- -

Overcoming failure in infrastructure risk governance implementation: large dams journey

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Overcoming failure in infrastructure risk governance implementation: large dams journey

Mostrar el registro completo del ítem

Escuder Bueno, I.; Halpin, E. (2016). Overcoming failure in infrastructure risk governance implementation: large dams journey. Journal of Risk Research. https://doi.org/10.1080/13669877.2016.1215345

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/97904

Ficheros en el ítem

Metadatos del ítem

Título: Overcoming failure in infrastructure risk governance implementation: large dams journey
Autor: Escuder Bueno, Ignacio Halpin, Eric
Entidad UPV: Universitat Politècnica de València. Departamento de Ingeniería Hidráulica y Medio Ambiente - Departament d'Enginyeria Hidràulica i Medi Ambient
Fecha difusión:
Resumen:
[EN] There is ample recognition of the risk inherent in our very existence and modes of social organization, with a reasonable expectation that implementing risk governance will result in enhanced resilience as a society. ...[+]
Palabras clave: Governance , Risk , Systemic , Infrastructure , Dams
Derechos de uso: Reconocimiento - No comercial - Sin obra derivada (by-nc-nd)
Fuente:
Journal of Risk Research. (issn: 1366-9877 )
DOI: 10.1080/13669877.2016.1215345
Editorial:
Taylor & Francis
Versión del editor: http://doi.org/10.1080/13669877.2016.1215345
Código del Proyecto:
info:eu-repo/grantAgreement/MINECO//BIA2013-48157-C2-1-R/ES/METODOLOGIA DE EVALUACION DE INVERSIONES EN INFRAESTRUCTURAS DEL CICLO INTEGRAL DEL AGUA BASADA EN INDICADORES DE RIESGO Y DE EFICIENCIA ENERGETICA/
Agradecimientos:
This work was supported by Spanish Ministry of Economy and Competitiveness (Ministerio de Economía y Competitividad (España) [grant number BIA2013-48157-C2-1-R].
Tipo: Artículo

References

Abrahamsen, E. B., & Aven, T. (2012). Why risk acceptance criteria need to be defined by the authorities and not the industry? Reliability Engineering & System Safety, 105, 47-50. doi:10.1016/j.ress.2011.11.004

Ardiles, L. D. Sanz, P. Moreno, E. Jenaro, J. Fleitz, and I. Escuder. 2011. “Risk Assessment and Management of 26 Dams Operated by the Duero River Authority in Spain”.Dam Engineering. 21 (4): 313–328. Willmington Publishing. ISSN 0958-9341.

Van Asselt, M. B. A., & Renn, O. (2011). Risk governance. Journal of Risk Research, 14(4), 431-449. doi:10.1080/13669877.2011.553730 [+]
Abrahamsen, E. B., & Aven, T. (2012). Why risk acceptance criteria need to be defined by the authorities and not the industry? Reliability Engineering & System Safety, 105, 47-50. doi:10.1016/j.ress.2011.11.004

Ardiles, L. D. Sanz, P. Moreno, E. Jenaro, J. Fleitz, and I. Escuder. 2011. “Risk Assessment and Management of 26 Dams Operated by the Duero River Authority in Spain”.Dam Engineering. 21 (4): 313–328. Willmington Publishing. ISSN 0958-9341.

Van Asselt, M. B. A., & Renn, O. (2011). Risk governance. Journal of Risk Research, 14(4), 431-449. doi:10.1080/13669877.2011.553730

Van Asselt, M., & Vos, E. (2008). Wrestling with uncertain risks: EU regulation of GMOs and the uncertainty paradox. Journal of Risk Research, 11(1), 281-300. doi:10.1080/13669870801990806

Aven, T. (2010). Misconceptions of Risk. doi:10.1002/9780470686539

Aven, T. (2012). Foundational Issues in Risk Assessment and Risk Management. Risk Analysis, 32(10), 1647-1656. doi:10.1111/j.1539-6924.2012.01798.x

Aven, T. (2012). The risk concept—historical and recent development trends. Reliability Engineering & System Safety, 99, 33-44. doi:10.1016/j.ress.2011.11.006

Aven, T., & Renn, O. (2010). Response to Professor Eugene Rosa’s viewpoint to our paper. Journal of Risk Research, 13(3), 255-259. doi:10.1080/13669870903484369

Aven, T., & Renn, O. (2010). Risk Management and Governance. doi:10.1007/978-3-642-13926-0

Baecher, G. B., Paté, M. E., & De Neufville, R. (1980). Risk of dam failure in benefit-cost analysis. Water Resources Research, 16(3), 449-456. doi:10.1029/wr016i003p00449

Black, J., & Baldwin, R. (2012). When risk-based regulation aims low: Approaches and challenges. Regulation & Governance, 6(1), 2-22. doi:10.1111/j.1748-5991.2011.01124.x

Boholm, Å., Corvellec, H., & Karlsson, M. (2012). The practice of risk governance: lessons from the field. Journal of Risk Research, 15(1), 1-20. doi:10.1080/13669877.2011.587886

Cox, L. A. (2009). Risk Analysis of Complex and Uncertain Systems. International Series in Operations Research & Management Science. doi:10.1007/978-0-387-89014-2

Davis, D., Faber, B. A., & Stedinger, J. R. (2008). USACE Experience in Implementing Risk Analysis for Flood Damage Reduction Projects. Journal of Contemporary Water Research & Education, 140(1), 3-14. doi:10.1111/j.1936-704x.2008.00023.x

De Vries, G., Verhoeven, I., & Boeckhout, M. (2011). Taming uncertainty: the WRR approach to risk governance. Journal of Risk Research, 14(4), 485-499. doi:10.1080/13669877.2011.553728

Escuder-Bueno, I., Matheu, E., T. Castillo-Rodríguez, J., & T. Castillo-Rodríguez, J. (Eds.). (2011). Risk Analysis, Dam Safety, Dam Security and Critical Infrastructure Management. doi:10.1201/b11588

Ezell, B. C., Bennett, S. P., von Winterfeldt, D., Sokolowski, J., & Collins, A. J. (2010). Probabilistic Risk Analysis and Terrorism Risk. Risk Analysis, 30(4), 575-589. doi:10.1111/j.1539-6924.2010.01401.x

Forrester, I., & Hanekamp1, J. C. (2006). Precaution, Science and Jurisprudence: a Test Case. Journal of Risk Research, 9(4), 297-311. doi:10.1080/13669870500042974

Funabashi, Y., & Kitazawa, K. (2012). Fukushima in review: A complex disaster, a disastrous response. Bulletin of the Atomic Scientists, 68(2), 9-21. doi:10.1177/0096340212440359

Hartford, D. N. D., & Baecher, G. B. (2004). Risk and uncertainty in dam safety. doi:10.1680/rauids.32705

IRGC (International Risk Governance Council) 2005.Risk Governance: Towards an Integrative Approach, White Paper No. 1, O. Renn with an Annex by P. Graham. Geneva: International Risk Governance Council.

Krause, P., Fox, J., Judson, P., & Patel, M. (1998). Qualitative risk assessment fulfils a need. Lecture Notes in Computer Science, 138-156. doi:10.1007/3-540-49426-x_7

Kröger, W. (2008). Critical infrastructures at risk: A need for a new conceptual approach and extended analytical tools. Reliability Engineering & System Safety, 93(12), 1781-1787. doi:10.1016/j.ress.2008.03.005

Lofstedt, R. E. (2010). Risk communication guidelines for Europe: a modest proposition. Journal of Risk Research, 13(1), 87-109. doi:10.1080/13669870903126176

(2008). Journal of Contemporary Water Research & Education, 140(1). doi:10.1111/jcwr.2008.140.issue-1

Park, J., Seager, T. P., Rao, P. S. C., Convertino, M., & Linkov, I. (2012). Integrating Risk and Resilience Approaches to Catastrophe Management in Engineering Systems. Risk Analysis, 33(3), 356-367. doi:10.1111/j.1539-6924.2012.01885.x

Renn, O., & Walker, K. D. (Eds.). (2008). Global Risk Governance. International Risk Governance Council Bookseries. doi:10.1007/978-1-4020-6799-0

Renn, O., Klinke, A., & van Asselt, M. (2011). Coping with Complexity, Uncertainty and Ambiguity in Risk Governance: A Synthesis. AMBIO, 40(2), 231-246. doi:10.1007/s13280-010-0134-0

Rosa, E. A. (2010). The logical status of risk – to burnish or to dull. Journal of Risk Research, 13(3), 239-253. doi:10.1080/13669870903484351

Slovic, P. (1987). Perception of risk. Science, 236(4799), 280-285. doi:10.1126/science.3563507

Vlek, C. (2010). Judicious management of uncertain risks: I. Developments and criticisms of risk analysis and precautionary reasoning. Journal of Risk Research, 13(4), 517-543. doi:10.1080/13669871003629887

Zhao, X., Hwang, B.-G., & Low, S. P. (2015). Enterprise Risk Management in International Construction Operations. doi:10.1007/978-981-287-549-5

[-]

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem