Mostrar el registro completo del ítem
Lozano-Galant, JA.; Paya-Zaforteza, I. (2017). Analysis of Eduardo Torroja's Tempul Aqueduct an important precursor of modern cable-stayed bridges, extradosed bridges and prestressed concrete. Engineering Structures. 150:955-968. https://doi.org/10.1016/j.engstruct.2017.07.057
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/140235
Título: | Analysis of Eduardo Torroja's Tempul Aqueduct an important precursor of modern cable-stayed bridges, extradosed bridges and prestressed concrete | |
Autor: | Lozano-Galant, José Antonio | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] This paper describes a study of the Tempul Aqueduct, one of the first structures designed and built by Eduardo Torroja. At a time when computers did not exist, Torroja's courage and innovation were outstanding. He was ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reserva de todos los derechos | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | https://doi.org/10.1016/j.engstruct.2017.07.057 | |
Código del Proyecto: |
|
|
Agradecimientos: |
Funding for this research has been provided to Mr Lozano-Galant by the Spanish Ministry of Economy, Industry and Competitiveness (Research Project BIA2013-47290-R from FEDER funds). The authors are also grateful to Prof. ...[+]
|
|
Tipo: |
|