Construction planning into BIM environment: comparing Critical path method and Location based scheduling

dc.contributor.advisorFuentes Giner, María Begoña
dc.contributor.advisorOliver Faubel, Inmaculada
dc.contributor.affiliationDepartamento de Construcciones Arquitectónicas
dc.contributor.affiliationEscuela Técnica Superior de Ingeniería de Edificación
dc.contributor.authorBergamotti, Francescoes_ES
dc.coverage.spatialeast=-0.41115850000005594; north=39.29638540000001; name=Carrer de València, 30, Almussafes, Valencia, Espanyaes_ES
dc.date.accessioned2019-09-02T17:42:45Z
dc.date.available2019-09-02T17:42:45Z
dc.date.created2019-07-24
dc.date.issued2019-09-02es_ES
dc.description.abstract[EN] Construction planning is essential for the project success. It is a fundamental and challenging activity in the management and execution of construction projects. It involves the choice of technology, the definition of work tasks, the estimation of the required resources and durations for individual tasks, and the identification of any interactions among the different work tasks. Building Information Modeling (BIM) is a technology that allows relevant graphical and topical information related to the built environment to be stored in the database for access and management through a project lifecycle. With the development of digital technology, data and information can be linked with 3D components in BIM to provide 4D(Times), 5D(Costs), 6D (Facility Management) and 7D (Sustainability) BIM. Through scientific research, it is proven that BIM could have a marked impact on the construction industry. Two are the construction planning techniques analyzed and compared into BIM environment. On one hand, the Location Based Scheduling (LBS), that nowadays have resurfaced as a methodology for planning repetitive tasks in the constructive process due to increasingly general adoption of BIM technology in the construction industry. the aim is to develop and communicate the schedule with space as resource. It is a Time-Space scheduling Method. On the other hand, the Critical Path Method (CPM) that has been dominant for construction planning since the late 50s, and is lying the keystone on activities and their logical connections, having minor attention on resources. The discipline of 4D BIM focuses on the planning and the execution, adding the time variable to the three dimensions of the parametric model. And this planning can be done both from the criterion of using the work units (the elements of the BIM model) as the centerpiece of the programming (Critical Path Method) as well as using the spaces (Location Based Scheduling), where the constructive activity has to be developed. The starting hypothesis of the Thesis assumed that BIM is becoming the standard for project development, construction and management during its useful life, and it proposes a comparison of both planning method into BIM environment.en_EN
dc.description.accrualMethodTFGMes_ES
dc.description.bibliographicCitationBergamotti, F. (2019). Construction planning into BIM environment: comparing Critical path method and Location based scheduling. https://riunet.upv.es/handle/10251/124795es_ES
dc.format.extent141es_ES
dc.identifier.urihttps://riunet.upv.es/handle/10251/124795
dc.languageIngléses_ES
dc.publisherUniversitat Politècnica de Valènciaes_ES
dc.relation.pasarelaTFGM\110151es_ES
dc.rightsReserva de todos los derechoses_ES
dc.rights.accessRightsCerradoes_ES
dc.subjectProject managementes_ES
dc.subjectInformation resources managementes_ES
dc.subjectBuilding--Planninges_ES
dc.subjectArchitectural designs and plans
dc.subjectBIM (Building information modeling)es_ES
dc.subjectGestión de proyectoses_ES
dc.subjectSistemas de información en la gestiónes_ES
dc.subjectProyectos arquitectónicoses_ES
dc.subjectConstrucción-Planificación
dc.subject.classificationCONSTRUCCIONES ARQUITECTONICASes_ES
dc.subject.otherMáster Universitario en Edificación-Màster Universitari en Edificacióes_ES
dc.titleConstruction planning into BIM environment: comparing Critical path method and Location based schedulinges_ES
dc.typeTesis de másteres_ES
dspace.entity.typePublication
person.identifier74621
person.identifier89737
person.identifier.orcid0009-0006-1144-4901
person.identifier.orcid0000-0001-8401-110X
relation.isAdvisorOfPublication1e527b41-735a-4dc3-bf1a-bf88750def85
relation.isAdvisorOfPublication6df40c2a-c678-497d-ae86-d2dae74174c3
relation.isAdvisorOfPublication.latestForDiscovery1e527b41-735a-4dc3-bf1a-bf88750def85
relation.isOrgUnitOfPublication74535f31-c7e4-4498-94d8-d383211eb09b
relation.isOrgUnitOfPublicationde470012-4694-43ee-87f9-6cafbd5e0f95
relation.isOrgUnitOfPublication.latestForDiscovery74535f31-c7e4-4498-94d8-d383211eb09b
upv.uuid98111ebc-c19e-428b-baa6-6f6a22c2b418es_ES

Archivos

Bloque original

Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
Bergamotti - Planificación y programación en entornos BIM: Comparativa entre la Planificación bas....pdf
Tamaño:
5.34 MB
Formato:
Adobe Portable Document Format