- -

Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis

Mostrar el registro completo del ítem

Herrera, RF.; Mourgues, C.; Alarcón, LF.; Pellicer, E. (2020). Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis. Journal of Construction Engineering and Management. 146(6):1-13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001841

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/161597

Ficheros en el ítem

Metadatos del ítem

Título: Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis
Autor: Herrera, Rodrigo F. Mourgues, Claudio Alarcón, Luis F. Pellicer, Eugenio
Entidad UPV: Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil
Fecha difusión:
Resumen:
[EN] Social network analysis (SNA) has not been used to study design project teams in which the full interactions have become more complex (formal and informal) because the team members are from different companies and ...[+]
Palabras clave: Interaction , Interaction metrics , Sociograms , Information flow , Design teams , Social networks
Derechos de uso: Reserva de todos los derechos
Fuente:
Journal of Construction Engineering and Management. (issn: 0733-9364 )
DOI: 10.1061/(ASCE)CO.1943-7862.0001841
Editorial:
American Society of Civil Engineers
Versión del editor: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001841
Código del Proyecto:
info:eu-repo/grantAgreement/CONICYT//2018-21180884/
info:eu-repo/grantAgreement/FONDECYT//1181648/
Agradecimientos:
The authors would like to acknowledge the help and support provided by GEPUC and GEPRO SpA., which provided access to data collection for this study. In addition, the authors acknowledge financial support from FONDECYT ...[+]
Tipo: Artículo

References

Alarcón D. M. I. M. Alarcón and L. F. Alarcón. 2013. “Social network analysis: A diagnostic tool for information flow in the AEC industry.” In Proc. 21st Annual Conf. of the Int. Group for Lean Construction 2013 947–956. Fortaleza Brazil: International Group for Lean Construction.

Alarcón, L. F., Ashley, D. B., de Hanily, A. S., Molenaar, K. R., & Ungo, R. (2011). Risk Planning and Management for the Panama Canal Expansion Program. Journal of Construction Engineering and Management, 137(10), 762-771. doi:10.1061/(asce)co.1943-7862.0000317

Al Hattab, M., & Hamzeh, F. (2015). Using social network theory and simulation to compare traditional versus BIM–lean practice for design error management. Automation in Construction, 52, 59-69. doi:10.1016/j.autcon.2015.02.014 [+]
Alarcón D. M. I. M. Alarcón and L. F. Alarcón. 2013. “Social network analysis: A diagnostic tool for information flow in the AEC industry.” In Proc. 21st Annual Conf. of the Int. Group for Lean Construction 2013 947–956. Fortaleza Brazil: International Group for Lean Construction.

Alarcón, L. F., Ashley, D. B., de Hanily, A. S., Molenaar, K. R., & Ungo, R. (2011). Risk Planning and Management for the Panama Canal Expansion Program. Journal of Construction Engineering and Management, 137(10), 762-771. doi:10.1061/(asce)co.1943-7862.0000317

Al Hattab, M., & Hamzeh, F. (2015). Using social network theory and simulation to compare traditional versus BIM–lean practice for design error management. Automation in Construction, 52, 59-69. doi:10.1016/j.autcon.2015.02.014

Austin, R. B., Pishdad-Bozorgi, P., & de la Garza, J. M. (2016). Identifying and Prioritizing Best Practices to Achieve Flash Track Projects. Journal of Construction Engineering and Management, 142(2), 04015077. doi:10.1061/(asce)co.1943-7862.0001061

Baiden, B. K., Price, A. D. F., & Dainty, A. R. J. (2006). The extent of team integration within construction projects. International Journal of Project Management, 24(1), 13-23. doi:10.1016/j.ijproman.2005.05.001

Cash, P., Dekoninck, E. A., & Ahmed-Kristensen, S. (2017). Supporting the development of shared understanding in distributed design teams. Journal of Engineering Design, 28(3), 147-170. doi:10.1080/09544828.2016.1274719

Castillo, T., Alarcón, L. F., & Pellicer, E. (2018). Influence of Organizational Characteristics on Construction Project Performance Using Corporate Social Networks. Journal of Management in Engineering, 34(4), 04018013. doi:10.1061/(asce)me.1943-5479.0000612

Castillo, T., Alarcón, L. F., & Salvatierra, J. L. (2018). Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects. Journal of Construction Engineering and Management, 144(3), 04017120. doi:10.1061/(asce)co.1943-7862.0001443

Craft, R. C., & Leake, C. (2002). The Pareto principle in organizational decision making. Management Decision, 40(8), 729-733. doi:10.1108/00251740210437699

Dainty, A. R. J., Briscoe, G. H., & Millett, S. J. (2001). Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(8), 841-848. doi:10.1080/01446190110089727

Dave B. S. Kubler K. Främling and L. Koskela. 2014. “Addressing information flow in lean production management and control in construction.” In Proc. 22nd Annual Conf. of the Int. Group for Lean Construction 581–592. Oslo Norway: International Group for Lean Construction.

Flores J. J. C. Ruiz D. Alarcón L. F. Alarcón J. L. Salvatierra and I. Alarcón. 2014. “Improving connectivity and information flow in lean organizations—Towards an evidence-based methodology.” In Proc. 22nd Annual Conf. of the Int. Group for Lean Construction 2014 1109–1120. Oslo Norway: International Group for Lean Construction.

Herrera R. F. C. Mourgues and L. F. Alarcón. 2018. “Assessment of lean practices performance and social networks in Chilean airport projects.” In Proc. 26th Annual Conf. of the Int. Group for Lean Construction 2018 603–613. Chennai India: International Group for Lean Construction.

Hickethier G. I. D. Tommelein and B. Lostuvali. 2013. “Social network analysis of information flow in an IPD-project design organization.” In Proc. 21st Annual Conf. of the Int. Group for Lean Construction 2013 319–328. Fortaleza Brazil: International Group for Lean Construction.

Hoppe, B., & Reinelt, C. (2010). Social network analysis and the evaluation of leadership networks. The Leadership Quarterly, 21(4), 600-619. doi:10.1016/j.leaqua.2010.06.004

Karp, N. C., Hauer, K. E., & Sheu, L. (2019). Trusted to Learn: a Qualitative Study of Clerkship Students’ Perspectives on Trust in the Clinical Learning Environment. Journal of General Internal Medicine, 34(5), 662-668. doi:10.1007/s11606-019-04883-1

Kereri, J. O., & Harper, C. M. (2019). Social Networks and Construction Teams: Literature Review. Journal of Construction Engineering and Management, 145(4), 03119001. doi:10.1061/(asce)co.1943-7862.0001628

Kleinsmann, M., Deken, F., Dong, A., & Lauche, K. (2012). Development of design collaboration skills. Journal of Engineering Design, 23(7), 485-506. doi:10.1080/09544828.2011.619499

Knotten, V., Lædre, O., & Hansen, G. K. (2017). Building design management – key success factors. Architectural Engineering and Design Management, 13(6), 479-493. doi:10.1080/17452007.2017.1345718

Long D. and P. Arroyo. 2018. “Language moods and improving project performance.” In Proc. 26th Annual Conf. of the Int. Group for Lean Construction 2018 495–504. Chennai India: International Group for Lean Construction.

Love, P. E. D., Irani, Z., Cheng, E., & LI, H. (2002). A model for supporting inter-organizational relations in the supply chain. Engineering Construction and Architectural Management, 9(1), 2-15. doi:10.1046/j.1365-232x.2002.00225.x

Medina-Mora R. T. Winograd R. Flores and F. Flores. 1992. “The action workflow approach to workflow management technology.” In Proc. Computer Supported Cooperative Work 92 281–288. New York: Association for Computing Machinery.

Ng, S. T., & Tang, Z. (2010). Labour-intensive construction sub-contractors: Their critical success factors. International Journal of Project Management, 28(7), 732-740. doi:10.1016/j.ijproman.2009.11.005

Oluwatayo, A. A., & Amole, D. (2013). Ownership, structure, and performance of architectural firms. Frontiers of Architectural Research, 2(1), 94-106. doi:10.1016/j.foar.2012.12.001

Oviedo-Haito, R. J., Jiménez, J., Cardoso, F. F., & Pellicer, E. (2014). Survival Factors for Subcontractors in Economic Downturns. Journal of Construction Engineering and Management, 140(3), 04013056. doi:10.1061/(asce)co.1943-7862.0000811

Paris, C. R., Salas, E., & Cannon-Bowers, J. A. (2000). Teamwork in multi-person systems: a review and analysis. Ergonomics, 43(8), 1052-1075. doi:10.1080/00140130050084879

Phelps A. F. 2012. “Behavioral factors influencing lean information flow in complex projects.” In Proc. 20th Annual Conf. of the Int. Group for Lean Construction 2012. San Diego: International Group for Lean Construction.

Priven V. and R. Sacks. 2013. “Social network development in Last Planner System implementations.” In Proc. 21st Annual Conf. of the Int. Group for Lean Construction 2013 474–485. Fortaleza Brazil: International Group for Lean Construction.

Pryke, S. (2012). Social Network Analysis in Construction. doi:10.1002/9781118443132

Rahmawati Y. C. Utomo N. Anwar N. P. Negoro and C. B. Nurcahyo. 2014. “A framework of knowledge management for successful group decision in design process.” In Proc. 2014 IEEE Conf. on Open Systems 60–65. Subang Malaysia: IEEE.

Rojas, M. J., Herrera, R. F., Mourgues, C., Ponz-Tienda, J. L., Alarcón, L. F., & Pellicer, E. (2019). BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects. Advances in Civil Engineering, 2019, 1-9. doi:10.1155/2019/9094254

Schöttle A. S. Haghsheno and F. Gehbauer. 2014. “Defining cooperation and collaboration in the context of lean construction.” In Proc. 22nd Annual Conf. of the Int. Group for Lean Construction 1269–1280. Oslo Norway: International Group for Lean Construction.

Schröpfer, V. L. M., Tah, J., & Kurul, E. (2017). Mapping the knowledge flow in sustainable construction project teams using social network analysis. Engineering, Construction and Architectural Management, 24(2), 229-259. doi:10.1108/ecam-08-2015-0124

Scott, J. (2017). Social Network Analysis. doi:10.4135/9781529716597

Searle, J. R. (1969). Speech Acts. doi:10.1017/cbo9781139173438

Segarra L. R. F. Herrera L. F. Alarcón and E. Pellicer. 2017. “Knowledge management and information flow through social networks analysis in Chilean architecture firms.” In Proc. 25th Annual Conf. of the Int. Group for Lean Construction 413–420. Heraklion Greece: International Group for Lean Construction.

Sonnenwald, D. H. (1996). Communication roles that support collaboration during the design process. Design Studies, 17(3), 277-301. doi:10.1016/0142-694x(96)00002-6

Svalestuen F. K. Frøystad F. Drevland S. Ahmad J. Lohne and O. Lædre. 2015. “Key elements to an effective building design team.” In Proc. Int. Conf. on Project Management 838–843. Sapporo Japan: Elsevier.

Sydow, J., & Braun, T. (2018). Projects as temporary organizations: An agenda for further theorizing the interorganizational dimension. International Journal of Project Management, 36(1), 4-11. doi:10.1016/j.ijproman.2017.04.012

Turner, J. R., & Müller, R. (2003). On the nature of the project as a temporary organization. International Journal of Project Management, 21(1), 1-8. doi:10.1016/s0263-7863(02)00020-0

Valentine, M. A., Nembhard, I. M., & Edmondson, A. C. (2015). Measuring Teamwork in Health Care Settings. Medical Care, 53(4), e16-e30. doi:10.1097/mlr.0b013e31827feef6

Wesz, J. G. B., Formoso, C. T., & Tzortzopoulos, P. (2018). Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(2), 134-152. doi:10.1108/ecam-02-2016-0045

Wong, P. S. P., Demertjis, M., Hardie, M., & Lo, C. yiu. (2014). The effect of unlearning on organisational learning behaviour and performance in construction contracting organisations. International Journal of Project Organisation and Management, 6(3), 197. doi:10.1504/ijpom.2014.065256

Zhang, L., & Ashuri, B. (2018). BIM log mining: Discovering social networks. Automation in Construction, 91, 31-43. doi:10.1016/j.autcon.2018.03.009

[-]

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem