Al-Aomar, R. (2006). Capacity-constrained production scheduling of multiple vehicle programs in automotive pilot plant. International Journal of Production Research, 44(13), 2573-2604. https://doi.org/10.1080/00207540500521212
Cagliano, A. C., Chiabert, P. (2018). Plant and manufacturing system lecture notes. Politecnico di Torino, Italy.
Chingua, S. Nyemba, W. R., Boora, K., Mbohwa, C. (2019). Feasibility study of the materials handling and development of a sustainable conveying system in plastics recycling and manufacture. Procedia Manufacturing, 33, 383-390. https://doi.org/10.1016/j.promfg.2019.04.047
[+]
Al-Aomar, R. (2006). Capacity-constrained production scheduling of multiple vehicle programs in automotive pilot plant. International Journal of Production Research, 44(13), 2573-2604. https://doi.org/10.1080/00207540500521212
Cagliano, A. C., Chiabert, P. (2018). Plant and manufacturing system lecture notes. Politecnico di Torino, Italy.
Chingua, S. Nyemba, W. R., Boora, K., Mbohwa, C. (2019). Feasibility study of the materials handling and development of a sustainable conveying system in plastics recycling and manufacture. Procedia Manufacturing, 33, 383-390. https://doi.org/10.1016/j.promfg.2019.04.047
Derhami, S., Smith, J. S., Gue, K. R. (2019). Space-efficient layouts for block stacking warehouse. IISE Transaction, 51(9), 957-971. https://doi.org/10.1080/24725854.2018.1539280
Eksangsri, T., Jaiwang, T. (2014). Feasibility study on reuse of washed water in electronic industry: case study for flexible printed circuit board manufacturing in Thailand. Procedia Environmental Sciences, 20, 206-214. https://doi.org/10.1016/j.proenv.2014.03.027
Fu, M., Kaku, B. K. (1997). Minimizing work-in-process and material handling in the facilities layout problem. IIE Transactions, 29, 29-36. https://doi.org/10.1080/07408179708966309
Halil, F. M., Nasir, N. M., Hassan, A. A., Shukur, A. S. (2016). Feasibility study and economic assessment in green building projects. Procedia-Social and Behavioral Sciences, 222, 56-64. https://doi.org/10.1016/j.sbspro.2016.05.176
Hazaras, M. J., Swartz, C. L. E., Marlin, T. E. (2013). Industrial application of a continuous-time scheduling framework for process analysis and improvement. I&EC research Industrial & Engineering Chemistry Research, 53, 259-273. https://doi.org/10.1021/ie4006904
Hwang, D. K., Cho, K., Moon, J. (2019). Feasibility study on energy audit and data driven analysis procedure for building energy efficiency: bench-marking in Korean hospital buildings. Journal Energy 12(15), 3006. https://doi.org/10.3390/en12153006
Jung, S., Ng, D., Ovalle, C. D., Roman, R, V., Mannan, M. S. (2011). New approach to optimizing the facility sitting and layout for fire and explosion scenarios. I&EC research Industrial & Engineering Chemistry Research, 50, 3928-3937. https://doi.org/10.1021/ie101367g
Kingenberg, W., Boksma, J. D. (2010). A conceptual framework for outsourcing of material handling activities in automotive: differentiation and implementation. International Journal of Production Research, 48(16), 4877-4899. https://doi.org/10.1080/00207540903067177
Kovàcs, G. (2019). Layout design for efficiency improvement and cost reduction. Bull. Pol. Ac.: Tech., 67(3), 547-555. https://doi.org/10.24425%2Fbpasts.2019.129653
Ma, T., Yang, H., Lu. L., Qi, R. (2017). Feasibility study of developing a zero-carbon-emission green deck in Hong Kong. Energy Procedia 105, 1155-1159. https://doi.org/10.1016/j.egypro.2017.03.487
Morgan, B., Hejdenberg, J., Krapels, S. H., Amstrong, D. (2018). DO feasibility studies contribute to, or avoid, waste in research? PLos ONE 13(4), e0195951. https://doi.org/10.1371/journal.pone.0195951
Pòvoa, A. P. B., (2002). Optimal design and layout of industrial facilities: a simultaneous approach. Ind. Eng. Chem. Res, 41, 3601-3609. https://doi.org/10.1021/ie010660s
Schaller, J. (2008). Incorporating cellular manufacturing into supply chain design. International Journal of Production Research, 46(17), 4925-4945. https://doi.org/10.1080/00207540701348761
Stephens, M. P., Meyers, F. E., (2013). Manufacturing facilities design and material handling - fifth edition. Purdue University Press, West Lafayette, Indiana.
Sun, L., Luan, F., Pian, J. (2015). An effective approach for scheduling of refining process with uncertain iterations in steel-making and continuous casting process. IFAC-PapersOnLine, 48(3), 1966-1972. https://doi.org/10.1016/j.ifacol.2015.06.376
Yang, Z., Djurdjanovic, D., Ni, J. (2007). Maintenance scheduling for a manufacturing system of machines with adjustable throughput. IIE Transactions, 39, 1111-1125. https://doi.org/10.1080/07408170701315339
[-]