Computational aspects of dam risk analysis: Findings and challenges
| dc.contributor.affiliation | Departamento de Ingeniería Hidráulica y Medio Ambiente | |
| dc.contributor.affiliation | Instituto Universitario de Ingeniería del Agua y del Medio Ambiente | |
| dc.contributor.affiliation | Escuela Técnica Superior de Ingeniería de Caminos, Canales y Puertos | |
| dc.contributor.author | Escuder Bueno, Ignacio | |
| dc.contributor.author | Mazzà, G. | es_ES |
| dc.contributor.author | Morales Torres, Adrián | es_ES |
| dc.contributor.author | Castillo-Rodríguez, J.T. | |
| dc.contributor.funder | Ministerio de Economía, Industria y Competitividad | es_ES |
| dc.date.accessioned | 2018-02-13T08:33:21Z | |
| dc.date.available | 2018-02-13T08:33:21Z | |
| dc.date.issued | 2016 | es_ES |
| dc.description.abstract | [EN] In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on "Computational Aspects of Analysis and Design of Dams." In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, incltuding downstream consequence assessments and the uncertainty of sructural models. (C) 2016 THE AUTHORS. Published by Elsevier LTD on behalf of Chinese Academy of Engineering and Higher Education Press Limited Company. | en_EN |
| dc.description.accrualMethod | S | es_ES |
| dc.description.bibliographicCitation | Escuder Bueno, I.; Mazzà, G.; Morales Torres, A.; Castillo-Rodríguez, J. (2016). Computational aspects of dam risk analysis: Findings and challenges. Engineering. 2(3):319-324. https://doi.org/10.1016/J.ENG.2016.03.005 | es_ES |
| dc.description.issue | 3 | es_ES |
| dc.description.sponsorship | This paper was published with the support of the research project INICIA (Methodology for Assessing Investments on Water Cycle Infrastructures informed on Risk and Energy Efficiency Indicators, BIA2013-48157-C2-1-R, 2014-2016) funded by the Spanish Ministerio de Economia y Competitividad (Programa Estatal de Investigacion, Desarrollo e Innovacion Orientada a los Retos de la Sociedad). | |
| dc.description.upvformatpfin | 324 | es_ES |
| dc.description.upvformatpinicio | 319 | es_ES |
| dc.description.volume | 2 | es_ES |
| dc.identifier.doi | 10.1016/J.ENG.2016.03.005 | es_ES |
| dc.identifier.issn | 2095-8099 | es_ES |
| dc.identifier.uri | https://riunet.upv.es/handle/10251/97785 | |
| dc.language | Inglés | es_ES |
| dc.publisher | Elsevier | es_ES |
| dc.relation.ispartof | Engineering | es_ES |
| dc.relation.pasarela | S\324957 | es_ES |
| dc.relation.projectID | info:eu-repo/grantAgreement/MINECO//BIA2013-48157-C2-1-R/ES/METODOLOGIA DE EVALUACION DE INVERSIONES EN INFRAESTRUCTURAS DEL CICLO INTEGRAL DEL AGUA BASADA EN INDICADORES DE RIESGO Y DE EFICIENCIA ENERGETICA/ | es_ES |
| dc.relation.publisherversion | http://doi.org/10.1016/J.ENG.2016.03.005 | es_ES |
| dc.rights | Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) | es_ES |
| dc.rights.accessRights | Abierto | es_ES |
| dc.subject | Dams | es_ES |
| dc.subject | Risk analysis | es_ES |
| dc.subject | Computational methods | es_ES |
| dc.subject | Safety management | es_ES |
| dc.subject | Hydraulic structures | es_ES |
| dc.subject.asignatura | Ingeniería de presas 36119 / C - Máster universitario en ingeniería de caminos, canales y puertos 2323 | es_ES |
| dc.subject.classification | INGENIERIA HIDRAULICA | es_ES |
| dc.title | Computational aspects of dam risk analysis: Findings and challenges | es_ES |
| dc.type | Artículo | es_ES |
| dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
| dspace.entity.type | Publication | |
| person.identifier | 11861 | |
| person.identifier | 272194 | |
| person.identifier.orcid | 0000-0002-3929-4216 | |
| person.identifier.orcid | 0000-0002-4411-9973 | |
| relation.isAuthorOfPublication | 49638507-f79e-40e5-8e87-65839a842f32 | |
| relation.isAuthorOfPublication | 857e1873-432a-45e4-a40a-cd91638e9b3a | |
| relation.isAuthorOfPublication.latestForDiscovery | 49638507-f79e-40e5-8e87-65839a842f32 | |
| relation.isOrgUnitOfPublication | e8876040-9428-45e8-b805-b5bbc20e9e1e | |
| relation.isOrgUnitOfPublication | 937991bf-5e71-4f67-ae2a-1fb780a35167 | |
| relation.isOrgUnitOfPublication | a4b47ff5-95f4-430f-a1a3-541cb8eaa9b7 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | e8876040-9428-45e8-b805-b5bbc20e9e1e | |
| upv.uuid | c1f0ea70-db75-4c56-8320-d7ae815bbfd4 | es_ES |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- 2016_Computational.pdf
- Tamaño:
- 6.23 MB
- Formato:
- Adobe Portable Document Format
- Descripción:
- Versión editorial