- -

A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler

Mostrar el registro completo del ítem

García Sabater, JP.; Maheut ., JP.; García Sabater, JJ. (2012). A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler. International Journal of Flexible Manufacturing Systems. 24(2):171-209. doi:10.1007/s10696-011-9126-z

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/100066

Ficheros en el ítem

Metadatos del ítem

Título: A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler
Autor: García Sabater, José Pedro Maheut ., Julien Philippe García Sabater, Julio Juan
Entidad UPV: Universitat Politècnica de València. Departamento de Organización de Empresas - Departament d'Organització d'Empreses
Fecha difusión:
Resumen:
[EN] This paper presents an operations planning scheme based on mathematical programming models (specifically, Mixed-Integer Linear Programming (MILP) models) integrated into a web-enabled Advanced Planning and Scheduling ...[+]
Palabras clave: Advanced planning and scheduling system (APS) , Automotive industry , Just in time (JIT) , Mixed-integer linear programming (MILP) , Supply chain management (SCM) , Advanced planning and scheduling systems , Automotive sector
Derechos de uso: Cerrado
Fuente:
International Journal of Flexible Manufacturing Systems. (issn: 0920-6299 )
DOI: 10.1007/s10696-011-9126-z
Editorial:
SPRINGER
Versión del editor: https://doi.org/10.1007/s10696-011-9126-z
Código del Proyecto:
info:eu-repo/grantAgreement/Generalitat Valenciana//ACIF%2F2010%2F222/ES/AYUDA VALI+D PREDOCTORAL-JULIEN MAHEUT/
info:eu-repo/grantAgreement/MICINN//DPI2010-18243/ES/COORDINACION DE OPERACIONES EN REDES DE SUMINISTRO%2FDEMANDA AJUSTADAS, RESILIENTES A LA INCERTIDUMBRE: MODELOS Y ALGORITMOS PARA LA GESTION DE LA INCERTIDUMBRE Y LA COMPLEJIDAD/
info:eu-repo/grantAgreement/UPV//PAID-05-2010-2741/ES/PAID-05-2010-2741/
Agradecimientos:
The work described in this paper has been partially supported by the Ministerio de Ciencia e Innovacion del Gobierno de Espana within the Program de "Proyectos de Investigacion Fundamental No Orientada through the project ...[+]
Tipo: Artículo

References

Bautista J, Companys R, Corominas A (1996) Heuristics and exact algorithms for solving the Monden problem. Eur J Oper Res 88(1):101–113

Begnaud J, Benjaafar S, Miller LA (2009) The multi-level lot sizing problem with flexible production sequences. IIE Trans 41(8):702–715

Bilgen B, Günther HO (2009) Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application. OR Spectr 32(4):927–955 [+]
Bautista J, Companys R, Corominas A (1996) Heuristics and exact algorithms for solving the Monden problem. Eur J Oper Res 88(1):101–113

Begnaud J, Benjaafar S, Miller LA (2009) The multi-level lot sizing problem with flexible production sequences. IIE Trans 41(8):702–715

Bilgen B, Günther HO (2009) Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application. OR Spectr 32(4):927–955

Boysen N, Fliedner M, Scholl A (2009) Level scheduling for batched JIT supply. Flex Serv Manuf J 21(1–2):31–50

Bozarth CC, Warsing DP, Flynn BB, Flynn EJ (2009) The impact of supply chain complexity on manufacturing plant performance. J Oper Manag 27(1):78–93

Cardos Carbonera M, Garcia-Sabater JP (2006) Designing a consumer products retail chain inventory replenishment policy with the consideration of transportation costs. Int J Prod Econ 104(2):525–535

Caridi M, Sianesi A (1999) Trends in planning and control systems: APS—ERP integration. In: Mertins K, Krause O, Schallock B (eds) Global production management. Kluwer, Dordrecht

Chen IJ (2001) Planning for ERP systems: analysis and future trend. Bus Process Manag J 7(5):374–386

Chern CC, Hsieh JS (2007) A heuristic algorithm for master planning that satisfies multiple objectives. Comput Oper Res 34(11):3491–3513

Choi TY, Hong Y (2002) Unveiling the structure of supply networks: case studies in Honda, Acura, and DaimlerChrysler. J Oper Manage 20(5):469–493

Chung SH, Snyder CA (2000) ERP adoption: a technological evolution approach. Int J Agile Manage Syst 2(1):24–32

David F, Pierreval H, Caux C (2006) Advanced planning and scheduling systems in aluminium conversion industry. Int J Comput Integr Manuf 19(7):705–715

Drexl A, Fleischmann B, Günther HO, Stadtler H, Tempelmeier H (1994) Konzeptionelle Grundlagen kapazi tätsorientierter PPS-Systeme. Zeitschrift für betriebswirtschaftliche Forschung 46:1022–1045

Dudek G (2004) Collaborative planning in supply chains. A negotiation-based approach. Springer, Berlin, p 2004

Fleischmann B, Meyr H (2003) Planning hierarchy, modeling and advanced planning systems. Handb Oper Res Manage Sci 11:455–523

Garcia-Sabater JP, Vidal P (2008) El problema de la programación del lote económico del ELSP: Una revisión de la literatura. X Congreso de Ingeniería de Organización 1:1–8

Garcia-Sabater JP, Maheut J, Marin-Garcia JA (in press) A new formulation technique to model materials and operations planning: the generic materials and operations planning (GMOP) problem. Eur J Ind Eng

Günther HO, Meyr H (2009) Supply chain planning and advanced planning systems. OR Spectr 31(1):1–3

Günther HO, Seiler T (2009) Operative transportation planning in consumer goods supply chains. Flex Serv Manuf J 21(1–2):51–74

Hahn CK, Duplaga EA, Hartley JL (2000) Supply-chain synchronization: lessons from Hyundai motor company. Interfaces 30(4):32–45

Ho JC, Chang YL (2001) An integrated MRP and JIT framework. Comput Ind Eng 41(2):173–185

Hüttmeir A, de Treville S, van Ackere A, Monnier L, Prenninger J (2009) Trading off between heijunka and just-in-sequence. Int J Prod Econ 118(2):501–507

Kannegiesser M, Gunther HO (2011) An integrated optimization model for managing the global value chain of a chemical commodities manufacturer. J Oper Res Soc 62(4):711–721

Lang JC (2009) Production and inventory management with substitutions. Springer, Berlin

Lee HL (2002) Aligning supply chain strategies with product uncertainties. Calif Manage Rev 44(3):105–119

Lloret J, Garcia-Sabater JP, Marin-Garcia JA (2009) Cooperative supply chain re-scheduling: the case of an engine supply chain. In: Springer B (ed) Lecture notes in computer science, vol 5738/2009, pp 376–383

Maheut J, Garcia-Sabater JP, Mula F (2012) A supply chain operations lot-sizing and scheduling model with alternative operations. In: Sethi SP et al (ed) Industrial engineering: innovative networks. Springer London

Meyr H (2004) Supply chain planning in the German automotive industry. OR Spectr 26(4):447–470

Meyr H, Wagner M, Rohde J (2005) Structure of advanced planning systems. In: Staedtler H, Kilger C (eds) Supply chain management and advanced planning: concepts, models, software and case studies, 3rd edn. Springer, Berlin, pp 109–115

Monden Y (1981) Production smoothing. Industrial engineering, pp 42–51

Monden Y (1994) Toyota production system. An integrate approach to just in time. Chapman & Hall, London

Mula J, Peidro D, Diaz-Madroñero M, Vicens E (2010) Mathematical programming models for supply chain production and transport planning. Eur J Oper Res 204(3):366–390

Ozdamar L, Yazgac T (1999) A hierarchical planning approach for a production-distribution system. Int J Prod Res 37(16):3759–3772

Parush A, Hod A, Shtub A (2007) Impact of visualization type and contextual factors on performance with enterprise resource planning systems. Comput Ind Eng 52(1):133–142

Piper CJ, Vachon S (2001) Accounting for productivity losses in aggregate planning. Int J Prod Res 39(17):4001–4012

Puig-Bernabeu X, Maheut J, Garcia-Sabater JP, Lario FC (2010) Algorithm for planning the supply of product with FTL strategy in lean environment: an industrial case. ICOVACS 2010 Valencia—international conference on value chain sustainability, pp 174–182

Quadt D, Kuhn H (2008) Capacitated lot-sizing with extensions: a review. 4OR Q J Oper Res 6(1):61–83

Rashid MA, Hossain L, Patrick J (2002) Enterprise resource planning solutions & management. In: Nah FF-H (ed) Enterprise resource planning solutions & management. IRM Press, USA

Riezebos J, Klingenberg W, Hicks C (2009) Lean production and information technology: connection or contradiction? Comput Ind 60(4):237–247

Sillekens T, Koberstein A, Suhl L (2010) Aggregate production planning in the automotive industry with special consideration of workforce flexibility. Int J Prod Res iFirst:1–24

Simpson NC, Erenguc S (2001) Modeling the order picking function in supply chain systems: formulation, experimentation, and insights. IIE Trans 33(2):119

Stadtler H (2005) Supply chain management and advanced planning—basics, overview and challenges. Eur J Oper Res 163(3):575–588

Stadtler H, Kilger C (2002) Supply chain management and advanced planning: concepts, models, software and case studies. Springer, Berlin

Sugimori Y, Kusunoki K, Cho F, Uchikawa S (1977) Toyota production system and Kanban system materialization of just-in-time and respect-for-human system. Int J Prod Res 15(6):553–564

Wang RC, Liang TF (2004) Application of fuzzy multi-objective linear programming to aggregate production planning. Comput Ind Eng 46(1):17–41

Wang S, Sarker BR (2005) An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy. Eur J Oper Res 162(1):153–172

Yokoyama M (2008) Flow-shop scheduling with setup and assembly operations. Eur J Oper Res 187(3):1184–1195

[-]

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem