Aloulou, M. A., Dolgui, A., & Kovalyov, M. Y. (2013). A bibliography of non-deterministic lot-sizing models. International Journal of Production Research, 52(8), 2293-2310. doi:10.1080/00207543.2013.855336
Baker, K. R. (1977). AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING. Decision Sciences, 8(1), 19-27. doi:10.1111/j.1540-5915.1977.tb01065.x
Bellman, R. E., & Zadeh, L. A. (1970). Decision-Making in a Fuzzy Environment. Management Science, 17(4), B-141-B-164. doi:10.1287/mnsc.17.4.b141
[+]
Aloulou, M. A., Dolgui, A., & Kovalyov, M. Y. (2013). A bibliography of non-deterministic lot-sizing models. International Journal of Production Research, 52(8), 2293-2310. doi:10.1080/00207543.2013.855336
Baker, K. R. (1977). AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING. Decision Sciences, 8(1), 19-27. doi:10.1111/j.1540-5915.1977.tb01065.x
Bellman, R. E., & Zadeh, L. A. (1970). Decision-Making in a Fuzzy Environment. Management Science, 17(4), B-141-B-164. doi:10.1287/mnsc.17.4.b141
Billington, P. J., McClain, J. O., & Thomas, L. J. (1983). Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction. Management Science, 29(10), 1126-1141. doi:10.1287/mnsc.29.10.1126
Campuzano, F., Mula, J., & Peidro, D. (2010). Fuzzy estimations and system dynamics for improving supply chains. Fuzzy Sets and Systems, 161(11), 1530-1542. doi:10.1016/j.fss.2009.12.002
Díaz-Madroñero, M., Mula, J., & Jiménez, M. (2014). Fuzzy goal programming for material requirements planning under uncertainty and integrity conditions. International Journal of Production Research, 52(23), 6971-6988. doi:10.1080/00207543.2014.920115
Dolgii, A. B. (2001). Automation and Remote Control, 62(12), 2020-2026. doi:10.1023/a:1013776612532
Dolgui, A., & Ould-Louly, M.-A. (2002). A model for supply planning under lead time uncertainty. International Journal of Production Economics, 78(2), 145-152. doi:10.1016/s0925-5273(00)00180-8
Dolgui, A., & Prodhon, C. (2007). Supply planning under uncertainties in MRP environments: A state of the art. Annual Reviews in Control, 31(2), 269-279. doi:10.1016/j.arcontrol.2007.02.007
Dolgui, A., Portmann, M.-C., & Proth, J.-M. (1995). Planification de systèmes d’assemblage avec approvisionnements aléatoires en composants. Journal of Decision Systems, 4(4), 255-278. doi:10.1080/12460125.1995.10511659
DOLGUI, A., BEN AMMAR, O., HNAIEN, F., & LOULY, M. A. O. (2013). A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty. Studies in Informatics and Control, 22(3). doi:10.24846/v22i3y201302
Grabot, B., Geneste, L., Reynoso-Castillo, G., & V�rot, S. (2005). Integration of uncertain and imprecise orders in the MRP method. Journal of Intelligent Manufacturing, 16(2), 215-234. doi:10.1007/s10845-004-5890-x
Grubbström, R. W., & Tang, O. (1999). Further developments on safety stocks in an MRP system applying Laplace transforms and input–output analysis. International Journal of Production Economics, 60-61, 381-387. doi:10.1016/s0925-5273(98)00141-8
Guillaume, R., Thierry, C., & Grabot, B. (2010). Modelling of ill-known requirements and integration in production planning. Production Planning & Control, 22(4), 336-352. doi:10.1080/09537281003800900
HO, C.-J. (1989). Evaluating the impact of operating environments on MRP system nervousness. International Journal of Production Research, 27(7), 1115-1135. doi:10.1080/00207548908942611
Jiménez, M., Arenas, M., Bilbao, A., & Rodrı´guez, M. V. (2007). Linear programming with fuzzy parameters: An interactive method resolution. European Journal of Operational Research, 177(3), 1599-1609. doi:10.1016/j.ejor.2005.10.002
Karni, R. (1981). Integer linear programming formulation of the material requirements planning problem. Journal of Optimization Theory and Applications, 35(2), 217-230. doi:10.1007/bf00934577
Li, T., Lin, P., Sun, G.-J., & Liu, H.-H. (2009). Application of Fuzzy Programming with Recourse in Material Requirement Planning Problem. 2009 International Conference on Measuring Technology and Mechatronics Automation. doi:10.1109/icmtma.2009.568
Lin, C.-C. (2004). A weighted max–min model for fuzzy goal programming. Fuzzy Sets and Systems, 142(3), 407-420. doi:10.1016/s0165-0114(03)00092-7
Ould-Louly, M.-A., & Dolgui, A. (2002). Generalized newsboy model to compute the optimal planned lead times in assembly systems. International Journal of Production Research, 40(17), 4401-4414. doi:10.1080/00207540210158825
Louly, M.-A., & Dolgui, A. (2011). Optimal time phasing and periodicity for MRP with POQ policy. International Journal of Production Economics, 131(1), 76-86. doi:10.1016/j.ijpe.2010.04.042
Louly, M.-A., & Dolgui, A. (2013). Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint. International Journal of Production Economics, 143(1), 35-40. doi:10.1016/j.ijpe.2011.02.009
Louly, M. A., Dolgui, A., & Hnaien, F. (2008). Optimal supply planning in MRP environments for assembly systems with random component procurement times. International Journal of Production Research, 46(19), 5441-5467. doi:10.1080/00207540802273827
Louly, M.-A., Dolgui, A., & Hnaien, F. (2008). Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint. International Journal of Production Economics, 115(1), 236-247. doi:10.1016/j.ijpe.2008.06.005
Mula, J., Poler, R., & Garcia, J. P. (2006). MRP with flexible constraints: A fuzzy mathematical programming approach. Fuzzy Sets and Systems, 157(1), 74-97. doi:10.1016/j.fss.2005.05.045
Mula, J., Poler, R., García-Sabater, J. P., & Lario, F. C. (2006). Models for production planning under uncertainty: A review. International Journal of Production Economics, 103(1), 271-285. doi:10.1016/j.ijpe.2005.09.001
Mula, J., Poler, R., & Garcia-Sabater, J. P. (2007). Material Requirement Planning with fuzzy constraints and fuzzy coefficients. Fuzzy Sets and Systems, 158(7), 783-793. doi:10.1016/j.fss.2006.11.003
Mula, J., Poler, R., & Garcia-Sabater, J. P. (2008). Capacity and material requirement planning modelling by comparing deterministic and fuzzy models. International Journal of Production Research, 46(20), 5589-5606. doi:10.1080/00207540701413912
Mula, J., Peidro, D., & Poler, R. (2010). The effectiveness of a fuzzy mathematical programming approach for supply chain production planning with fuzzy demand. International Journal of Production Economics, 128(1), 136-143. doi:10.1016/j.ijpe.2010.06.007
Mula, J., Lyons, A. C., Hernández, J. E., & Poler, R. (2014). An integer linear programming model to support customer-driven material planning in synchronised, multi-tier supply chains. International Journal of Production Research, 52(14), 4267-4278. doi:10.1080/00207543.2013.878055
Ould-Louly, M.-A., & Dolgui, A. (2004). The MPS parameterization under lead time uncertainty. International Journal of Production Economics, 90(3), 369-376. doi:10.1016/j.ijpe.2003.08.008
Peidro, D., Mula, J., Poler, R., & Verdegay, J.-L. (2009). Fuzzy optimization for supply chain planning under supply, demand and process uncertainties. Fuzzy Sets and Systems, 160(18), 2640-2657. doi:10.1016/j.fss.2009.02.021
Peidro, D., Mula, J., Poler, R., & Lario, F.-C. (2008). Quantitative models for supply chain planning under uncertainty: a review. The International Journal of Advanced Manufacturing Technology, 43(3-4), 400-420. doi:10.1007/s00170-008-1715-y
Peidro, D., Mula, J., Jiménez, M., & del Mar Botella, M. (2010). A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment. European Journal of Operational Research, 205(1), 65-80. doi:10.1016/j.ejor.2009.11.031
PROTH, J. M., MAUROY, G., WARDI, Y., CHU, C., & XIE, X. L. (1997). Journal of Intelligent Manufacturing, 8(5), 385-403. doi:10.1023/a:1018506232008
Romero, C. (2001). Extended lexicographic goal programming: a unifying approach. Omega, 29(1), 63-71. doi:10.1016/s0305-0483(00)00026-8
Tiwari, R. N., Dharmar, S., & Rao, J. R. (1987). Fuzzy goal programming — An additive model. Fuzzy Sets and Systems, 24(1), 27-34. doi:10.1016/0165-0114(87)90111-4
Torabi, S. A., & Hassini, E. (2008). An interactive possibilistic programming approach for multiple objective supply chain master planning. Fuzzy Sets and Systems, 159(2), 193-214. doi:10.1016/j.fss.2007.08.010
Van Broekhoven, E., & De Baets, B. (2006). Fast and accurate center of gravity defuzzification of fuzzy system outputs defined on trapezoidal fuzzy partitions. Fuzzy Sets and Systems, 157(7), 904-918. doi:10.1016/j.fss.2005.11.005
Verdegay, J. L. (2015). Progress on Fuzzy Mathematical Programming: A personal perspective. Fuzzy Sets and Systems, 281, 219-226. doi:10.1016/j.fss.2015.08.023
Whybark, D. C., & Williams, J. G. (1976). MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY. Decision Sciences, 7(4), 595-606. doi:10.1111/j.1540-5915.1976.tb00704.x
Wijngaard, J., & Wortmann, J. C. (1985). MRP and inventories. European Journal of Operational Research, 20(3), 281-293. doi:10.1016/0377-2217(85)90001-3
Yano, C. A. (1987). Planned Leadtimes For Serial Production Systems. IIE Transactions, 19(3), 300-307. doi:10.1080/07408178708975400
Yano, C. A. (1987). Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs. Management Science, 33(1), 95-106. doi:10.1287/mnsc.33.1.95
Yano, C. A. (1987). Stochastic Leadtimes in Two-Level Assembly Systems. IIE Transactions, 19(4), 371-378. doi:10.1080/07408178708975409
Zadeh, L. A. (1965). Fuzzy sets. Information and Control, 8(3), 338-353. doi:10.1016/s0019-9958(65)90241-x
Zimmermann, H.-J. (1978). Fuzzy programming and linear programming with several objective functions. Fuzzy Sets and Systems, 1(1), 45-55. doi:10.1016/0165-0114(78)90031-3
[-]