- -

Feasibility Study of a Facility to Produce Injection Molded Parts for Automotive Industry

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Feasibility Study of a Facility to Produce Injection Molded Parts for Automotive Industry

Mostrar el registro completo del ítem

Yudianto, A.; Tan, H.; Qu, Z.; Xue, Q.; Naveen, A.; Mushtaq, M.; Gopi, K. (2020). Feasibility Study of a Facility to Produce Injection Molded Parts for Automotive Industry. International Journal of Production Management and Engineering. 8(1):45-57. https://doi.org/10.4995/ijpme.2020.12360

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/138134

Ficheros en el ítem

Metadatos del ítem

Título: Feasibility Study of a Facility to Produce Injection Molded Parts for Automotive Industry
Autor: Yudianto, A. Tan, H. Qu, Z. Xue, Q. Naveen, A.C Mushtaq, M. Gopi, K.S.
Fecha difusión:
Resumen:
[EN] This study aims at the preliminary assessment in designing a complete stand-alone industrial facility to produce injection molded parts for the automotive industry. A draft design solution to allow the company to ...[+]
Palabras clave: Feasibility study , Facility design , Layout design , Plant layout design
Derechos de uso: Reconocimiento - No comercial - Sin obra derivada (by-nc-nd)
Fuente:
International Journal of Production Management and Engineering. (eissn: 2340-4876 )
DOI: 10.4995/ijpme.2020.12360
Editorial:
Universitat Politècnica de València
Versión del editor: https://doi.org/10.4995/ijpme.2020.12360
Tipo: Artículo

References

Al-Aomar, R. (2006). Capacity-constrained production scheduling of multiple vehicle programs in automotive pilot plant. International Journal of Production Research, 44(13), 2573-2604. https://doi.org/10.1080/00207540500521212

Cagliano, A. C., Chiabert, P. (2018). Plant and manufacturing system lecture notes. Politecnico di Torino, Italy.

Chingua, S. Nyemba, W. R., Boora, K., Mbohwa, C. (2019). Feasibility study of the materials handling and development of a sustainable conveying system in plastics recycling and manufacture. Procedia Manufacturing, 33, 383-390. https://doi.org/10.1016/j.promfg.2019.04.047 [+]
Al-Aomar, R. (2006). Capacity-constrained production scheduling of multiple vehicle programs in automotive pilot plant. International Journal of Production Research, 44(13), 2573-2604. https://doi.org/10.1080/00207540500521212

Cagliano, A. C., Chiabert, P. (2018). Plant and manufacturing system lecture notes. Politecnico di Torino, Italy.

Chingua, S. Nyemba, W. R., Boora, K., Mbohwa, C. (2019). Feasibility study of the materials handling and development of a sustainable conveying system in plastics recycling and manufacture. Procedia Manufacturing, 33, 383-390. https://doi.org/10.1016/j.promfg.2019.04.047

Derhami, S., Smith, J. S., Gue, K. R. (2019). Space-efficient layouts for block stacking warehouse. IISE Transaction, 51(9), 957-971. https://doi.org/10.1080/24725854.2018.1539280

Eksangsri, T., Jaiwang, T. (2014). Feasibility study on reuse of washed water in electronic industry: case study for flexible printed circuit board manufacturing in Thailand. Procedia Environmental Sciences, 20, 206-214. https://doi.org/10.1016/j.proenv.2014.03.027

Fu, M., Kaku, B. K. (1997). Minimizing work-in-process and material handling in the facilities layout problem. IIE Transactions, 29, 29-36. https://doi.org/10.1080/07408179708966309

Halil, F. M., Nasir, N. M., Hassan, A. A., Shukur, A. S. (2016). Feasibility study and economic assessment in green building projects. Procedia-Social and Behavioral Sciences, 222, 56-64. https://doi.org/10.1016/j.sbspro.2016.05.176

Hazaras, M. J., Swartz, C. L. E., Marlin, T. E. (2013). Industrial application of a continuous-time scheduling framework for process analysis and improvement. I&EC research Industrial & Engineering Chemistry Research, 53, 259-273. https://doi.org/10.1021/ie4006904

Hwang, D. K., Cho, K., Moon, J. (2019). Feasibility study on energy audit and data driven analysis procedure for building energy efficiency: bench-marking in Korean hospital buildings. Journal Energy 12(15), 3006. https://doi.org/10.3390/en12153006

Jung, S., Ng, D., Ovalle, C. D., Roman, R, V., Mannan, M. S. (2011). New approach to optimizing the facility sitting and layout for fire and explosion scenarios. I&EC research Industrial & Engineering Chemistry Research, 50, 3928-3937. https://doi.org/10.1021/ie101367g

Kingenberg, W., Boksma, J. D. (2010). A conceptual framework for outsourcing of material handling activities in automotive: differentiation and implementation. International Journal of Production Research, 48(16), 4877-4899. https://doi.org/10.1080/00207540903067177

Kovàcs, G. (2019). Layout design for efficiency improvement and cost reduction. Bull. Pol. Ac.: Tech., 67(3), 547-555. https://doi.org/10.24425%2Fbpasts.2019.129653

Ma, T., Yang, H., Lu. L., Qi, R. (2017). Feasibility study of developing a zero-carbon-emission green deck in Hong Kong. Energy Procedia 105, 1155-1159. https://doi.org/10.1016/j.egypro.2017.03.487

Morgan, B., Hejdenberg, J., Krapels, S. H., Amstrong, D. (2018). DO feasibility studies contribute to, or avoid, waste in research? PLos ONE 13(4), e0195951. https://doi.org/10.1371/journal.pone.0195951

Pòvoa, A. P. B., (2002). Optimal design and layout of industrial facilities: a simultaneous approach. Ind. Eng. Chem. Res, 41, 3601-3609. https://doi.org/10.1021/ie010660s

Schaller, J. (2008). Incorporating cellular manufacturing into supply chain design. International Journal of Production Research, 46(17), 4925-4945. https://doi.org/10.1080/00207540701348761

Stephens, M. P., Meyers, F. E., (2013). Manufacturing facilities design and material handling - fifth edition. Purdue University Press, West Lafayette, Indiana.

Sun, L., Luan, F., Pian, J. (2015). An effective approach for scheduling of refining process with uncertain iterations in steel-making and continuous casting process. IFAC-PapersOnLine, 48(3), 1966-1972. https://doi.org/10.1016/j.ifacol.2015.06.376

Yang, Z., Djurdjanovic, D., Ni, J. (2007). Maintenance scheduling for a manufacturing system of machines with adjustable throughput. IIE Transactions, 39, 1111-1125. https://doi.org/10.1080/07408170701315339

[-]

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem