Blasco Cuesta, Francesc David(Universitat Politècnica de València, 2014-07-14)
[EN]
The present project has as goal the structural analyses from an underpass to allowed the transit through a roundabout under the KP 11+557 of the highway of the Mediterranean. this project is located in the municipal ...
Villalba Garzarán, Manuel(Universitat Politècnica de València, 2014-07-14)
[EN] As a consequence of the construction of the A-7 Motorway, in its section Cocentaina-Muro de Alcoy, there is a need of replacing the roads affected by it. Specifically, this project aims to deal with the crossing between ...
Cervera Vallbona, Ana(Universitat Politècnica de València, 2014-07-18)
As a consequence of the construction of the A-7 Motorway in its section Cocentaina-Muro de Alcoy, there is a need of replacing the roads affected by it. Specifically, this project aims to deal with the crossing between the ...
Melero Morán, Pablo(Universitat Politècnica de València, 2014-07-14)
[EN] The project developed in this work is to propose the most effective solution in terms of technical and economical point of view for the replacement of the road in the PK 7 +763 tranche Cocentaina - Muro de Alcoy. This ...
Pérez Descals, David(Universitat Politècnica de València, 2016-11-18)
[EN] This final project seeks to establish a link between the knowledge for the development of a
framework, with
a review of the different types of
frames
and
the
history of the framing
.
However, as the types ...