- -

Development of systemic methods to improve management techniques based on Balanced Scorecard in Manufacturing Environment

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Development of systemic methods to improve management techniques based on Balanced Scorecard in Manufacturing Environment

Mostrar el registro completo del ítem

Sánchez Márquez, R. (2019). Development of systemic methods to improve management techniques based on Balanced Scorecard in Manufacturing Environment [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/134022

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/134022

Ficheros en el ítem

Metadatos del ítem

Título: Development of systemic methods to improve management techniques based on Balanced Scorecard in Manufacturing Environment
Otro titulo: Desarrollo de métodos sistémicos para la mejora de las técnicas de gestión basadas en el cuadro integral de mando en entornos de fabricación
Autor: Sánchez Márquez, Rafael
Director(es): Albarracín Guillem, José Miguel Vicens Salort, Eduardo
Entidad UPV: Universitat Politècnica de València. Departamento de Ingeniería Mecánica y de Materiales - Departament d'Enginyeria Mecànica i de Materials
Fecha acto/lectura:
2019-11-28
Fecha difusión:
Resumen:
[ES] El "Balanced Scorecard" (BSC) como "Performance Management System" (PMS) se ha difundido por todo el mundo desde que Kaplan y Norton (1992) establecieron sus fundamentos teóricos. Kaplan (2009) afirmó que el uso del ...[+]


[CA] El "Balanced Scorecard" (BSC) com "Performance Management System" (PMS) s'ha difós per tot el món des que Kaplan i Norton (1992) van establir els seus fonaments teòrics. Kaplan (2009) va afirmar que l'ús del BSC i, ...[+]


[EN] The Balanced Scorecard (BSC) as a Performance Management Method (PMS) has been spread worldwide since Kaplan and Norton (1992) established its theoretical foundations. Kaplan (2009) claimed that the use of the BSC and ...[+]
Palabras clave: Balanced Scorecard , Manufacturing , Key Performance Indicators , Data Analytics , Management Engineering
Derechos de uso: Reserva de todos los derechos
DOI: 10.4995/Thesis/10251/134022
Editorial:
Universitat Politècnica de València
Descripción: Tesis por compendio
Tipo: Tesis doctoral

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem