Baumgartner, J. P. 2001. “Prices and Costs in the Railway Sector.” Laboratoire d'Intermodalité des Transports et de Planification. École Polytechnique Fédérale de Lausanne. Accessed February 4. http://litep.epfl.ch–2014
Calvo, F., and J. de Oña. 2012a. “An Approach to Mark-Ups through Capacity Charges.”Proceedings of the ICE – Transport. Accessed February 4. http://www.icevirtuallibrary.com/content/article/10.1680/tran.11.00050.
Calvo, F., & De Oña, J. (2012). Are rail charges connected to costs? Journal of Transport Geography, 22, 28-33. doi:10.1016/j.jtrangeo.2011.11.004
[+]
Baumgartner, J. P. 2001. “Prices and Costs in the Railway Sector.” Laboratoire d'Intermodalité des Transports et de Planification. École Polytechnique Fédérale de Lausanne. Accessed February 4. http://litep.epfl.ch–2014
Calvo, F., and J. de Oña. 2012a. “An Approach to Mark-Ups through Capacity Charges.”Proceedings of the ICE – Transport. Accessed February 4. http://www.icevirtuallibrary.com/content/article/10.1680/tran.11.00050.
Calvo, F., & De Oña, J. (2012). Are rail charges connected to costs? Journal of Transport Geography, 22, 28-33. doi:10.1016/j.jtrangeo.2011.11.004
Calvo, F., de Oña, J., López, G., Garach, L., & de Oña, R. (2013). Rail track costs management for efficient railway charges. Proceedings of the Institution of Civil Engineers - Transport, 166(6), 325-335. doi:10.1680/tran.11.00001
Calvo, F., de Oña, J., & Nash, A. (2007). Proposed Infrastructure Pricing Methodology for Mixed-Use Rail Networks. Transportation Research Record: Journal of the Transportation Research Board, 1995(1), 9-16. doi:10.3141/1995-02
CENIT, TIS PT, IWW, and HERRY. 2007. “RailCalc. Calculation of Charges for the Use of Rail Infrastructure.” Prepared for the European Commission Directorate General for Energy and Transport. Accessed February 4. http://ec.europa.eu/transport/rail/legislation/doc/railcalc_discussion_paper_final.pdf.
ECMT (European Conference of Ministers of Transport). 2005. “Charges for the Use of Infrastructure in ECMT Railways.” Draft final report. ECMT/CS/CF(2005)1/REV1. Accessed February 4. http://lnweb90.worldbank.org/ECA/Transport.nsf/ECADocByUnid/2CF8BE276F63A37D85256FB20043A05D?Opendocument.
EPFL (Ecole Polytechnique Féderale de Lausanne). 2003. “IMPROVERAIL: IMPROVEd Tools for RAILway Capacity and Access Management.” Accessed February 4. http://litep.epfl.ch.
Network Rail. 2006. “Usage Costs – Assessment Methodology.” Draft for consultation. Accessed February 4. http://www.networkrail.co.uk/browse%20documents/regulatory%20documents/access%20charges%20reviews/consultations%20on%20future%20charging/variable%20track%20access%20charges/g-%20usage%20costs%20methodology%20sept%2006.pdf.
Nyström, B., & Söderholm, P. (2010). Selection of maintenance actions using the analytic hierarchy process (AHP): decision-making in railway infrastructure. Structure and Infrastructure Engineering, 6(4), 467-479. doi:10.1080/15732470801990209
ORR (Office of Rail Regulation). 2005. “Revision of Variable Usage and Electrification Asset Usage Charges: Final Report.” Accessed February 4. http://www.rail-reg.gov.uk/upload/pdf/bah_variable-usage-initial-report_jan05.pdf.
Quinet, E. (2003). Short term adjustments in rail activity: the limited role of infrastructure charges. Transport Policy, 10(1), 73-79. doi:10.1016/s0967-070x(02)00047-1
Thomas, J. 2002. “EU Task Force on Rail Infrastructure Charging: Summary Findings on Best Practice in Marginal Cost Pricing.” IMPRINT-EUROPE. Implementing Reform in Transport. Effective Use of Research on Pricing in Europe. A European Commission-funded Thematic Network (2001–2004). Accessed February 4. www.imprint-eu.org/public/Presentations/imprint3_Thomas.ppt.
UIC (International Union of Railways). 2008. “Lasting Infrastructure Cost Benchmarking (LICB).” Summary Report. Accessed February 4. http://www.uic.org/spip.php?article582.
[-]