- -

Demand Driven MRP – The need to standardise an implementation process

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Demand Driven MRP – The need to standardise an implementation process

Mostrar el registro completo del ítem

Orue, A.; Lizarralde, A.; Kortabarria, A. (2020). Demand Driven MRP – The need to standardise an implementation process. International Journal of Production Management and Engineering. 8(2):65-73. https://doi.org/10.4995/ijpme.2020.12737

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/148536

Ficheros en el ítem

Metadatos del ítem

Título: Demand Driven MRP – The need to standardise an implementation process
Autor: Orue, A. Lizarralde, A. Kortabarria, A.
Fecha difusión:
Resumen:
[EN] Since the creation of the demand-driven material requirement planning (DDMRP) model, numerous studies have analysed the methodology’s significant impact on different organisations. Several successful cases and research ...[+]
Palabras clave: Demand Driven MRP , DDMRP , Process standardisation
Derechos de uso: Reconocimiento - No comercial - Sin obra derivada (by-nc-nd)
Fuente:
International Journal of Production Management and Engineering. (eissn: 2340-4876 )
DOI: 10.4995/ijpme.2020.12737
Editorial:
Universitat Politècnica de València
Versión del editor: https://doi.org/10.4995/ijpme.2020.12737
Tipo: Artículo

References

Bahu, B., Bironneau, L., Hovelaque, V. (2019). Compréhension du DDMRP et de son adoption: Premiers éléments empiriques. Logistique & Management, 1-13. https://doi.org/10.1080/12507970.2018.1547130

De La Calle, A., Grus, M.E., Álvarez, E. (2017). Value creation through demand and supply chains: Evidences from Spanish companies. Direccion y Organizacion, 61, 4-11.

Dessevre, G., Martin, G., Pellerin, R., Lamothe, J., Lauras, M. (2019). Decoupled Lead Time in finite capacity flowshop: A feedback loop approach. 2019 International Conference on Industrial Engineering and Systems Management (IESM), 1-6. https://doi.org/10.1109/IESM45758.2019.8948198 [+]
Bahu, B., Bironneau, L., Hovelaque, V. (2019). Compréhension du DDMRP et de son adoption: Premiers éléments empiriques. Logistique & Management, 1-13. https://doi.org/10.1080/12507970.2018.1547130

De La Calle, A., Grus, M.E., Álvarez, E. (2017). Value creation through demand and supply chains: Evidences from Spanish companies. Direccion y Organizacion, 61, 4-11.

Dessevre, G., Martin, G., Pellerin, R., Lamothe, J., Lauras, M. (2019). Decoupled Lead Time in finite capacity flowshop: A feedback loop approach. 2019 International Conference on Industrial Engineering and Systems Management (IESM), 1-6. https://doi.org/10.1109/IESM45758.2019.8948198

Favaretto, D., Marin, A. (2018). An Empirical Comparison Study Between DDMRP and MRP in Material Management. SSRN Electronic Journal. https://doi.org/10.2139/ssrn.3305114

Fomin, V., Lyytinen, K. (2000). How to Distribute a Cake before Cutting It into Pieces: Alice in Wonderland or Radio Engineers' Gang in the Nordic Countries?. In Jakobs, K. (Ed.), Information Technology Standards and Standardization: A Global Perspective (pp. 222-239). IGI Global. https://doi.org/10.4018/978-1-878289-70-4.ch014

Gupta, M.C., Boyd, L.H. (2008). Theory of constraints: A theory for operations management. International Journal of Operations & Production Management, 28(10), 991-1012. https://doi.org/10.1108/01443570810903122

Ihme, M., Stratton, R. (2015). Evaluating Demand Driven MRP: A case based simulated study. In International Conference of the European Operations Management Association (1-10). Retrieved from http://irep.ntu.ac.uk/id/eprint/26668/

ISO, I. S. O. (2005). 9000-Quality management systems-Fundamentals and vocabulary. Quality Management Systems, Berlin: Beuth Verlag GmbH, 22-25.

Jang, Y., Lee, J. (1998). Factors influencing the success of management consulting projects. International Journal of Project Management, 16(2), 67-72. https://doi.org/10.1016/S0263-7863(97)00005-7

Jiang, J., Rim, S.C.C. (2017). Strategic WIP Inventory Positioning for Make-to-Order Production with Stochastic Processing Times. Mathematical Problems in Engineering, 2017, 1-7. https://doi.org/10.1155/2017/8635979

Jiang, J., Rim, S. C. (2016). Strategic Inventory Positioning in BOM with Multiple Parents Using ASR Lead Time. Mathematical Problems in Engineering, 2016, 1-9. https://doi.org/10.1155/2016/9328371

Kitchenham, B. (2004). Procedures for performing systematic reviews. Keele, UK, Keele University.

Koren, Y. (2010). The global manufacturing revolution: product-process-business integration and reconfigurable systems (Vol. 80). John Wiley & Sons. https://doi.org/10.1002/9780470618813

Kortabarria, A., Apaolaza, U., Lizarralde, A., Amorrortu, I. (2018). Material management without forecasting: From MRP to demand driven MRP. Journal of Industrial Engineering and Management, 11(4), 632. https://doi.org/10.3926/jiem.2654

Lee, C.J., Rim, S.C. (2019). A Mathematical Safety Stock Model for DDMRP Inventory Replenishment. Mathematical Problems in Engineering, 2019, 1-10. https://doi.org/10.1155/2019/6496309

Lizarralde, A., Apaolaza, U., Mediavilla, M. (2020). A Strategic Approach for Bottleneck Identification in Make-to-Order Environments: A Drum-Buffer-Rope Action Research Based Case Study. Journal of Industrial Engineering and Management, 13(1), 18-37. https://doi.org/10.3926/jiem.2868

Martin, G., Baptiste, P., Lamothe, J., Miclo, R., Lauras, M., & Albi, M. (2018). A process map for the Demand Driven Adaptive Enterprise model: Towards an explicit cartography 3. The cartography: how to represent the complete Demand Driven Adaptive. In 7 th International Conference on Information Systems, Logistics and Supply Chain (664-672). Retrieved from https://hal-mines-albi.archives-ouvertes.fr/hal-01883504/

Miclo, R., Fontanili, F., Lauras, M., Lamothe, J., Milian, B. (2016a). An empirical comparison of MRPII and Demand-Driven MRP. IFACPapersOnLine, 49(12), 1725-1730. https://doi.org/10.1016/j.ifacol.2016.07.831

Miclo, R., Fontanili, F., Lauras, M., Lamothe, J., Milian, B. (2016b). MRP vs. Demand-driven MRP: Towards an objective comparison. Proceedings of 2015 International Conference on Industrial Engineering and Systems Management, IEEE IESM 2015, (October), 1072-1080. https://doi.org/10.1109/IESM.2015.7380288

Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A. (2019). Demand Driven MRP: Assessment of a new approach to materials management. International Journal of Production Research, 57(1), 166-181. https://doi.org/10.1080/00207543.2018.1464230

Münstermann, B., Weitzel, T. (2008). What Is Process Standardization? (Vol. 64). Retrieved from http://aisel.aisnet.org/confirm2008/64

Pretorius, P. (2014). Introducing in-between decision points to TOC ' s five focusing steps. International Journal of Production Research, (November), 37-41. https://doi.org/10.1080/00207543.2013.836612

Ptak, C.A., Smith, C. (2016). Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Incorporated.

Ramakumar, A., Quality, B.C. (2004), U. (n.d.). Process standardization proves profitable: the demand for higher product quality has resulted in an increasingly complex value chain. BNP Media. Retrieved from https://scholar.google.es/scholar?hl=es&as_sdt=0%2C5&q=ramakumar+y+cooper+2004&btnG=

Shofa, M.J., Moeis, A.O., Restiana, N. (2018). Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP. In IOP Conference Series: Materials Science and Engineering (Vol. 337, p. 012055). IOP Publishing. https://doi.org/10.1088/1757-899X/337/1/012055

Shofa, M.J., Widyarto, W.O. (2017). Effective production control in an automotive industry: MRP vs. demand-driven MRP. In AIP Conference Proceedings (Vol. 1855, p. 020004). AIP Publishing LLC. https://doi.org/10.1097/01.ju.0000143904.17666.0b

Smith, B.D., Smith, C. (2013, November 1). Becoming demand-driven: How to change from push and promote to position and pull. Strategic Finance, 95(November), 37-45. Retrieved from https://go.galegroup.com/ps/i.do?p=AONE&sw=w&u=googlescholar&v=2.1&it=r&id=GALE%7CA349741171&sid=googleScholar&asid=052f118f

Stevenson, M., Hendry, L.C., Kingsman, B.G. (2005). A review of production planning and control: The applicability of key concepts to the maketo-order industry. International Journal of Production Research, 43(5), 869-898. https://doi.org/10.1080/0020754042000298520

Swaminathan, J.M. (2001). Enabling Customization Using Standardized Operations. California Management Review, 43(3), 125-135. https://doi.org/10.2307/41166092

Trojan, J., Pekarčíková, M., Kliment, M., Trebuňa, P. (2019). Demand driven material requirements planning. Some methodical and practical comments. Management and Production Engineering Review, 10(2), 50-59. https://doi.org/10.24425/mper.2019.129568

Velasco Acosta, A.P., Mascle, C., Baptiste, P. (2019). Applicability of Demand-Driven MRP in a complex manufacturing environment. International Journal of Production Research, 0(0), 1-13. https://doi.org/10.1080/00207543.2019.1650978

[-]

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem