- -

Demand Driven MRP – The need to standardise an implementation process

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Demand Driven MRP – The need to standardise an implementation process

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Orue, A. es_ES
dc.contributor.author Lizarralde, A. es_ES
dc.contributor.author Kortabarria, A. es_ES
dc.date.accessioned 2020-07-23T08:26:36Z
dc.date.available 2020-07-23T08:26:36Z
dc.date.issued 2020-07-18
dc.identifier.uri http://hdl.handle.net/10251/148536
dc.description.abstract [EN] Since the creation of the demand-driven material requirement planning (DDMRP) model, numerous studies have analysed the methodology’s significant impact on different organisations. Several successful cases and research studies into DDMRP have demonstrated that the methodology is beneficial to organisations because it increases their service level and stock adjustments; however, there is a dearth of literature regarding the steps necessary to implement this model successfully. This document delivers a systematic review of the literature based on the work done by Kitchenham (2004) with the aim of analysing studies that investigate the standardization of the process of implementing the model. Once the lack of research has been demonstrated, a possible line of future research can be outlined to standardise the implementation process of the DDMRP model to achieve its full potential. es_ES
dc.language Inglés es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.relation.ispartof International Journal of Production Management and Engineering es_ES
dc.rights Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) es_ES
dc.subject Demand Driven MRP es_ES
dc.subject DDMRP es_ES
dc.subject Process standardisation es_ES
dc.title Demand Driven MRP – The need to standardise an implementation process es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.4995/ijpme.2020.12737
dc.rights.accessRights Abierto es_ES
dc.description.bibliographicCitation Orue, A.; Lizarralde, A.; Kortabarria, A. (2020). Demand Driven MRP – The need to standardise an implementation process. International Journal of Production Management and Engineering. 8(2):65-73. https://doi.org/10.4995/ijpme.2020.12737 es_ES
dc.description.accrualMethod OJS es_ES
dc.relation.publisherversion https://doi.org/10.4995/ijpme.2020.12737 es_ES
dc.description.upvformatpinicio 65 es_ES
dc.description.upvformatpfin 73 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 8 es_ES
dc.description.issue 2 es_ES
dc.identifier.eissn 2340-4876
dc.relation.pasarela OJS\12737 es_ES
dc.description.references Bahu, B., Bironneau, L., Hovelaque, V. (2019). Compréhension du DDMRP et de son adoption: Premiers éléments empiriques. Logistique & Management, 1-13. https://doi.org/10.1080/12507970.2018.1547130 es_ES
dc.description.references De La Calle, A., Grus, M.E., Álvarez, E. (2017). Value creation through demand and supply chains: Evidences from Spanish companies. Direccion y Organizacion, 61, 4-11. es_ES
dc.description.references Dessevre, G., Martin, G., Pellerin, R., Lamothe, J., Lauras, M. (2019). Decoupled Lead Time in finite capacity flowshop: A feedback loop approach. 2019 International Conference on Industrial Engineering and Systems Management (IESM), 1-6. https://doi.org/10.1109/IESM45758.2019.8948198 es_ES
dc.description.references Favaretto, D., Marin, A. (2018). An Empirical Comparison Study Between DDMRP and MRP in Material Management. SSRN Electronic Journal. https://doi.org/10.2139/ssrn.3305114 es_ES
dc.description.references Fomin, V., Lyytinen, K. (2000). How to Distribute a Cake before Cutting It into Pieces: Alice in Wonderland or Radio Engineers' Gang in the Nordic Countries?. In Jakobs, K. (Ed.), Information Technology Standards and Standardization: A Global Perspective (pp. 222-239). IGI Global. https://doi.org/10.4018/978-1-878289-70-4.ch014 es_ES
dc.description.references Gupta, M.C., Boyd, L.H. (2008). Theory of constraints: A theory for operations management. International Journal of Operations & Production Management, 28(10), 991-1012. https://doi.org/10.1108/01443570810903122 es_ES
dc.description.references Ihme, M., Stratton, R. (2015). Evaluating Demand Driven MRP: A case based simulated study. In International Conference of the European Operations Management Association (1-10). Retrieved from http://irep.ntu.ac.uk/id/eprint/26668/ es_ES
dc.description.references ISO, I. S. O. (2005). 9000-Quality management systems-Fundamentals and vocabulary. Quality Management Systems, Berlin: Beuth Verlag GmbH, 22-25. es_ES
dc.description.references Jang, Y., Lee, J. (1998). Factors influencing the success of management consulting projects. International Journal of Project Management, 16(2), 67-72. https://doi.org/10.1016/S0263-7863(97)00005-7 es_ES
dc.description.references Jiang, J., Rim, S.C.C. (2017). Strategic WIP Inventory Positioning for Make-to-Order Production with Stochastic Processing Times. Mathematical Problems in Engineering, 2017, 1-7. https://doi.org/10.1155/2017/8635979 es_ES
dc.description.references Jiang, J., Rim, S. C. (2016). Strategic Inventory Positioning in BOM with Multiple Parents Using ASR Lead Time. Mathematical Problems in Engineering, 2016, 1-9. https://doi.org/10.1155/2016/9328371 es_ES
dc.description.references Kitchenham, B. (2004). Procedures for performing systematic reviews. Keele, UK, Keele University. es_ES
dc.description.references Koren, Y. (2010). The global manufacturing revolution: product-process-business integration and reconfigurable systems (Vol. 80). John Wiley & Sons. https://doi.org/10.1002/9780470618813 es_ES
dc.description.references Kortabarria, A., Apaolaza, U., Lizarralde, A., Amorrortu, I. (2018). Material management without forecasting: From MRP to demand driven MRP. Journal of Industrial Engineering and Management, 11(4), 632. https://doi.org/10.3926/jiem.2654 es_ES
dc.description.references Lee, C.J., Rim, S.C. (2019). A Mathematical Safety Stock Model for DDMRP Inventory Replenishment. Mathematical Problems in Engineering, 2019, 1-10. https://doi.org/10.1155/2019/6496309 es_ES
dc.description.references Lizarralde, A., Apaolaza, U., Mediavilla, M. (2020). A Strategic Approach for Bottleneck Identification in Make-to-Order Environments: A Drum-Buffer-Rope Action Research Based Case Study. Journal of Industrial Engineering and Management, 13(1), 18-37. https://doi.org/10.3926/jiem.2868 es_ES
dc.description.references Martin, G., Baptiste, P., Lamothe, J., Miclo, R., Lauras, M., & Albi, M. (2018). A process map for the Demand Driven Adaptive Enterprise model: Towards an explicit cartography 3. The cartography: how to represent the complete Demand Driven Adaptive. In 7 th International Conference on Information Systems, Logistics and Supply Chain (664-672). Retrieved from https://hal-mines-albi.archives-ouvertes.fr/hal-01883504/ es_ES
dc.description.references Miclo, R., Fontanili, F., Lauras, M., Lamothe, J., Milian, B. (2016a). An empirical comparison of MRPII and Demand-Driven MRP. IFACPapersOnLine, 49(12), 1725-1730. https://doi.org/10.1016/j.ifacol.2016.07.831 es_ES
dc.description.references Miclo, R., Fontanili, F., Lauras, M., Lamothe, J., Milian, B. (2016b). MRP vs. Demand-driven MRP: Towards an objective comparison. Proceedings of 2015 International Conference on Industrial Engineering and Systems Management, IEEE IESM 2015, (October), 1072-1080. https://doi.org/10.1109/IESM.2015.7380288 es_ES
dc.description.references Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A. (2019). Demand Driven MRP: Assessment of a new approach to materials management. International Journal of Production Research, 57(1), 166-181. https://doi.org/10.1080/00207543.2018.1464230 es_ES
dc.description.references Münstermann, B., Weitzel, T. (2008). What Is Process Standardization? (Vol. 64). Retrieved from http://aisel.aisnet.org/confirm2008/64 es_ES
dc.description.references Pretorius, P. (2014). Introducing in-between decision points to TOC ' s five focusing steps. International Journal of Production Research, (November), 37-41. https://doi.org/10.1080/00207543.2013.836612 es_ES
dc.description.references Ptak, C.A., Smith, C. (2016). Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Incorporated. es_ES
dc.description.references Ramakumar, A., Quality, B.C. (2004), U. (n.d.). Process standardization proves profitable: the demand for higher product quality has resulted in an increasingly complex value chain. BNP Media. Retrieved from https://scholar.google.es/scholar?hl=es&as_sdt=0%2C5&q=ramakumar+y+cooper+2004&btnG= es_ES
dc.description.references Shofa, M.J., Moeis, A.O., Restiana, N. (2018). Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP. In IOP Conference Series: Materials Science and Engineering (Vol. 337, p. 012055). IOP Publishing. https://doi.org/10.1088/1757-899X/337/1/012055 es_ES
dc.description.references Shofa, M.J., Widyarto, W.O. (2017). Effective production control in an automotive industry: MRP vs. demand-driven MRP. In AIP Conference Proceedings (Vol. 1855, p. 020004). AIP Publishing LLC. https://doi.org/10.1097/01.ju.0000143904.17666.0b es_ES
dc.description.references Smith, B.D., Smith, C. (2013, November 1). Becoming demand-driven: How to change from push and promote to position and pull. Strategic Finance, 95(November), 37-45. Retrieved from https://go.galegroup.com/ps/i.do?p=AONE&sw=w&u=googlescholar&v=2.1&it=r&id=GALE%7CA349741171&sid=googleScholar&asid=052f118f es_ES
dc.description.references Stevenson, M., Hendry, L.C., Kingsman, B.G. (2005). A review of production planning and control: The applicability of key concepts to the maketo-order industry. International Journal of Production Research, 43(5), 869-898. https://doi.org/10.1080/0020754042000298520 es_ES
dc.description.references Swaminathan, J.M. (2001). Enabling Customization Using Standardized Operations. California Management Review, 43(3), 125-135. https://doi.org/10.2307/41166092 es_ES
dc.description.references Trojan, J., Pekarčíková, M., Kliment, M., Trebuňa, P. (2019). Demand driven material requirements planning. Some methodical and practical comments. Management and Production Engineering Review, 10(2), 50-59. https://doi.org/10.24425/mper.2019.129568 es_ES
dc.description.references Velasco Acosta, A.P., Mascle, C., Baptiste, P. (2019). Applicability of Demand-Driven MRP in a complex manufacturing environment. International Journal of Production Research, 0(0), 1-13. https://doi.org/10.1080/00207543.2019.1650978 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem