicCitation | Alvarado Vargas, YA.; Gasch, I.; Calderón García, PA.; Torres Górriz, B. (2016). Estudio técnico económico de alternativas del proceso de cimbrado y descimbrado en la construcción de un edificio de forjados de losa maciza de hormigón armado. Revista Ingeniería de Construcción. 31(2):117-126. doi:10.4067/S0718-50732016000200005 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | http://dx.doi.org/10.4067/S0718-50732016000200005 | es_ES |
dc.description.upvformatpinicio | 117 | es_ES |
dc.description.upvformatpfin | 126 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 31 | es_ES |
dc.description.issue | 2 | es_ES |
dc.relation.pasarela | S\316354 | es_ES |