BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects

dc.contributor.affiliationDepartamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil
dc.contributor.affiliationEscuela Técnica Superior de Ingeniería de Caminos, Canales y Puertos
dc.contributor.affiliationGrupo de Gestión del Proceso Proyecto-Construcción
dc.contributor.authorRojas, María Josées_ES
dc.contributor.authorHerrera, Rodrigo F.es_ES
dc.contributor.authorMourgues, Claudioes_ES
dc.contributor.authorPonz-Tienda, José Luises_ES
dc.contributor.authorAlarcón, Luis F.es_ES
dc.contributor.authorPellicer, Eugenio
dc.contributor.funderFondo Nacional de Desarrollo Científico y Tecnológico, Chilees_ES
dc.contributor.funderComisión Nacional de Investigación Científica y Tecnológica, Chilees_ES
dc.date.accessioned2020-06-05T03:33:21Z
dc.date.available2020-06-05T03:33:21Z
dc.date.issued2019-06-09es_ES
dc.description.abstract[EN] The evaluation of BIM capabilities and repeatability enables a company or project to identify its current status and how to improve continuously; this evaluation can be performed with BIM maturity models. However, these maturity models can measure the BIM state but not specifically the application of BIM uses. Likewise, in interorganizational project teams with a diversity of factors from various companies, it is possible to evaluate the capacity at a specified time with specified factors, but it is not possible to evaluate the repeatability unless the client always works with the same project teams. Therefore, despite the existence of various BIM uses in the literature, there is no instrument to evaluate the level of implementation of them in construction projects. This research proposes a BIM Use Assessment (BUA) tool for characterizing the levels of application of the BIM uses in the planning and design phases of building projects. The research methodology was organized into three stages: (1) identification, selection, and definition of BIM uses; (2) proposal of the BUA tool for characterizing the level of BIM use application; and (3) validation of the BUA tool. The tool was validated using 25 construction projects, where high reliability and concordance were observed; hence, the BUA tool complies with the consistency and concordance analysis for assessing uses in the design and planning phases of construction projects. The assessment will enable self-diagnosis, stakeholder qualification/selection, and industry benchmarking.en_EN
dc.description.accrualMethodSes_ES
dc.description.bibliographicCitationRojas, MJ.; Herrera, RF.; Mourgues, C.; Ponz-Tienda, JL.; Alarcón, LF.; Pellicer, E. (2019). BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects. Advances in Civil Engineering. 2019:1-9. https://doi.org/10.1155/2019/9094254es_ES
dc.description.referencesAzhar, S. (2011). Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry. Leadership and Management in Engineering, 11(3), 241-252. doi:10.1061/(asce)lm.1943-5630.0000127es_ES
dc.description.referencesSuccar, B., Sher, W., & Williams, A. (2012). Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2), 120-142. doi:10.1080/17452007.2012.659506es_ES
dc.description.referencesSydow, J., & Braun, T. (2018). Projects as temporary organizations: An agenda for further theorizing the interorganizational dimension. International Journal of Project Management, 36(1), 4-11. doi:10.1016/j.ijproman.2017.04.012es_ES
dc.description.referencesMcHugh, M. L. (2012). Interrater reliability: the kappa statistic. Biochemia Medica, 276-282. doi:10.11613/bm.2012.031es_ES
dc.description.sponsorshipThis work was supported by FONDECYT (1181648 to Alarcón L. F. and Mourgues C.) and CONICYT, Chile (PCHA/National Doctorate/2018-21180884 to Herrera R. F.).es_ES
dc.description.upvformatpfin9es_ES
dc.description.upvformatpinicio1es_ES
dc.description.volume2019es_ES
dc.identifier.doi10.1155/2019/9094254es_ES
dc.identifier.issn1687-8086es_ES
dc.identifier.urihttps://riunet.upv.es/handle/10251/145424
dc.languageIngléses_ES
dc.publisherHindawi Limitedes_ES
dc.relation.ispartofAdvances in Civil Engineeringes_ES
dc.relation.pasarelaS\389212es_ES
dc.relation.projectIDinfo:eu-repo/grantAgreement/CONICYT//2018-21180884/es_ES
dc.relation.projectIDinfo:eu-repo/grantAgreement/FONDECYT//1181648/es_ES
dc.relation.publisherversionhttps://doi.org/10.1155/2019/9094254es_ES
dc.relation.references10.1061/(asce)lm.1943-5630.0000127es_ES
dc.relation.references10.1080/17452007.2012.659506es_ES
dc.relation.references10.1016/j.ijproman.2017.04.012es_ES
dc.relation.references10.11613/bm.2012.031es_ES
dc.rightsReconocimiento (by)es_ES
dc.rights.accessRightsAbiertoes_ES
dc.subject.classificationCONSTRUCCIONES ARQUITECTONICASes_ES
dc.subject.classificationPROYECTOS DE INGENIERIAes_ES
dc.titleBIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projectses_ES
dc.typeArtículoes_ES
dc.type.versioninfo:eu-repo/semantics/publishedVersiones_ES
dspace.entity.typePublication
person.identifier1848
person.identifier.orcid0000-0001-9100-0644
relation.isAuthorOfPublication7cb77cbd-8cdc-4b87-aed3-039755a16dea
relation.isAuthorOfPublication.latestForDiscovery7cb77cbd-8cdc-4b87-aed3-039755a16dea
relation.isOrgUnitOfPublication0d87f640-7be6-4adb-b5cd-9eb294798a72
relation.isOrgUnitOfPublicationa4b47ff5-95f4-430f-a1a3-541cb8eaa9b7
relation.isOrgUnitOfPublication38c096ba-a68f-4127-8845-f6156608d94d
relation.isOrgUnitOfPublication.latestForDiscovery0d87f640-7be6-4adb-b5cd-9eb294798a72
upv.uuidcd3440f0-23bb-49d5-9f65-2787e4d9db52es_ES

Archivos

Bloque original

Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
Rojas;Herrera;Mourgues - BIM Use Assessment (BUA) Tool for Characterizing the Application Levels ....pdf
Tamaño:
1.42 MB
Formato:
Adobe Portable Document Format
Descripción:
Versión editorial